Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 32

April 7, 2025

by William (Bill) Burr[i]

Section 32 – Fire Alarm Systems, Fire Pumps, and Carbon Monoxide Alarms.

The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the Code.

32

Section 32, as outlined in rule 32 -000 Scope, is a supplementary or amendatory section of the code and provides additional and specific requirements for the location, installation, wiring, and protection, of fire alarm systems, fire pumps and smoke and carbon monoxide alarms required by the National Building Code of Canada as referenced in Appendix G. For further information, reference should also be made to Canadian Standard CAN/ULC – S524 Standard for the Installation of Fire Alarm Systems published by ULC Canada. Appendix B contains important additional helpful notes, and the CEC Handbook also contains helpful information.

Rule 32-100 specifies the requirements for conductors in fire alarm systems which include copper material, ampacity, use of optical fiber cables, use of stranded conductors, insulation rated at 300 volts, determining wire size for raceways or integral assemblies, and selection in accordance with rules 4-008(1) or 4-020(1).

Rule 32-102 outlines wiring methods for installation of conductors either in metal, non-metallic raceway, or having metal armour or sheath.  Where installed in buildings of combustible construction conductors may be installed in accordance with Section 12.  Conductors need to be installed independent of any other wiring except for point of supply, signal, ancillary device or communication circuits and must be insulated for the highest voltage rated conductor. Communication circuits must conform to Section 60.

Rule 32-104 requires that all exposed non-current-carrying parts of electrical equipment be bonded to ground in accordance with Section 10.  In addition, non-metallic fire alarm wiring systems must incorporate a bonding conductor.

Rule 32-106 denotes that for electrical supervision, each circuit conductor terminal shall be independentlyterminated. 

Rule 32-108 specifies that the fire alarm system power supply, except for included additional control units or transponders, be on a separate circuit and that the overcurrent devices and disconnecting means be permanently identified as a fire alarm system, be coloured red, and lockable in the on position.

Rule 32-110 provides installation requirements for permanently connected smoke alarms and carbon monoxide alarms in dwelling unitsthat are required by the National Building Code of Canada (see Appendix G).  The rule requires that smoke and carbon monoxide alarms be supplied from a circuit that will provide an indication, if shut off, for instance with a lighting or mixed lighting and receptacle circuit with no disconnect, including a GFCI or AFCI device, between the alarms and the branch circuit overcurrent device.  Interconnection of alarms may use a class 2 power supply in accordance with Rules 12-506 to 12-524.

Rule 32-200 requires that conductors for the supply of a fire pump supplied from the emergency power source have an ampacity not less than 125% of the full load current rating of the motor or sum of multiple motors and auxiliary motors and be protected from fire exposure to provide continuing operation during a fire as required by the National Building Code of Canada (see Appendix G)

Rule 32-202 outlines the requirements for wiring methods of fire pumps to be installed in metal raceways, in armour or metal sheathed cable, selected in accordance with Rule 4-888(1), in rigid non-metallic conduit imbedded in concrete, or electrical non-metallic tubing imbedded in concrete.

Rule 32-204 provides that a separate service box for a fire pump and equipment may be installed in conformance with Rule 32-206 below and, notwithstanding Rule 6-102(2), may be located remote from other service boxes.

Rule 32-206 requires that no disconnecting means, overcurrent protection or device capable of interrupting the fire pump circuit may be placed between the service box and the fire pump transfer switch or controller, except a circuit breaker that is permanently labeled identifying it as a fire pump disconnect. In addition, the circuit breaker must be lockable in the closed position and may be in the separate service box as in Rule 32-204 above. In the case where this circuit breaker is installed in an emergency power supply circuit between the emergency power source and the fire pump transfer switch the rating of the circuit breaker shall be as per Rule 28-200. Where it is installed in a normal supply circuit the rating should be not less than the overcurrent protection of the fire pump controller.

Rule 32-208 requires that where an on-site electrical transfer switch is used to provide emergency power supply to a fire pump, it must be provided solely for the fire pump, located in a barriered or separate compartment or enclosure, permanently labeled as the fire pump power transfer switch, and approved for fire pump service. Where more than one fire pump is provided, a transfer switch is required for each fire pump.

