Number of power establishments by employment size category and region: December 2015
March 8 2016
The small and micro enterprises form the largest number of electrical workers.
Source: Statistics Canada http://www.servicecanada.gc.ca
March 8 2016
The small and micro enterprises form the largest number of electrical workers.
Source: Statistics Canada http://www.servicecanada.gc.ca
The National Bank of Canada’s Montreal headquarters possesses a Grand Hall that is an ornate masterpiece. Its rose, Italian Tavernelle marble walls, Corinthian colonnades of syenite, with black Belgian marble bases, its bronze railings and door frames, golden ornamented moulding, ceiling panels, and large colonnades are a majestic throwback to a bygone era. The lighting design needed to accentuate and celebrate this historic structure’s arresting grandeur without washing out the ornate details, while also creating a functional and welcoming workplace.
As an indispensable basic concept for all reflections on protective technology in low‐voltage installations, the concept of security is widely recognized today as “freedom from unacceptable damage risks.”
January 13, 2023 By Jas Saraw, VP, Canada, Procore Looking at Canadian contruction trends in 2023, I expect a year of challenge and change as the Canadian construction industry grapples with ongoing problems such as the labour shortage while continuing to move toward integrated project delivery to achieve greater efficiency. At Procore, we are watching…
A workshop conducted on behalf of Technical Safety BC (TechSafeBC) to evaluate potential causes of electric shock risks has produced a series of recommendations that address root causes behind the risks.
December 5, 2022 60 LED Mini-Style Lights Issue: Consumer products – Electrical hazard What to do: Immediately stop using the recalled decorative lighting string and dispose of it in accordance with the applicable local transportation and waste requirements for electronic products. This recall involves 60 LED Mini-Style Lights with multi-colour bulbs and green wire for indoor…
LDS caught up with General Manager of EiKO’s Canadian division, Stephen Lee who was kind enough to take some time out of his busy schedule to share his perspective on the industry.
Section 26 is a general section of the code and applies to the installation of all electrical equipment. Appendix B contains important additional helpful notes. This section is divided into several parts, with the general rules 26-002 to 26-012 applying to all electrical equipment and additional parts for specific types of equipment. Read More…
January 9, 2025 The Manitoba government is investing $1.5 million in the Climate Action Fund to support a low-carbon future, Environment and Climate Change Minister Tracy Schmidt announced today. “We are firmly committed to taking real action to tackle climate change and we have been working hard to have a positive impact on the environment… Read More…
January 9, 2025 The second annual ECABC Innovation Award will be presented at ECABC’s AGM & Conference Gala Dinner in Victoria on June 13, 2025. The Award highlights a project completed during 2024 that exemplifies the use of innovation in electrical construction to improvise a task, solve a problem or significantly improve a project (i.e…. Read More…
Tom decides to add chickens and egg production to his cattle farming operation. He adds a chicken coup to the barn where he houses his cattle. The coup is suitably cut off from the barn and will contain an electric heater, luminaires and switches. Read More…
January 10, 2025 Mattr Corp. has announced that it has closed its previously announced acquisition of AmerCable Incorporated [see press release], which now forms part of Mattr’s Connection Technologies reporting segment. Under the terms of the transaction, Mattr has acquired all of the outstanding shares of AmerCable from Nexans USA Inc. for a purchase price… Read More…
January 10, 2025 The Ontario government is launching new energy efficiency programs, including the new Home Renovation Savings Program. The programs are part of a new $10.9 billion, 12-year investment in energy efficiency. The new Home Renovation Savings Program will launch on January 28, 2025, and offer rebates of up to 30 per cent for home energy… Read More…
January 9, 2025 The Affordable Heat Pump Program (AHPP) is fully subscribed through 2025, with 84 households receiving heat pumps through the program since the program launched on December 19, 2024. The rapid uptake of the program exceeded expectations, demonstrating Yukoners’ interest in switching to more efficient electric heating sources that result in lower utility… Read More…
January 6, 2025 Electricity Human Resources Canada (EHRC) is thrilled to announce Jesse Spring, CEO of Primary Engineering and Construction, as the recipient of the 2024 Leader of the Year Award. EHRC proudly recognizes Jesse for his leadership, which is built on excellence and powering growth. Jesse’s journey with Primary began in 2008 as an… Read More…
This project is funded [in part] by the Government of Canada.
Ce projet est financé [en partie] par le gouvernement du Canada.