Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)

Code Changes Roundup

Bill Burr

Read Part 2 Here

Often, users encounter situations where they find themselves at odds with the rules contained in the Canadian Electrical Code, Part I (the Code).These situations can occur for designers, consultants, installers, inspectors, manufacturers, students, instructors and standards developers alike, and usually result from a misreading, misunderstanding, misapplication or inability to locate the requirement that is needed or relevant to their tasks.

The Code is a comprehensive document. Sometimes, trying to find information quickly can seem quite daunting.Over the next series of articles, I will provide a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook2, but will hopefully provide some help in navigating the Code.

Introductory pages and preface

The first few pages contain the Table of Contents, the names of the main technical committee and sub-committee members, and the all-important information in the preface. Why is the preface so important? Well, the preface, in addition to a list of reference publications, explains how the Code is organized. This arrangement of the outline provides a road map to finding your way. With this tool you can direct yourself to the exact rule or sub-rule that is the subject of your quest.

The first guidepost, indicated in the preface, is that 

• Sections 0 to 16 and Section 26 are general sections that apply to all installations

• all other sections, which apply to specific situations, amend or supplement these general sections.

The usefuleness of this key distinction will become clearer later in our exploration. The preface doesn’t mention this, but Appendix A and C are normative (mandatory), and all the other appendices are informatory (non-mandatory) parts of the Code. The Tables and Drawings pages are also normative. 

Section 0

Moving on to Section 0, we discover the object and scope of the Code, and the definitions of terms contained in the code.

Object

The object states that this Code establishes safety standards for the installation and maintenance of electrical equipment, where consideration has been given to the prevention of fire and shock hazards, as well as proper maintenance and operation.It also notes that the Code addresses the fundamental principles of protection for safety contained in Section 13 of IEC 60364-1, which is the International Electrotechnical Commission (IEC) standard for low voltage installations (1000 volts or less). You can examine these principles in Appendix K.

We are made aware, by the Object statement, that compliance with the requirements of the Code and proper maintenance will ensure an essentially safe installation, as protection against electric shock, thermal effects, over-current, fault currents, and over-voltage will be met.Also noted is that alternatives to the Code that comply with the fundamental principles of IEC 60364-1 may also be used to achieve safe installations, but only if used in conjunction with acceptable means to assess compliance, by the authorities enforcing the Code.This provision is intended for and usually applies to an industrial installation, under a specific safety management program developed with the authority having jurisdiction. Since the Code is adopted into law by each jurisdiction, any amendments or alternatives must also be adopted into law in that jurisdiction.

Scope

As we move to the Scope statement, we discover that basically all electrical work and equipment is covered by the Code with the exception of

• installations employed by a utility in its function as a power or communication utility

• electric railways

• aircraft

• ships that are not connected to a shore supply for more than five months

If you are looking for rules that apply to a mine or quarry, there are additional requirements in CSA M421.

Definitions

Next up are the definitions. The definitions contained in Section 0 are for specific words or terms used in the Code to aid in understanding and interpretation. An ordinary dictionary meaning applies for any word or term that is not specifically defined in Section 0.These definitions apply generally throughout the CE Code. However, some sections also contain definitions that apply to terms used only in that particular section.It is very important that you check these definitions when reading any specific rules.Although you may have a general idea of the meaning of a term, the Code definition can sometimes affect the application of the rule. 

As an example let’s look at the definition of the word Approved(as applied to electrical equipment).It is generally acknowledged that electrical equipment needs to be certified by a certification organization to be approved.But wait! There’s more! According to the definition, that certification organization needs to be accredited by the Standards Council of Canada (SCC), and in addition, the product needs to be certified that it meets the requirements of

• CSA safety standards for electrical products (Part II standards), or

• other standards developed by an SCC accredited standards development organization (SDO) or other recognized documents where CSA Standards do not exist for that product.