Rule 32-208 provides that overload and overheating protection for branch circuit, control, or equipment conductors shall not be required but shall be protected by the motor branch circuit overcurrent device.

Rule 32-210 specifies that ground fault protection shall not be installed in a fire pump circuit.

In the next installment, we will be discussing Section 34 – Signs and Outline Lighting.


[i] Source: CSA C22.1:24, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit Store – CSA Group or call 1-800-463-6727. With the permission of CSA Group, the material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit Store – CSA Group or call 1-800-463-6727.

[i] William (Bill) Burr is an associate member of the Canadian Electrical Code, Part 1, Technical Committee and formerly Chair of the Canadian Advisory Council on Electrical Safety (CACES), Chief Electrical and Elevator Inspector for the Province of BC & the Northwest Territories, Director of Electrical and Gas Standards Development and Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com..

Related Articles


Latest Articles

  • Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    August 4, 2026 Prysmian’s proposed US$3.8-billion acquisition of Atkore is primarily a move to deepen the Italian cable manufacturer’s U.S. electrical-products presence, but it also carries a meaningful Canadian angle for the electrical channel. If the transaction closes as expected, Prysmian would add Atkore’s FRE Composites manufacturing operation in Saint-André-d’Argenteuil, Que., near Montréal, to its… Read More…

  • Technical Safety BC Top 5 Safety Risks in 2025

    Technical Safety BC Top 5 Safety Risks in 2025

    July 31, 2026 Each year, Technical Safety BC measures the data they receive through incident and hazard reports to analyze and rank the top safety risks encountered across the province. These risks were identified by collecting, assessing, and analyzing incident investigation data. The key metrics they look at when ranking the top five safety risks… Read More…

  • World Youth Day Spotlight: Supporting Habitat for Humanity Canada’s Youth Skills Building Program

    World Youth Day Spotlight: Supporting Habitat for Humanity Canada’s Youth Skills Building Program

    July 31, 2026 By Electro Federation Canada This World Youth Day, we are proud to recognize the positive impact EFC members continue to make through their support of Habitat Canada’s Youth Skills Building Program. Investing in the Next Generation of Talent Canada is experiencing a significant labour shortage that is delaying homebuilding, driving up costs,… Read More…

  • Current Carrying Capacity: How to Determine the Right Conductor Cross-Section

    Current Carrying Capacity: How to Determine the Right Conductor Cross-Section

    July 31, 2026 Current carrying capacity means the maximum current that a cable can transmit over sustained periods without overheating. Exceeding the permitted current capacity can damage the cable’s insulation and, in the worst case, result in fire. What determines the current carrying capacity? Different parameters influence how much electricity a cable can safely transmit.… Read More…


Changing Scene

  • Nexans Canada Celebrates 60 Years of Electrifying Canada from Fergus, Ontario

    Nexans Canada Celebrates 60 Years of Electrifying Canada from Fergus, Ontario

    Canada’s largest wire and cable manufacturer marks six decades of continuous manufacturing in Centre Wellington… Read More…

  • Mac’s II Agencies Expands Industrial Portfolio with Five Hubbell Brands

    Mac’s II Agencies Expands Industrial Portfolio with Five Hubbell Brands

    August 5, 2026 Mac’s II Agencies is expanding its electrical portfolio across British Columbia and Yukon with five leading brands from Hubbell, enhancing our ability to support hazardous location and industrial project business with reliable, field proven solutions for demanding environments. From explosion proof distribution equipment and industrial lighting to the connectors, glands, and hardware that tie… Read More…

  • Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    Prysmian’s $3.8B Atkore Deal would add Quebec Fiberglass-Conduit Plant to Canadian Footprint

    August 4, 2026 Prysmian’s proposed US$3.8-billion acquisition of Atkore is primarily a move to deepen the Italian cable manufacturer’s U.S. electrical-products presence, but it also carries a meaningful Canadian angle for the electrical channel. If the transaction closes as expected, Prysmian would add Atkore’s FRE Composites manufacturing operation in Saint-André-d’Argenteuil, Que., near Montréal, to its… Read More…

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…