BC SunMine Solar Facility Exceeds Expectations

SunMine

The 1.05 MW (megawatt) solar project is BC’s first grid-connected solar facility, as well as Canada’s largest project to use solar trackers. Production data since June 22 confirm that the energy being generated by the SunMine is exceeding the modelled design potential. SunMine is supplying enough electricity to the BC Hydro grid to power approximately 200 homes.

SunMine has 4,032 solar-cell modules, mounted on 96 solar trackers that follow the sun’s movement, maximizing solar exposure. It is BC’s largest solar project, Canada’s largest solar tracking facility, and the first solar project in BC to sell power to the BC Hydro grid.

The project is supported by Teck, which has provides land and site infrastructure, as well as a $2 million contribution. SunMine is located on Teck’s former Sullivan Mine Concentrator site, which has been fully reclaimed. BC’s Innovative Clean Energy (ICE) Fund program has provided $1 million for SunMine through the EcoSmart Foundation, a Vancouver-based non-profit foundation promoting economically and ecologically smart projects between public and private sectors.

“Innovative, private clean energy projects have helped power BC since the 1980s and are a cornerstone of BC’s energy policy,” says BC Energy and Mines Minister Bill Bennett. “The Sun Mine project has the potential to spur interest in development of other solar projects, bringing more jobs and economic benefits to communities across BC.”

Find out more: www.sunmine.ca.

 

 

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 12

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 12

    Section 12 is a general section of the Code and applies to all low voltage and extra low voltage wiring installations except for… Read More…

  • Building a Greener Future – BuildForce Canada Report

    Building a Greener Future – BuildForce Canada Report

    May 3, 2024 Retrofitting Canada’s residential, commercial, and institutional building stock to incorporate sustainable fuel sources, technologies, and materials could require as many as 57,000 additional construction workers and generate more than $81 billion in new construction investments by 2032. A new report prepared by BuildForce Canada, Building a Greener Future: Estimating the impact on construction… Read More…

  • HELUKABEL White Paper: “PUR or PVC”

    HELUKABEL White Paper: “PUR or PVC”

    May 3, 2024 The jacket material is a key factor when looking for the right cables and wires. The outer jacket performs a multitude of functions that ensure the durability, safety and performance of the cable or wire. Users must often choose between polyurethane (PUR) and polyvinyl chloride (PVC). In our new white paper “PUR… Read More…

  • Electric Avenue Annouces Improved Cold Temperature Rating of -40 Degrees

    Electric Avenue Annouces Improved Cold Temperature Rating of -40 Degrees

    April 26, 2024 Electric Avenue, a leading innovator in electric vehicle (EV) charging solutions, is thrilled to announce significant improvements to the cold temperature performance of its flagship products, the Watti Pro Lite and Watti Home Gen2. After comprehensive environmental testing, both chargers now boast an impressive operational rating of -40 degrees Celsius, surpassing the… Read More…


Changing Scene