Vallen on the Move in Fort St, John, BC

CEW 15 LB Vallen 400

 August 6, 2021

 After operating out of a small branch in Fort St. John, BC for four years, Vallen has moved to a larger branch more suitable to its growing operations. With local success Vallen has invested in a longer-term branch location with lots of room to grow.

The new location is at 8916 109 St., Fort St. John, BC V1J 6H4; 250-262-7445.

Maintaining health and safety being its top priority, Vallen was able to complete the move successfully despite COVID-19 playing havoc with supply, logistics and transportation.

Vallen gives a special shout-out to

• Vallen’s IT Team and telecommunication companies to “connect them up” after the initial service request was delayed beyond the opening date

• The moving team who drove from their home locations to work the move (2.5 hours from Grande Prairie, 7 hours from Edmonton).

• 9 dedicated trucks at the site to ensure safe transport in limited sized groups for everyone involved.

Vallen provides safety, janitorial and MRO (maintenance, repair, and operations) products and services to businesses across Canada.

Source

Related Articles


Latest Articles

  • Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…

  • Lighting Control Basics for Home Automation

    Lighting Control Basics for Home Automation

    By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology?  Or are you a true believer?  As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…

  • Grounded in Ontario: The Future of Energy Storage Systems

    Grounded in Ontario: The Future of Energy Storage Systems

    December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…

  • 4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…


Changing Scene