In the case of non-CSA standards or other recognized documents, they must be correlated with the Code and also must not duplicate standards listed in Appendix A. The definition also conveys alternatively that equipment meeting the requirements of the regulatory authority is also considered approved. This normally refers to field evaluation by an accredited special inspection body that is recognized by the authority having jurisdiction and facilitates the approval of new or limited manufacture products. So you see, a lot of information is contained in this definition of Approved. The Appendix B note on this definition would also be very beneficial to the Code users.

Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2:
A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9:
Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 – Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 – Installment 11


 

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

 

Related Articles


Latest Articles

  • Intermatic Acquired by MPE Partners

    Intermatic Acquired by MPE Partners

    May 19, 2025 By David Gordon, Channel Marketing Group, President The Intermatic deal is done. It has been rumored for months that Intermatic was being sold. Strategic buyers and private equity firms were mentioned as expressing interest and reviewing “the book” throughout the fall (and some mentioned even last summer.) According to sources, it was a “challenge” for… Read More…

  • 6 Things Contractors Need To Know About the Security Kit for Wire Mesh Tray

    6 Things Contractors Need To Know About the Security Kit for Wire Mesh Tray

    May 19, 2025 The rapid expansion of data centers has brought about significant challenges in maintaining data security standards. According to Statistics Canada, recovery costs from cyber security incidents in 2023 were $2.1 billion, up from $600 million in 2021. This critical situation requires a more robust cable management design to protect data from being… Read More…

  • NSAA Information on Potential Canada Post Strike

    NSAA Information on Potential Canada Post Strike

    May 19, 2025 In case of a possible Canada Post mail disruption: Source Read More…

  • How to do Business with ESA During a Canada Post Disruption

    How to do Business with ESA During a Canada Post Disruption

    May 19, 2025 The Electrical Safety Authority (ESA) is reminding stakeholders that they can continue to do business during a postal strike and ensure they meet their compliance obligations. This includes applications for inspection, LEC and ME licence renewals and payments.  Online Is Your Best Option  ESA has several options for LECs and MEs to… Read More…


Changing Scene

  • Catalyst Sales and Marketing Announces New Partnership with MGM Transformers

    Catalyst Sales and Marketing Announces New Partnership with MGM Transformers

    May 19, 2025 Catalyst Sales and Marketing is proud to announce a new line partnership with MGM Transformer Company, a recognized provider of dry-type and liquid-filled transformers for commercial, industrial, and infrastructure applications. With over 50 years of expertise, MGM delivers custom-engineered, reliable, and energy-efficient solutions designed to meet the demands of data centers, renewable… Read More…

  • Intermatic Acquired by MPE Partners

    Intermatic Acquired by MPE Partners

    May 19, 2025 By David Gordon, Channel Marketing Group, President The Intermatic deal is done. It has been rumored for months that Intermatic was being sold. Strategic buyers and private equity firms were mentioned as expressing interest and reviewing “the book” throughout the fall (and some mentioned even last summer.) According to sources, it was a “challenge” for… Read More…

  • Production Underway at Shawflex’s New Vaughan Manufacturing Facility

    Production Underway at Shawflex’s New Vaughan Manufacturing Facility

    May 19, 2025 Shawflex Facility Update! Shawflex announced via LinkedIn that production is officially underway at their new manufacturing facility in Vaughan. “While final steps are in progress and on track, our start to production is a testament to the seamless planning, coordination, and dedication of our incredible team. This milestone marks a major step forward… Read More…

  • EFC Welcomes New Manufacturer Member: Valid Manufacturing Ltd.

    EFC Welcomes New Manufacturer Member: Valid Manufacturing Ltd.

    May 19, 2025 Since 1992, Valid Manufacturing Ltd. has built their reputation as a world class innovator. By focusing on exceptional quality and service, they have developed strong relationships with renowned industry leaders. With four modern production facilities spanning over 100,000 sq. feet, Valid has the capacity and proven track record to tackle any project… Read More…