A Road Map to the CE Code, Part I – Installment 2

Roadmap

 

Bill Burr

The CE Code is a comprehensive document. Sometimes it can seem quite daunting to find quickly the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook , but will hopefully provide some help in navigating the code.

Section 2 – General Rules

Administrative

In Section 2 we encounter the first numbered rules in the code.The rules from 2-000 to 2-032 are categorized as administrative rules. These rules establish the authority of the inspection department with respect to the code and outline the code’soperative functions, such as permits, applications, paying fees, posting permits, notification for inspection, submitting plans and specifications, current-permits, reinspection, renovation, use of approved equipment, powers of rejection, availability of work for inspection, deviation or postponement, and damage and interference.These are the rules most likely to be amended by provincial or territorial authorities having jurisdictionbecause inspection departments may require different administrative procedures than those set out in the code.

Because these administrative rules are not technical in nature, amendments to them do not affect the consensus safety principles of the code’s technical rules.Also note that, as mentioned in the preface, Rule 2-002 establishes that where there are code sections covering particular installations, those rules do not cover all the rules that apply for that installation, but supplement or amend the rules in the general sections covering all installations.

Technical General

Next we move to the Technical part of the General Rules.These rules cover general safety aspects required of all electrical equipment and installations.The main topics include
• General
• Protection of Persons and Property
• Maintenance
• Enclosures
The General topic rules 2-100 to 2-104 deal primarily with required attributes of electrical equipment. Such topics as equipment markings, warning and caution markings, and ratings of equipment are included here.Although these requirements are also contained in the Part II Product Standards, the CEC Part I being the senior code document, the requirements are established here.

Rules 2-106 to 2-124 contain general requirements governing some specific conditions applying to equipment, such as using rebuilt equipment, substitution, and circuit voltage to ground in dwelling units. Other rules apply to conditions of installations like quality of work, material to be used for anchoring in masonry and concrete, corrosion protection for material used in wiring, soldering fluxes, use of AWG sizes for wire, accessibility of electrical equipment and nameplates, and the installation of other equipment near electrical equipment.

Rules 2-126 to 2-132 discuss requirements for the use of thermal insulation near or adjacent to electrical equipment, control of fire spread, and control of flame spread of wiring, cables and non-metallic raceway in accordance with the National Building Code of Canada requirements, which are referenced in Appendices B and G.

Rules 2-134 and 2-136 give sunlight resistance requirements for wire cable and non-metallic raceways and the insulation integrity of the finished installation. The final rule in the 2-100 series, rule 2-138, prohibits the use of Class A GFCIs being used as a substitute for insulation or grounding except as permitted by Rules 10-408(4) and 26-700(8).

Protection of Persons and Property: rules 2-200 and 2-202 require electrical equipment to be installed and guarded for the safety of persons and protection of equipment and the guarding of bare live parts.

The next 2-300 to 2-324 series of rules deals with Maintenance and Operation. These rules cover the need to keep electrical equipment well maintained, in good working order and tested for proper operation.As well, these rules specify safe working practices for maintaining equipment in hazardous locations, disconnection of live equipment, provisions for shock and arc flash protection and working space around electrical equipment, as well as adequate entrance and exit provisions for spaces containing electrical equipment.

Rules 2-312 to 2-324 cover placement of electrical equipment, accessibility for maintenance and proper illumination, ventilation, drainage and clearances from flammable materials and combustible gas equipment. In addition, rule 2-314 requires a receptacle to be provided for maintenance of HVAC equipment located on a rooftop.
Enclosures: rules 2-400 to 2-404 cover the types, uses and marking of enclosures and motors for various environmental conditions.

These are the administrative and general technical rules that apply to all electrical equipment and installations.You will often need to refer to these in combination with the specific rules of the Code to ensure compliance and an essentially safe installation.

In the next article we will explore Section 4 – Conductors. The previous article explored the code’s introductory pages and preface.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • Ontario Drives Growth in Residential Building Construction in September

    Ontario Drives Growth in Residential Building Construction in September

    November 25, 2024 Investment in building construction rose 2.1% to $21.6 billion in September, following a 0.2% increase in August. The residential sector increased 2.9% to $15.2 billion in September, while the non-residential sector edged up 0.3% to $6.4 billion. Year over year, investment in building construction grew 6.7% in September. On a constant dollar basis (2017=100), investment in building construction increased 1.6% from… Read More…

  • Ontario’s Institutional Construction Intentions Push up the Non-Residential Building Permits in September

    Ontario’s Institutional Construction Intentions Push up the Non-Residential Building Permits in September

    November 25, 2024 The total value of building permits in Canada increased by $1.3 billion (+11.5%) to $13.0 billion in September, reaching the second-highest level since the start of the new series in January 2017. Ontario’s construction intentions grew by $1.2 billion (+25.0%) to $5.9 billion in September 2024, leading gains in both the non-residential and residential sectors. On a constant… Read More…

  • Red Seal Self-Assessment Questions

    Red Seal Self-Assessment Questions

    November 25, 2024 Each trade’s self-assessment tool is available to help you understand your own readiness for challenging the Red Seal exam in that trade. It goes through all topics that are included in the trade’s standard (Red Seal Occupational Standard/National Occupational Analysis) and asks you to reflect on whether you have the experience and knowledge in each… Read More…

  • Halifax Regional Municipality Seeking Deep Energy Retrofit Service Providers

    Halifax Regional Municipality Seeking Deep Energy Retrofit Service Providers

    November 25, 2024 Halifax Regional Municipality (HRM) is seeking qualified deep energy retrofit service providers to be added to its roster of approved contractors. Submit your response to be considered for future deep energy retrofit projects with HRM by the January 6 deadline. Go HERE for more information Read More…


Changing Scene

  • ITC Electrical Components Celebrates 30 Years of Service to the Electrical, Automation and OEM Market in Canada

    ITC Electrical Components Celebrates 30 Years of Service to the Electrical, Automation and OEM Market in Canada

    November 25, 2024 Celebrating its 30th anniversary, ITC Electrical Components has recently launched its new and improved website at www.itcproducts.com. After a successful 15-year career in the electrical components industry Luca Fontana founded ITC Electrical Components in 1994.  Since that time the company has grown from a home-based operation to a successful business with 15 employees and… Read More…

  • Eaton Canada Investing $15m to Expand Manufacturing Capacity

    Eaton Canada Investing $15m to Expand Manufacturing Capacity

    November 25, 2024 Eaton Canada is investing approximately $15 million to expand manufacturing capacity to meet growing demand for its electrical solutions driven by the ongoing electrification of Canada’s economy. These investments will expand the company’s low-voltage manufacturing footprint by 20%, increasing its ability to produce the switchboards, switchgear and panelboards needed to support Canada’s… Read More…

  • Bartle & Gibson Announces Partnership with Electric Avenue

    Bartle & Gibson Announces Partnership with Electric Avenue

    November 25, 2024 Bartle & Gibson Co. Ltd., a Western Canada-based premier plumbing, heating and electrical distributor, proudly announced a new regional partnership to distribute Electric Avenue, providers of convenient, affordable and easy-to-use smart charging solutions for residential and commercial use, across Western Canada. Electric Avenue was founded in 2021 with one simple mission: to… Read More…

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…