Guide to the Canadian Electrical Code, Part 1[i], 26th Edition – A Road Map: Section 32

April 7, 2025

by William (Bill) Burr[i]

Section 32 – Fire Alarm Systems, Fire Pumps, and Carbon Monoxide Alarms.

The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the Code.

32

Section 32, as outlined in rule 32 -000 Scope, is a supplementary or amendatory section of the code and provides additional and specific requirements for the location, installation, wiring, and protection, of fire alarm systems, fire pumps and smoke and carbon monoxide alarms required by the National Building Code of Canada as referenced in Appendix G. For further information, reference should also be made to Canadian Standard CAN/ULC – S524 Standard for the Installation of Fire Alarm Systems published by ULC Canada. Appendix B contains important additional helpful notes, and the CEC Handbook also contains helpful information.

Rule 32-100 specifies the requirements for conductors in fire alarm systems which include copper material, ampacity, use of optical fiber cables, use of stranded conductors, insulation rated at 300 volts, determining wire size for raceways or integral assemblies, and selection in accordance with rules 4-008(1) or 4-020(1).

Rule 32-102 outlines wiring methods for installation of conductors either in metal, non-metallic raceway, or having metal armour or sheath.  Where installed in buildings of combustible construction conductors may be installed in accordance with Section 12.  Conductors need to be installed independent of any other wiring except for point of supply, signal, ancillary device or communication circuits and must be insulated for the highest voltage rated conductor. Communication circuits must conform to Section 60.

Rule 32-104 requires that all exposed non-current-carrying parts of electrical equipment be bonded to ground in accordance with Section 10.  In addition, non-metallic fire alarm wiring systems must incorporate a bonding conductor.

Rule 32-106 denotes that for electrical supervision, each circuit conductor terminal shall be independentlyterminated. 

Rule 32-108 specifies that the fire alarm system power supply, except for included additional control units or transponders, be on a separate circuit and that the overcurrent devices and disconnecting means be permanently identified as a fire alarm system, be coloured red, and lockable in the on position.

Rule 32-110 provides installation requirements for permanently connected smoke alarms and carbon monoxide alarms in dwelling unitsthat are required by the National Building Code of Canada (see Appendix G).  The rule requires that smoke and carbon monoxide alarms be supplied from a circuit that will provide an indication, if shut off, for instance with a lighting or mixed lighting and receptacle circuit with no disconnect, including a GFCI or AFCI device, between the alarms and the branch circuit overcurrent device.  Interconnection of alarms may use a class 2 power supply in accordance with Rules 12-506 to 12-524.

Rule 32-200 requires that conductors for the supply of a fire pump supplied from the emergency power source have an ampacity not less than 125% of the full load current rating of the motor or sum of multiple motors and auxiliary motors and be protected from fire exposure to provide continuing operation during a fire as required by the National Building Code of Canada (see Appendix G)

Rule 32-202 outlines the requirements for wiring methods of fire pumps to be installed in metal raceways, in armour or metal sheathed cable, selected in accordance with Rule 4-888(1), in rigid non-metallic conduit imbedded in concrete, or electrical non-metallic tubing imbedded in concrete.

Rule 32-204 provides that a separate service box for a fire pump and equipment may be installed in conformance with Rule 32-206 below and, notwithstanding Rule 6-102(2), may be located remote from other service boxes.

Rule 32-206 requires that no disconnecting means, overcurrent protection or device capable of interrupting the fire pump circuit may be placed between the service box and the fire pump transfer switch or controller, except a circuit breaker that is permanently labeled identifying it as a fire pump disconnect. In addition, the circuit breaker must be lockable in the closed position and may be in the separate service box as in Rule 32-204 above. In the case where this circuit breaker is installed in an emergency power supply circuit between the emergency power source and the fire pump transfer switch the rating of the circuit breaker shall be as per Rule 28-200. Where it is installed in a normal supply circuit the rating should be not less than the overcurrent protection of the fire pump controller.

Rule 32-208 requires that where an on-site electrical transfer switch is used to provide emergency power supply to a fire pump, it must be provided solely for the fire pump, located in a barriered or separate compartment or enclosure, permanently labeled as the fire pump power transfer switch, and approved for fire pump service. Where more than one fire pump is provided, a transfer switch is required for each fire pump.

