2015 CE Code — Part 1 Changes: I

Caution Marking

Steve Douglas

Read Part 2 of CE 2015 Code Changes here.
Read Part 3 of CE 2015 Code Changes here.
Read Part 4 of CE 2015 Code Changes here.
Read Part 5 of CE 2015 Code Changes here.

This is the first of several articles published by the International Association of Electrical Inspectors that details significant changes for the 2015 Canadian Electrical Code Part I (CE Code).

Warning and caution markings

A new rule has been added to Section 2 regarding warning and caution markings. This new rule requires field installed warning and caution markings required by the CE Code to be written in the language(s) mandated by the local authorities having jurisdiction. Examples of filed installed warning and caution markings are the arc flash markings required by Rule 2-306 and the danger high voltage markings required by Rule 36-006. An example of marking NOT required by this new rule to be written in the language(s) mandated by the local authorities having jurisdiction is the panel schedule required by Rule 2-100(3).

Panel Schedule

 

Rule 2-126

The flame spread requirements of the National Building Code of Canada have been expanded in the Appendix B note for Rule 2-126 to include FT6 cables intended for air plenums.

Rule 4-004

Rule 4-004 has a new subrule allowing the size of service conductors for single dwellings and feeder conductors supplying single dwelling units of row housing of apartment and similar buildings to be selected in accordance with a new Table 39. The new subrule and table result in conductor sizing similar to those allowed in the 2009 CE Code. This subrule and new table have two limitations. First, the connected distribution equipment must have a conductor termination temperature of not less than 75° C. Second, the 5% allowance in Rule 8-106(1) cannot be used in conjunction with Table 39.

Rain-tight connectors and couplings

The term rain-tight has been replaced with wet location in Section 6 and Section 12. The reasons for this change were to provide clarification as to where the specific connectors and couplings can be used and to align with recent changes to CSA Standard C22.2 No 18.3 Conduit, Tubing, and Cable Fittings.

Codes Single Dwelling

Rule 10-208

Rule 10-208 has a new Subrule (2) for buildings housing livestock supplied from distribution equipment. This new subrulerequires the buildings housing livestock to be supplied only from a feeder or branch circuit with the non-current-carrying metal parts of the electrical equipment in or on the building or structure bonded to ground by a bonding conductor run with the feeder or branch circuit conductors. The reason for this change is to address stray voltages also known as tingle voltage on farms. The impact on installations may be significant, particularly where the electrical contractor does not install a bond conductor with the feeder to buildings housing livestock, as this subruleno longer allows the feeder neutral to be bonded to ground at the buildings housing livestock.

Codes EMT Coupling

A sample wet location EMT coupling and connector previously known as rain-tight coupling and connector

Table 16

Table 16 has been divided into two tables, Table 16A and 16B. Table 16A provides the size of bonding conductors based on the size of the largest ungrounded conductor, and Table 16B provides the size of bonding conductors based on the ampacity of the largest ungrounded busbar. The rationale for the change to Table 16 was to provide clarification as to the minimum size of bond conductors required. The previous Table 16 based on the ampacity of the largest ungrounded conductor led to confusion by code users unsure of what allowable ampacity to apply to the bonding table.

Codes Livestock

Rule 10-906

The word “conductor” has been replaced with “connection” in Subrule (3) of Rule 10-906. The previous wording using the word “conductor” required each bond conductor to be secured directly to the metal box. As an example, where four cables enter a metal box all four bond conductors (the bonding conductor) must be connected directly to the metal box. The bare conductor in each cable is “the bond conductor.” A literal interpretation of Subrule (3) requires the bond conductor to be secured to every metal box by means of a bonding screw as shown in photo 6.

Codes Device Box

A device box with the bond conductor from each non-metallic sheathed cable terminating directly to the device box bonding screw

Changing the word “conductor” to “connection” recognizes the existing practice of terminating a bond conductor directly to the metal box then connecting all the bond conductors together with a twist-on type connector as shown in photo 7.

