How the Canadian Electrical Code, Part I Is Amended

Code Amended

William Burr

I am often asked how new rules get in the Code and how one could go about amending a code rule. All of these procedures are outlined in Appendix C of the Canadian Electrical Code, Part I. However, being written as a standard it is sometimes a struggle to follow.I trust this article easily explains the process. 

To start this discussion we need to understand the structure of the Technical Committee of the Canadian Electrical Code, Part I (TC), which is responsible for the development of the Code.

The TC has a maximum of 41 members, consisting of

• chair
• vice-chair

• executive committee (EC) elected by the members
• non-voting project manager appointed by the Canadian Standards Association (CSA)
• sub-committee (SC) for each section of the Code
• Regulatory Authority Committee (RAC).

The chair of the TC, with the advice of the EC appoints a chair for each section SC from among the TC members, and the SC chairs appoint the members of their SC. Anyone representing the following major interests can apply to be a member of a sub-committee: 

• inspection authorities
• manufacturers
• employers
• employees
• consultants
• utilities
• testing laboratories
• underwriters
• fire marshals
• primary and secondary industries
• respective code-making panels of the National Electrical Code
• users

The 41 regular members of the TC are drawn from three main interest groups in conjunction with the following balanced matrix.

Technical Committee Composition

Technical Committee

• The regulatory authorities represent the various provincial, territorial and municipal electrical inspection authorities across the country.
• Owner/operator/producers represent electrical manufacturers, electrical installation designers and installers and electrical installation user groups.
• The general interest category is drawn from fire chiefs, electric utilities, other codes and standards committees, fire insurers, labour, issuers of building codes, and educators groups.

All these members are nominated by the organization they represent and are approved for membership by the executive committee. I will discuss the function of the RAC later in this article.

The TC meets once a year.Additional meetings may be called if warranted. However, much of the business of the TC and Section SCs takes place between meetings through correspondence and electronic media.

Anyone can propose a new Code rule or an amendment to the project manager at CSA using the form contained inAppendix C of the Code.
The proposal must be specifically worded and must:

• improve safety
• address new technology
• correlate with product standard requirements
• correlate with other relevant standards, or
• clarify existing wording

Supporting information for the proposal must also be supplied. 

The PM assigns a subject number to the proposal and sends it to the relevant section SC chair and alsosubmits it for public review on the CSA website. The SC chair distributes the proposal to the subcommittee members with the chair’s comments for discussion. The sub-committee deliberates the proposal, along with any public review comments, and may recommend it, amend it, keeping the original intent, or reject the proposal. The SC chair then provides a report with the recommendations of the sub-committee to the TC for letter ballot.

If the letter ballot is affirmed by more than 50% of the total voting membership with no negative votes, it is approved and, except for a recommendation of rejection, will be published in the next version of the Code. In the case of negative votes, the chair of the SC in consideration of the negative votes has a number of courses of action:

• resolve the negative by editorial changes or further explanation
• rule the negative vote non-germane if it is not accompanied by supporting comments, if it doesn’t deal with the intent, the procedure, technical content or conflict with another rule or standard, of the proposal
• the negative vote and supporting reasons are not considered to be relevant to the original proposal
• the negative vote can be ruled non-persuasive if the reasons have previously been discussed by the subcommittee as outlined in the subcommittee report.

If there are any negative votes that cannot be resolved by the SC chair, then the subject is put on the agenda of the next meeting of the TC.

When a letter ballot is on the agenda of a meeting, the subject is introduced by the chair of the SC who explains the deliberations of the SC and the negatives that couldn’t be resolved. An open discussion takes place followed by a vote. If the subject is affirmed by a two-thirds majority, with no Regulatory Negative, then the subject is approved.

Whoa! What’s a Regulatory Negative? Well, I mentioned earlier that I would discuss the Regulatory Authority Committee later in this article.

The RAC comprises the regulatory authority representatives on the TC and is essentially the guardian of the legal framework of the Code. Since the Code is a legally adopted document by provincial, territorial, and municipal governments, the regulatory authorities need to make sure that the wording of any rules are suitable for enforcement.If any RAC member feels that a proposal for amendment to the Code is not enforceable in their jurisdiction, they may vote a Regulatory Negative. This member must declare that their negative vote is a Regulatory Negative as opposed to a negative for any other technical reason.The subject is then referred to the Regulatory Authority Committee, which must develop a revised amendment carrying the same intent, in terms of safety and technical requirements, and submit it to the Section SC for further consideration.It must be noted that this is not a veto, but an alternative wording with the same intent as the original proposal.

