Value of March Building Permits Up 2.1% from February

Value of March Building Permits

May 16, 2019

Canadian municipalities issued $8.1 billion worth of building permits in March, up 2.1% from February. The increase was attributable to higher construction intentions in Western Canada.

Building permits up in Western Canada, down east of Manitoba

Four provinces reported increases in March, led by British Columbia with an increase of 12.8% (+$180 million). Meanwhile, all provinces east of Manitoba reported declines. The largest decrease was in Ontario, down 1.4% (-$43 million) due to lower construction intentions in the residential sector.

Quebec drives movement in non-residential permits

The national value of permits for non-residential buildings rose 7.9% in March, due to higher construction intentions for both institutional (+$175 million) and commercial (+$166 million) buildings. Gains in both of these components stemmed from Quebec. A high value permit for an addition to the Centre hospitalier de l’Université de Montréal drove the increase in the institutional component.

In the industrial component, the value of permits declined 15.6% in March (-$102 million). The decrease was largely the result of lower construction intentions in Quebec, where multiple high-value permits had been issued in February.

The value of single-family permits declines in the residential sector

Municipalities issued $4.8 billion worth of residential permits in March, down 1.5% from February. The decline was largely attributable to lower construction intentions in Ontario (-$102 million) and Quebec (-$99 million).

The value of single-family dwelling permits was down 5.0% (-$108 million) from the previous month. Seven provinces reported declines, with the largest decrease in Ontario (-$58 million).

Meanwhile, the value of multi-family dwelling permits increased 1.3% (+$37 million) in March. Six provinces posted increases, led by Manitoba and British Columbia.

First quarter 2019: permits down sharply in Alberta year over year

Municipalities issued $24.3 billion worth of permits in the first quarter, down 3.5% (-$877 million) compared with the same quarter last year. Five provinces posted declines, with the majority of the decrease coming from Alberta (-$1.0 billion).

Every component was down in Alberta in the first quarter compared with the same quarter last year. Single-family construction accounted for approximately half of the provincial decline (-$539 million). This was the lowest value for single-family dwelling permits since the first quarter of 2009.

Meanwhile, in Quebec, the value of permits rose 2.1% (+$105 million) year over year in the first quarter. Every component except multi-family dwellings was up. The increase was largely the result of higher construction intentions for non-residential buildings.

Source: Statistics Canada, www150.statcan.gc.ca/n1/daily-quotidien/190510/dq190510b-eng.htm

Related Articles


Latest Articles

  • Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    Guide to the Canadian Electrical Code, Part 1[i], 26th Edition– A Road Map: Section 56

    February 6, 2026 By William (Bill) Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or Read More…

  • 3D Printing: Inside Lighting’s Next Revolution

    February 5, 2026 While 3D printing in mass production was once a dream, advancements in the technology have moved it more into the mainstream. The technique, which is also referred to as additive manufacturing, has rapidly evolved from a niche prototyping tool into a transformative production method for many sectors, including the lighting industry. As Read More…

  • Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    Microgrids & Power Quality: Designing Resilient, Clean Facility Power

    February 5, 2026 In an era of extreme weather, aging infrastructure, and ever‑rising energy demands, many facility managers are rethinking their relationship with the grid. Microgrids offer a way to take control and operate autonomously when necessary. A microgrid is more than just backup, when designed properly, it becomes a platform for resiliency, efficiency, and Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 5, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…


Changing Scene

  • Lighting What’s Next: Stanpro Celebrates 65 Years

    Lighting What’s Next: Stanpro Celebrates 65 Years

    February 6, 2026 “We didn’t get here by standing still. For 65 years, we’ve shaped how we think, how we design, and what responsibility means,” the company said in a LinkedIn post. “Today, that thinking takes a new form. Not to change who we are, but to express our evolution more clearly. This is Stanpro, Read More…

  • Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    Housing Priorities on Track in New Brunswick, but More Work to do: Hickey

    February 6, 2026 Efforts to support the creation of new affordable housing and reduce chronic homelessness are on track, but there is still lots of work to do, according to David Hickey, the minister responsible for the New Brunswick Housing Corporation. New data indicates progress has been made on three key government priorities related to Read More…

  • BJ Electric is now Bernie’s Electric Supplies Ltd

    BJ Electric is now Bernie’s Electric Supplies Ltd

    February 6, 2026 BJ Electric had been teasing a major announcement on their social media recently, before finally announcing last week they have rebranded as Bernie’s Electric Supplies Ltd, a nod to the company’s founder and legacy. “BJ Electric Supplies is now Bernie’s Electric Supplies—in honor of our founder, Bernard Joseph Thompson, and the values Read More…

  • The Government of Canada Introduces the Build Canada Homes Act

    The Government of Canada Introduces the Build Canada Homes Act

    February 6, 2026 The Government of Canada has introduced the Build Canada Homes Act, legislation that will establish Build Canada Homes as a Crown corporation whose mandate will be dedicated to building affordable housing in communities across the country. As Canada’s affordable housing builder, this legislation will equip Build Canada Homes with the necessary tools to Read More…