ESA Guidance for Homeowners on How to Prepare for Inspections

EIN 24 ESA 400

October 15, 2021

Based on the latest public health guidelines, ESA is using a wide range of options at the Inspector’s discretion in order to inspect electrical installations in occupied dwellings. If an onsite inspection is determined to be required, please review the following guidelines on how to prepare:

Prior to the Inspector’s arrival, please identify to the Inspector if anyone on the premises is unwell, displaying COVID-19 symptoms, has been in close contact with anyone that has tested positive for COVID-19, has recently travelled outside of the country, or is required to quarantine according to federal requirements.

For both the health and safety of Inspectors and the public/occupants, the interior of occupied residential dwellings should be vacated while the inspection is being completed.

If vacating is not possible, occupants must be wearing a cloth mask as a minimum.

Inspector duties must be performed at least 2 metres or 6 feet away from other people.

Please open doors, turn on lights, remove any obstructions and provide access to areas where electrical work has been done prior to the Inspector’s arrival.

Should the Inspector be required to wear Personal Protective Equipment (i.e. Mask, gloves, etc.), after the inspection they will place their used PPE in a disposable bag. A place to dispose of the bag must be provided.

Please note that the Inspector is taking additional precautions, including disinfecting tools and practicing proper hand hygiene prior to your visit.

At ESA we are closely monitoring the COVID19 situation and are putting measures in place in line with Public Health Canada to protect the public and our inspectors. To learn more on how ESA is handling the COVID19 pandemic, please visit https://esasafe.com/newsroom-2021/covid-19/

Source

Related Articles


Latest Articles


Changing Scene

  • Delta Transformers Appoints New Representative in Ontario

    Delta Transformers Appoints New Representative in Ontario

    October 8, 2026 Delta Transformers, a Canadian manufacturer of dry-type transformers, is pleased to announce the appointment of Spectrum Power Systems as their new representative in Ontario, Canada, effective October 1st, 2026. For over 27 years Spectrum Power Systems has been representing leading electrical manufacturers throughout Ontario. The company has a strong presence in the… Read More…

  • Former Electrical Contractor Principal Arrested Following ESA Referral to Police

    Former Electrical Contractor Principal Arrested Following ESA Referral to Police

    October 8, 2026 Arrest follows ESA licence revocation, $70,000 in previous fines and new electrical safety charges   Peel Regional Police recently arrested Rahyl Hassan, principal of former Licensed Electrical Contractor, Strak Holdings Inc., following an investigation in which the Electrical Safety Authority (ESA) cooperated with police.  ESA referred concerns about potential criminal activity to Peel… Read More…

  • Federal Government Announces $2 billion Investment to Deliver One Million Home Retrofits Across Canada

    Federal Government Announces $2 billion Investment to Deliver One Million Home Retrofits Across Canada

    October 8, 2026 The federal government has announced a $2 billion investment to deliver one million home retrofits across Canada. These energy-efficient retrofits will lower heating costs for Canadians and reduce emissions. First, they are launching a new National Heat Pump Rebate to help up to 820,000 households make the switch to more efficient electric heat pumps: Heat pumps… Read More…

  • FCM and the Government of Canada Announce $66.3 M in 162 Energy Efficient Housing Projects

    FCM and the Government of Canada Announce $66.3 M in 162 Energy Efficient Housing Projects

    September 8, 2026 Funding supports homeowners and affordable housing providers in reducing energy costs and improving quality of life, while adding jobs to communities coast-to-coast  The Government of Canada and the Federation of Canadian Municipalities (FCM) today announced that $66.3 million in funding has been approved for 162 energy efficiency projects across the country. The… Read More…