Rule 32-208 provides that overload and overheating protection for branch circuit, control, or equipment conductors shall not be required but shall be protected by the motor branch circuit overcurrent device.

Rule 32-210 specifies that ground fault protection shall not be installed in a fire pump circuit.

In the next installment, we will be discussing Section 34 – Signs and Outline Lighting.


[i] Source: CSA C22.1:24, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit Store – CSA Group or call 1-800-463-6727. With the permission of CSA Group, the material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit Store – CSA Group or call 1-800-463-6727.

[i] William (Bill) Burr is an associate member of the Canadian Electrical Code, Part 1, Technical Committee and formerly Chair of the Canadian Advisory Council on Electrical Safety (CACES), Chief Electrical and Elevator Inspector for the Province of BC & the Northwest Territories, Director of Electrical and Gas Standards Development and Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com..

Related Articles


Latest Articles

  • Houle Highlights Completion of Freedom Mobile Arch in Vancouver

    Houle Highlights Completion of Freedom Mobile Arch in Vancouver

    June 22, 2026  The Freedom Mobile Arch at the PNE is complete and already welcoming its first audiences. Debuting just in time for the world’s biggest soccer tournaments, this stunning 10,000-seat, state-of-the-art amphitheatre is set to become one of Vancouver’s premier performance hubs. The venue is set to host live watch parties, a jam-packed summer… Read More…

  • The ECABC Jack Funk Scholarship

    The ECABC Jack Funk Scholarship

    The ECABC Jack Funk Scholarship honours the memory of Jack Funk, a long-time electrical contractor and leader in British Columbia. Read More…

  • NSAA Apprenticeship Management System (AMS) is Now Available

    NSAA Apprenticeship Management System (AMS) is Now Available

    June 19, 2026 NSAA has now launched the Apprenticeship Management System (AMS) to provide a faster, easier, and more transparent way for apprentices and employers to manage apprenticeship activity. For Apprentices, Apprenticeship Management System will allow you to:  For Employers, with Apprenticeship Management System, you will be able to:  For Tradespersons Your launch of Apprenticeship… Read More…

  • IP Ratings in Lighting: What They Actually Mean in the Field

    IP Ratings in Lighting: What They Actually Mean in the Field

    By CSC LED IP ratings are among the most frequently referenced specifications in lighting, yet they are often misunderstood or oversimplified. While they may appear to be just another number on a specification sheet, IP ratings play an important role in determining where a fixture can be installed and how it will perform over time.… Read More…


Changing Scene

  • Government of Canada marks Royal Assent of the Build Canada Homes Act

    Government of Canada marks Royal Assent of the Build Canada Homes Act

    June 22, 2026 The Government of Canada has announced that Bill C‑20, the Build Canada Homes Act, has received Royal Assent, marking an important milestone in the Government’s plan to build more homes, faster and help make housing more affordable for Canadians. The Build Canada Homes Act sets out the legislative framework to establish Build Canada Homes as… Read More…

  • ECS Electrical Cable Supply Welcomes New Branch Manager in Montreal

    ECS Electrical Cable Supply Welcomes New Branch Manager in Montreal

    June 22, 2026 Please join ECS in welcoming Jonathan Louis as their new Branch Manager of ECS Montreal. “Jonathan brings more than 23 years of experience in sales and business development, including 13 years in sales leadership and 8 years in general management. Throughout his career, he has successfully driven revenue growth, built strong partner… Read More…

  • ECABC Welcomes Rob Tate into Hall of Fame

    ECABC Welcomes Rob Tate into Hall of Fame

    June 22, 2026 ECABC was honoured to induct Rob Tate, President of Canwest Agency Ltd, into its Hall of Fame. Being inducted to the ECABC’s Hall of Fame recognizes an individual’s lifetime of dedication and service to the electrical industry and Association. From building his career on hard work and strong values to leading with… Read More…

  • ECABC Welcomes Bill Strain into Hall of Fame

    ECABC Welcomes Bill Strain into Hall of Fame

    June 22, 2026 ECABC was honoured to welcome Bill Strain, Owner & President of Villa Electric (1980) Ltd., into their Hall of Fame. Being inducted to the ECABC’s Hall of Fame is the highest honour the Association can bestow upon a member. From humble beginnings as an apprentice electrician to a respected industry leader and… Read More…