Electrical Engineering Design Median Hourly Rate by Province
September 21, 2017
Saskatchewan leads Canada with the highest Hourly rate for electrical engineers. Alberta comes in second.
September 21, 2017
Saskatchewan leads Canada with the highest Hourly rate for electrical engineers. Alberta comes in second.
In this article: Annex J18, Part B. Annex J18 is optionally permitted for use in additions, modifications, renovations or operation and maintenance of existing facilities employing the Division system of classification.
From rising construction costs to the shrinking labor force, electrical contractors’ jobs aren’t getting any easier. When you’re already juggling many challenges, keeping up with evolving technologies can feel daunting.
62-000 Scope states that this is a supplementary or amendatory section of the Code and applies to the installation of electric heating systems for space heating, surface heating and other electric heating system applications. Appendix B and the CE Code Handbook provide additional information.
This past September, the audiovisual production company Attraction moved into their new workspace. For the 300 or so employees, the change was drastic.
A key component of any electronic or electrical system is the cable assembly/cable harness, yet it typically is one of the last components to be addressed. When designing a system the cable assembly should be addressed as early in the design stage as possible to allow for the best design to be specified for the application at hand. Many components will be involved in the assembly design, and each component will have an impact on the performance of the finished cable assembly or wire harness. If an assembly that is either over-designed or under-designed is used, there will be negative consequences of the performance of the finished system.
In our workplaces we’ve likely heard a lot about how women are underrepresented in the electrical industry, particularly when it comes to trades and technical occupations. We don’t have to look very far to see that this is true (although it is changing slowly, and we have seen some amazing progress and commitments from sector companies).
January 20, 2025 The total value of building permits issued in Canada decreased by $739.5 million (-5.9%) to $11.7 billion in November, a second consecutive monthly decline. The residential sector led the decrease, followed by the non-residential sector. On a constant dollar basis (2017=100), the total value of building permits issued in November declined 5.8% from the previous… Read More…
January 20, 2025 On January 7, the Government of Ontario announced 14 new and expanded energy-efficiency programs, including the Home Renovation Savings Program, as part of a new $10.9 billion investment in energy efficiency to help families and businesses save money. Save on Energy and Enbridge Gas, with endorsement from the Ontario government, have partnered to… Read More…
The National Electrical Trade Council (NETCO), a collaboration between the International Brotherhood of Electrical Workers (IBEW) Canada and the Canadian Electrical Contractors Association (CECA), has taken a major step in standardizing electrical training across Canada with the launch of its VR Motor Control Training. Read More…
Section 26 is a general section of the code and applies to the installation of all electrical equipment. Appendix B contains important additional helpful notes. This section is divided into several parts, with the general rules 26-002 to 26-012 applying to all electrical equipment and additional parts for specific types of equipment. Read More…
January 16, 2025 Leviton Canada is pleased to announce structural changes to its Canadian Sales Department, effective January 1, 2025. These changes aim to enhance sales synergy, optimize resource allocation and strengthen their relationships with customers across the country. Jason Denstedt now assumes the role of Vice-President of National ED Sales, overseeing the national Electrical… Read More…
January 16, 2025 Nesco is pleased to announce the appointment of Sean Atkinson at Resilient Sales as their sales agent for Northern Ontario, effective January 1st, 2025. “Sean is replacing Steve Wallace, who after decades of providing tireless customer service and sales support is focusing on family and enjoying some well-deserved downtime in retirement,” commented… Read More…
January 15, 2025 ABB Electrification’s Smart Buildings Division and Wieland Electric have announced a strategic partnership to revolutionize modular and serial construction with advanced prefabricated electrical installation systems. The collaboration combines Wieland’s innovative connector technology with ABB’s extensive portfolio – including switches, sockets, installation boxes, energy distribution, and smart home solutions – to deliver plug-and-play… Read More…
January 15, 2025 ABB has announced the acquisition of Lumin, a U.S.-based pioneer and leading provider of responsive energy management systems, to expand its home energy management capabilities in the North American residential sector. The acquisition follows a strategic minority investment by ABB into the company in 2023. Financial terms of the transaction were not… Read More…
This project is funded [in part] by the Government of Canada.
Ce projet est financé [en partie] par le gouvernement du Canada.