Arc Flash Incident Involving a Maintenance Switch

Maintenance Switch

 

Feb 12, 2016

This case study article examines the plans and processes reviewed and considered, the strategy deployed to manage/reduce arc flash hazards, and then lessons learned in the implementation of new systems to improve electrical workplace safety. The setting: a chemical processing facility with a robust electrical workplace safety process. The site experienced an actual arc flash event while energized work was being performed.

Photo courtesy: www.utilityproducts.com

The facility was planning energized work for an existing 480 V low voltage switchgear assembly that was an existing piece of equipment in the plant. During a process upgrade in the facility, an energized work permit was issued to remove three abandoned load conductors from an existing 480 V low voltage switchgear assembly cable compartment.

The work permit was very detailed and included tools planned for use in the project and required PPE for workers performing the task based on the incident energy defined by a recently completed arc flash hazard assessment. The defined task for the work order required the site contractor to use a nylon rope, which was typical with this type of project, disconnecting the de-energized cables and working to raise them from the top cable compartment. Figure 10 showsa layout of the low voltage assembly involved in the work.

The de-energized cables were to be removed from Cubicle 5, with still energized conductors existing in Cubical 4 at the bottom of the cable wireway. The rope used was not able to grab the conductors and would slip off of the cable, so the electrical contractor elected to employ a “come along” to assist in the removal, as the come along could apply more force. The first conductor was successfully removed with this new tool. Upon removing the second conductor, a small arc flash was observed in the lower compartment. Simultaneously, the lights to the plant went out.The contractor stopped work and waited for plant electricians to arrive, not knowing what had just occurred.

The event caused the entire plant to shut down, stopping work on the project until an analysis could be completed. It was determined that the chain of the come along had drifted below where the work was being performed and into energized Cubicle 4. Fortunately, the damage to the wall of the switchgear and come along tool was minimal, which is shown in Figure 11.

Post event analysis proved that the chain of the come along had drifted below where the work was being performed and into an energized cubicle. The chain touched an energized terminal and arced to ground, touching both phase conductor and cabinet ground metal below the non-energized cubicle where the electrician was working. After reviewing minimal damage and completing the project while de-energized, the plant switchgear was cleaned and re-energized. Fortunately, total downtime for the plant due to this event was minimal. No loss of equipment or injury to any employee occurred as a result of this event.

 

Eaton Arc Flash Safety

 

Low voltage assembly involved in planned energized work. The planned task included removing cables from de-energized Cubicle 5 while Cubical 4 in an adjacent section was still energized.

The important take-away here is that the arc flash study was completed before energized work was performed. The upstreamlow voltage power circuit breaker with a special maintenance switch setting discussed previously employed technology to clear the fault faster than the microprocessor instantaneous setting of the circuit breaker trip unit.

Calculations were previously performed that quantified a reduction in incident energy from 17.7 cal/cm2 to2.9 cal/cm2 using the special maintenance setting. Both workersand equipment were saved as a result of a total clearing time at 40 milliseconds as defined by the manufacturer’s published trip curves[8].

Lessons learned

This case study unequivocally proves that planning for the unplanned event can save lives. Some of the key lessons learned here:
• mistakes will happen on even the best planned projects. A change in tools is what led to this arc flash event
• proper planning and leveraging of all accessible resources prevented what could have been a catastrophic event
• leveraging technology can often deliver a reduction in the available energy. Using more sensitive settings can save both people and equipment should an arc flash event occur

Eaton Come Along

At left, a “come along” tool used for energized work and at right, damage to panel after phase to ground arc flash event with an upstream device with maintenance setting capabilities.

This case study is one of four published online by Eaton and has been lightly edited by EIN. See all case studies: http://www.eaton.com/ecm/groups/public/@pub/@eaton/@corp/documents/content/pct_1562591.pdf.

 

Related Articles


Latest Articles


Changing Scene

  • 2024 Call for Nominations CAF-FCA Board of Directors

    2024 Call for Nominations CAF-FCA Board of Directors

    June 28, 2024 The Canadian Apprenticeship Forum is now accepting nominations for its Board of Directors. This is a great opportunity for those who want to be involved in setting the organization’s strategic direction and overseeing its work on behalf of Canada’s apprenticeship community. Review the CAF-FCA Board Member Job Description. For the 2024/2025-year CAF-FCA… Read More…

  • IDEAL Introduces Sneak Peek Sweepstakes

    IDEAL Introduces Sneak Peek Sweepstakes

    June 28, 2024 IDEAL Electrical has a new opportunity for electricians to win a trip to Chicago with its “Road to Sneak Peek Sweepstakes.” The sweepstakes is open from June 17-July 15 and electricians in the United States and Canada can enter to win by filling out a form to join the IDEAL Electrical loyalty program, Champions Club™…. Read More…

  • Agence Ricard Announces New Partnership with Hydel

    Agence Ricard Announces New Partnership with Hydel

    June 28, 2024 Agence Ricard has announced a new partnership with Hydel, a recognized provider in the manufacture of high-quality electrical products. This strategic partnership will allow Agence Ricard to expand its product range by adding Hydel’s meter sockets and other innovative products. Hydel is known for its reliable and sustainable solutions that meet the evolving… Read More…

  • Glen Dimplex Americas Announces Direct Distribution of Convectair and Dimplex Products in Canada

    Glen Dimplex Americas Announces Direct Distribution of Convectair and Dimplex Products in Canada

    June 28, 2024 Glen Dimplex Americas is pleased to announce that, starting September 16, 2024, it will take over the direct sales and distribution of all Convectair and Dimplex products in the Canadian electrical distribution market. This change follows Glen Dimplex Americas decision to end its distribution agreement with Ouellet Canada Inc., which has been… Read More…