Case Study: Temporary Power for Large Scale Residential Construction

Temporary Power

Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles


Changing Scene

  • Skills Ontario Supports Ontario’s Investments in Skilled Trades in Budget Announcement

    Skills Ontario Supports Ontario’s Investments in Skilled Trades in Budget Announcement

    March 28. 2024 As demand for skilled trades professionals rises, Skills Ontario is commending the government for continued investments in skilled trades and technology programing, working to address the shortfall and need to build the workforce of the future in Ontario.  The skilled trades shortage is costing Ontario approximately $25 billion in foregone GDP. A… Read More…

  • IVRY Launches 7 New VR Lessons

    IVRY Launches 7 New VR Lessons

     IVRY Technologies, a division of IDEAL Electrical, is launching seven new virtual reality (VR) lessons in Canada as part of its Virtual Electrical Training (VET) Series 2 training module. The cutting-edge training will serve as a learning resource for International Brotherhood of Electrical Workers (IBEW) training centers across Canada. Read More…

  • PEI Budget 2024 Signals Continued Focus on Healthcare, Housing and Affordability for all Islanders 

    PEI Budget 2024 Signals Continued Focus on Healthcare, Housing and Affordability for all Islanders 

    March 28, 2024 Hon. Jill Burridge, Minister of Finance, presented government’s 2024-25 operating budget to the legislative assembly, outlining $3.2 billion in investments for Prince Edward Island with a continued focus on healthcare, housing and affordability measures. “This budget signals where we’re headed as a province and shows Islanders where we will be making key… Read More…

  • BC’s Budget 2024 Prioritizes Actions for Low-Carbon Economy

    BC’s Budget 2024 Prioritizes Actions for Low-Carbon Economy

    March 28, 2024 Josie Osborne, Minister of Energy, Mines and Low Carbon Innovation, and Brittny Anderson, MLA for Nelson-Creston, met with community climate leaders in Nelson to discuss how Budget 2024 can help support people in the region to transition to a low-carbon economy and meet shared CleanBC goals. “Our government’s budget this year reflects the… Read More…