Investment in New Housing Up in April

New Home Construction

Investment in new housing construction rose 2.3% to $3.9 billion in April compared with the same month in 2014. Higher investment in apartment and apartment-condominium building construction was responsible for most of the national advance, rising 7.9% to $1.3 billion.Increased spending in row house construction (+5.9% to $383 million) and semi-detached dwelling construction (+3.2% to $229 million) also contributed to the advance.Single-family dwellings were the lone component to register a decline in construction spending, down 1.8% to $2.0 billion.

Increases on a year-over-year basis were registered in four provinces, led by British Columbia, followed by Ontario, Alberta and Nova Scotia. In British Columbia, total investment in new residential construction rose 18.2% to $739 million. In Ontario, investment increased 7.0% to $1.3 billion, while in Alberta, spending was up 8.3% to $1.0 billion. In Nova Scotia, spending grew 9.6% to $47 million.

Source: Statistics Canada, http://www.statcan.gc.ca/daily-quotidien/150622/dq150622b-eng.htm?cmp=mstatcan.

 

Related Articles


Latest Articles

  • Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    By Luc Rodier, Chair of the Board of Electro-Federation Canada (EFC) The 2025 EFC Conference in Niagara was a landmark occasion—marking 30 years of innovation, collaboration, and collective progress in the Canadian electrical industry. Set against the symbolic backdrop of the Canadian-U.S. border, this year’s theme, Electrifying Connections, couldn’t have been more fitting. As President and… Read More…

  • Industrial Wiring Devices: A Brief Intro and How to Choose Them

    Industrial Wiring Devices: A Brief Intro and How to Choose Them

    June 9, 2025 Introduction: With the multitude of options on the market, it can be difficult to decide whether you need a pin and sleeve wiring device or a plug and connector in your industrial plant or facility. You might find your head swirling with thoughts about which option is best. Or you may not… Read More…

  • Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    June 9, 2025 By Electro-Federation Canada On June 3 and 4, a high-level delegation from Canada’s electrical and automation sector travelled to Montreal and Quebec City for a series of strategic meetings with Quebec government officials and key stakeholders. Organized by Electro-Federation Canada (EFC), this mission underscores the critical role the industry plays in advancing… Read More…

  • Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    June 9, 2025 By Electro-Federation Canada This year’s Annual Industry Conference, held against the breathtaking backdrop of Niagara Falls, Ontario, was a landmark event with more than 710 Electro-Federation Canada community members. More than just a celebration of our shared history, it was a launchpad for new ideas, future-based dialogue, and deeper connections.   The energy and… Read More…


Changing Scene