Note: information for this article has been sourced from The Canadian Electrical Code, Part I, published by CSA Group.


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • Human-Centric Lighting: Designing Spaces Around Health and Well-Being

    Human-Centric Lighting: Designing Spaces Around Health and Well-Being

    November 16, 2026 Lighting has always been essential to how we see and use a space. But today, its role is moving beyond visibility and aesthetics. As workplaces, healthcare facilities, hospitality environments, educational institutions and residential spaces become more focused on people, lighting is being designed to support comfort, productivity and overall well-being. This shift… Read More…

  • Why Fiberglass Conduit Belongs in the Data Center Specification

    Why Fiberglass Conduit Belongs in the Data Center Specification

    November 16, 2026 By Scott Patchan AI is accelerating an already significant expansion in data center infrastructure. McKinsey estimates that global demand for data center capacity could increase 19% to 22% annually from 2023 to 2030. Next-generation workloads will demand greater power requirements and advanced cooling solutions. These trends were the focus of a recent… Read More…

  • CAGE CLAMP®: The Connection Technology that Changed Industrial Wiring

    CAGE CLAMP®: The Connection Technology that Changed Industrial Wiring

    November 13, 2026 Nearly 50 years after its introduction, WAGO’s universal spring-pressure technology continues to influence electrical connection reliability, installation efficiency, and equipment design. A single loose electrical connection can stop a production machine, disable a control system, or send a technician searching through hundreds of terminations for the source of a fault. In equipment… Read More…

  • Revit Files – What Are They & Why Do They Matter?

    Revit Files – What Are They & Why Do They Matter?

    November 13, 2026 By Liteline What Is a Revit File? A Revit file is a Building Information Modeling (BIM) object. It’s a digital version of a product that carries shape and data. Unlike standard, static 3D models, a Revit file is parametric. This means it’s packed with information like the product’s performance and specification data.… Read More…


Changing Scene

  • Intermatic Acquires Sunrise Technologies, Strengthens Infrastructure Lighting Controls Portfolio

    Intermatic Acquires Sunrise Technologies, Strengthens Infrastructure Lighting Controls Portfolio

    November 16, 2026 Intermatic has announced its acquisition of Sunrise Technologies, LLC (Sun-Tech), a premier provider of outdoor lighting-control and power-connectivity products for utility, municipal, commercial & industrial, and OEM applications. The investment augments the Intermatic catalog with complementary infrastructure lighting control solutions and primes the organization for growth within the industry. “For more than… Read More…

  • Paula Irwin of Black & McDonald Receives 2026 CAWIC DEI Award

    Paula Irwin of Black & McDonald Receives 2026 CAWIC DEI Award

    November 13, 2026 Black & McDonald is proud to celebrate Paula Irwin, recipient of the 2026 Diversity, Equity and Inclusion (DEI) Award presented by the Canadian Association of Women in Construction (CAWIC). The award recognizes individuals who are making a meaningful contribution to advancing diversity, equity and inclusion within the construction industry. In announcing the… Read More…

  • Electrical Safety Authority and London Hydro Partner to Tackle Copper Theft and Protect Ontario Communities

    Electrical Safety Authority and London Hydro Partner to Tackle Copper Theft and Protect Ontario Communities

    November 13, 2026 The Electrical Safety Authority (ESA) and London Hydro have partnered to launch Copper Theft Toolkit: Understanding Safety Risks and Community Impacts, a free communications toolkit developed collaboratively to help communities recognize the dangers, raise awareness and safely report suspicious activity. Copper theft is an ongoing safety concern that puts Ontarians at risk,… Read More…

  • Supporting Enoch Cree Nation’s Long-Term Housing Strategy and Community Growth

    Supporting Enoch Cree Nation’s Long-Term Housing Strategy and Community Growth

    November 9, 2026 The Canada Infrastructure Bank (CIB) has reached financial close on a $30 million loan towards enabling infrastructure for critical housing development on ECN reserve lands, near Edmonton, Alberta. The project will address exponential housing pressures within the community, allowing ECN members to return to community while supporting long-term growth on reserve.  The… Read More…