Codes Device box 2

A device box with the bond conductor from one non-metallic sheathed cable terminating directly to the device box bonding screw, with the rest of the bond conductors connected to the one conductor that is directly connected to the device box

Rule 12-610

Subrule (1) of Rule 12-610 has been divided into two items. Item (a) still requires an insulating bushing (anti-shorts) or equivalent protection installed between the conductors and the armour of armoured cable. Item (b) is a new requirement for armoured cable provided with an inner jacket (Tech 90); the inner jacket is now required to protrude a minimum of 5 mm beyond the armour (see photo 9). In addition, an Appendix B note has been added to clarify that the paper or plastic wrap around the cable core, directly under the armour of an armoured cable, is not considered the inner jacket (see photo 8).

Codes Insulated Bushing

An insulating bushing (anti-shorts) installed between the conductors and the armour of armoured cable visible from inside an enclosure where the cable is terminated

Codes Tech 90 Cable

The inner jacket of a Tech 90 cable protruding beyond the armour

Rule 12-1014

The general raceway fill requirements in Rule 12-1014 have been moved to the 12-900 series of rules for raceways. In addition, all the corresponding individual raceway references to Rule 12-1014 have been updated. The rationale for this change to the existing Rule 12-1014 provides direction for rigid metal and metal flexible conduit without clear direction for other types of conduit or tubing. The change locates the requirements in with the general rule for raceways.

Table 9

Table 9 has been changed dramatically. Table 9 has been expanded into 10 tables. Tables 9A through 9J cover the cross-sectional areas of the following circular raceways:

• Table 9A – CSA C22.2 No 22.2 No. 45 Rigid metal conduit

• Table 9B – CSA C22.2 No 22.2 No. 56 Flexible metal conduit

• Table 9C – CSA C22.2 No 22.2 No. 211.2 Rigid PVC conduit

• Table 9D – CSA C22.2 No 22.2 No. 211.1 Rigid Types EB1 PVC conduit

• Table 9D – CSA C22.2 No 22.2 211.1 No. Rigid Types DB2/ES2 PVC conduit

• Table 9E – CSA C22.2 No 22.2 No. 211.3 Rigid RTRC conduit Type IPS

• Table 9F – CSA C22.2 No 22.2 No. 211.3 Rigid RTRC conduit Type ID

• Table 9G – CSA C22.2 No 22.2 No. 56 Metallic Liquid-tight flexible conduit

• Table 9H – CSA C22.2 No 22.2 No. 227.2 Non-metallic Liquid-tight flexible conduit

• Table 9I – CSA C22.2 No 22.2 No. 83 and C22.2 No 22.2 No. 83.1 Electrical metallic tubing

• Table 9J – CSA C22.2 No 22.2 No. 227.1 Electrical non-metallic tubing

The reason for the additional tables is the internal diameter in the raceway standards listed above is different for individual raceway types.

Table 6

Table 6 has 11 individual tables. The individual tables have separate table numbers from 6A to 6K for easier reference.

As a result of the change to Table 9, the existing Table 6 was inaccurate and needed to be updated. A new table was created based on the smallest size of conduit and tubing available (see figure 1). Figure 1 shows the CSA standard number and the smallest conduit or tubing size. Note: The smallest internal diameters are identified in red.

Codes CSA Standards

This table shows the CSA standard number and the smallest conduit or tubing size used to calculate new Tables 6A to 6K

Codes Rigid Conduit

An example of an installation of rigid conduit covered by new Table 9A

The most dramatic change in Table 6 is in the 16 trade size (1/2?). As an example, if #14 AWG 600V T90 nylon conductors installed in a raceway; Table 6 from the 2012 CE Code allows 12 conductors in the raceway, while the 2015 CE Code Table 6K allows only 7 conductors because Table 6K is based on the smallest 17 trade size raceway that is Rigid RTRC ID conduit. As alternative to using a Table 6, the maximum number of conductors that can be installed in a specific raceway can be calculated using the new appropriate Table 9. Using the same example as above with a rigid metal conduit and the new Table 9A the maximum number of conductors is 13.

Read Part 2 of CE 2015 Code Changes here.
Read Part 3 of CE 2015 Code Changes here.
Read Part 4 of CE 2015 Code Changes here.
Read Part 5 of CE 2015 Code Changes here.


 

Steve Douglas is an IAEI International Past President. He is also the Senior Technical Codes Specialist for QPS Evaluation Services. As the International Association of Electrical Inspectors representative on Part I and Part II of the Canadian Electrical Code, Steve is the vice chair of the CE Code Part I, chair of CE Code Part I Subcommittees for Section 2, and 12, and a member on Sections 40, 64, 68, 76 and Appendix D. In addition, Steve is Chair of the CSA Standards C22.2 No. 273 Cablebus, C22.6 No. 1, Electrical Inspection Code for Existing Residential Occupancies committee, Chair of the SPE-1000 Working Group, and a member on committees for the Objective Based Industrial Electrical Code, Safety Management Systems, Solar Photovoltaic Modules, Photovoltaic Cable, Fuel Cells, Wind Turbines, Distribution transformers, Outlet Boxes, and Wiring Fittings Hardware and Positioning Devices.

 

Related Articles


Latest Articles

  • Alberta Municipalities EV Charging Installation Rebate

    Alberta Municipalities EV Charging Installation Rebate

    April 4, 2025 Alberta Municipalities are proud to provide financial rebates for applicants to purchase and install electric vehicle charging stations in Alberta as part of the Electric Vehicle Charging Program (EVCP), funded by Natural Resources Canada (NRCan) & Alberta Municipalities.  The funding will cover up to 46% of your total project cost, which can… Read More…

  • Industry Legend Bill Smith Retires

    Industry Legend Bill Smith Retires

    April 4, 2025 By Electro-Federation Canada On March 25, Electrozad, a Sonepar Company, hosted a special retirement reception at Caesars Windsor for industry titan Bill Smith who marked an incredible 50-year career with the company.  The reception was held in the elegant Caesars Ballroom, which featured an array of food stations and elegant decor. In… Read More…

  • Schneider Electric: Your Trusted Partner in Sustainability and Efficiency

    Schneider Electric: Your Trusted Partner in Sustainability and Efficiency

    April 4, 2025 By Krystie Johnston Schneider Electric is on a mission to be the trusted partner in sustainability and efficiency. Since 1836, they have pioneered technological innovation to create a world where life is on. Frederick Morency, Vice President of Sustainability, Strategic Initiatives & Innovation at Schneider Electric Canada, has experienced this joie de… Read More…

  • The Evolving Landscape of Energy Management in Buildings with Trilliant’s Steven Lupo: AMI, EV Charging, DERs & Beyond Metering

    The Evolving Landscape of Energy Management in Buildings with Trilliant’s Steven Lupo: AMI, EV Charging, DERs & Beyond Metering

    March 31, 2025 By Blake Marchand Late last year Trilliant announced partnerships with Oshawa Power and Milton Hydro to enable suite metering and advanced metering technology using their Smart Building Platform. Those partnerships were the jumping off point for my conversation with Steven Lupo, Managing Director, North America at Trilliant, a company with four decades of innovation in Canada… Read More…


Changing Scene

  • NSAA Fee Change Effective April 1, 2025

    NSAA Fee Change Effective April 1, 2025

    As of April 1, 2025, the Nova Scotia Apprenticeship Agency’s fees have changed due to the 1% reduction in HST in Nova Scotia. NSAA noted on their website that due to the number of references across various pages, you may still come across old fee amounts as they work through updating their website. Here is… Read More…

  • Nominations Open for 2024 NETCO Leadership Excellence Award

    Nominations Open for 2024 NETCO Leadership Excellence Award

    Established in 2016, the NETCO Leadership Excellence award honours an industry training professional for his/her role for the success and their outstanding contributions to apprenticeship training and continuing electrical training. Read More…

  • Munded Partners with Kane Test Equipment in Atlantic Canada

    Munded Partners with Kane Test Equipment in Atlantic Canada

    April 4, 2025 Munden Enterprises has announced a partnership with Kane Test Equipment to bring their test and measurement solutions to Atlantic Canada. “We are now excited to announce a new and promising partnership with Kane Test Equipment. Kane Test Equipment brings innovative solutions that align with our dedication to providing the best tools for… Read More…

  • Nedco Announces Western Canadian Wire & Cable Sales Manager

    Nedco Announces Western Canadian Wire & Cable Sales Manager

    April 4, 2025 Don Blake has joined Nedco as their Western Canadian Wire & Cable Sales Manager. “With over 20 years of experience in the Wire & Cable industry, Don brings a wealth of knowledge and expertise to our Nedco West team,” said the company on LinkedIn. “His focus will be on expanding our product… Read More…