Guide to the Canadian Electrical Code, Part 1 – A Road Map: Section 56

EIN Bill Burr Code 400

February 3, 2022

By William (Bill) Burr

The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook**, but will hopefully provide some help in navigating the Code.

Section 56 — Optical fiber cables

Rule 56-000 states that Section 56 is a supplementary or amendatory section of the code and applies to the installation of optical fiber cables in conjunction with all other electrical systems.

Rule 56-002 provides a special terminology definition for an Optical Fiber Cable – a cable consisting of one or more optical fibers that transmits modulated light for the purpose of control, signalling or communications.

Rule 56-102 outlines that there are 3 types of optical fiber cables:

  • Non-conductive cables containing no metal other conductive materials.
  • Conductive cables containing non-current carrying conductive material such as strength member, metal vapour barriers or metal sheaths or shields, and,
  • Hybrid cables that contain both fiber optic and current carrying electrical conductors.

Rule 56-104 requires that optical fiber cables installed, within buildings, be approved types as listed in Table 19 and where installed outdoors be suitable for the location with respect to moisture, corrosive atmosphere, temperature, degree of enclosure and exposure to mechanical damage. Also note that OFNP, OFNR, OFNG, OFN, OFNH, OFCP, OFCR, OFCG, OFC, and OFCH have a minimum cable temperature rating of 60 °C. Where a cable is used in a greater temperature the rating must be marked on the cable.

Rule 56-106 states that, as per paragraph (a) in the Scope of the code, optical fiber installations, by a utility in its function as a utility, are not subject to inspection and acceptance by an inspector.

Rule 56-200 prohibits non-conductive optical fiber cables from occupying the same raceway, cabinet, panel, outlet box or similar enclosure with insulated conductors of electric lighting, power or Class I circuits, unless they are functionally associated, and the number and size of insulated conductors meet applicable requirements of the wiring method. For industrial establishments, where authorized persons supervise and maintain the installation, this prohibition may be waived.

Rule 56-202 permits conductive optical fiber cables to occupy the same raceway with conductors of a Class 2, communication or community antenna distribution and radio television circuits in accordance with Sections 16, 54, and 60. However, this rule prohibits conductive optical fiber cables occupying the same raceway, panel, cabinet or similar enclosure with lighting, power, or Class I circuits. Sub-clause (3) of this rule prohibits conductive optical fiber cables occupying the same cabinet, panel, outlet box, or similar enclosure housing the electrical terminals of a Class 2, communications, community antenna distribution, or radio and television circuit except where they are functionally associated, or factory assembled in the enclosure. In accordance with Section 10 all conductive non-current carrying parts of conductive optical cables shall be bonded to ground.

Rule 56-204 permits optical fiber cables to be incorporated in hybrid cables with electric lighting, power, or Class I circuits not exceeding 750 volts, or Class 2, communications, community antenna, or radio and television circuits conductors with associated functions. In every case, the hybrid cable is classed as per the type of insulated conductors in the cable and installed according to the rules for that type.

Rule 56-206 requires that where an optical fiber cable penetrates through a fire separation it shall be installed in accordance with Rule 2-128 to prevent fire spread.

Rule 56-208 requires optical fiber cables installed in a vertical shaft to be totally enclosed in non-combustible raceway unless they meet the flame spread requirements of the National Building Code of Canada or local building legislation for buildings of non-combustible construction (FT4). This requirement applies to hybrid cables, as well.

Rule 56-210 provides that optical fiber cables must not be installed in ducts or plenum chambers unless they meet the flame spread requirements of the National Building Code of Canada or local building legislation and the provision of Rule 12-010 – Wiring in ducts and plenum chambers.

Rule 56-212 requires that all raceways containing optical fiber cables must be installed in accordance with Section 12.

Rule 56-214 requires that where conductive optical fiber cables are exposed to lightning or accidental contact with lighting or power cables the metal parts must be bonded to ground at the point, as close as possible, to the point the cable enters the building. 

In the next installment, we will be discussing Section 58 — Passenger ropeways and similar equipment.

Source: CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727.

[1] William (Bill) Burr is an associate member of the Canadian Electrical Code, Part 1, Technical Committee and formerly Chair of the Canadian Advisory Council on Electrical Safety (CACES), Chief Electrical and Elevator Inspector for the Province of BC & the Northwest Territories, Director of Electrical and Gas Standards Development and Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com

Related Articles


Latest Articles

  • ESA 2025 Annual Licence Holder Meeting

    ESA 2025 Annual Licence Holder Meeting

    December 8, 2025 This year marked ESA’s 20th Annual Licence Holder Meeting — a milestone celebrating two decades of collaboration, innovation and safety leadership made possible by Ontario’s licence holder community. The meeting was held on Wednesday, November 26, 2025 Agenda Highlights Watch a recording of the 2025 Licence Holder Meeting. Read More…

  • BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    BC Hydro’s Updated Business Energy-Saving Incentives, Limited Time Bonus Offer

    December 8, 2025 Get funding from BC Hydro for businesses upgrading eligible equipment with energy-efficient models. Funding rates vary depending on the equipment being upgraded, with past participants receiving an average of 30% for upfront costs. Incentives are available for: Bonus offer BC Hydro is currently offering a 30% bonus incentive on all business energy-saving incentives projects… Read More…

  • Mastering Advanced Bidding Strategies in Electrical Contracting

    Mastering Advanced Bidding Strategies in Electrical Contracting

    December 1, 2025 By Melvin Newman, Patabid CEO & Ian Paterson, Patabid Client Success Manager and journeyman electrician with 30+ years of experience In the competitive world of electrical contracting, knowing how to estimate electrical jobs effectively can make the difference between winning profitable projects and watching opportunities slip away. For electrical contractors, mastering advanced… Read More…

  • Why Choosing the Right USB Charger Matters

    Why Choosing the Right USB Charger Matters

    December 1, 2025 Not all USB Chargers are Created Equal As the number of devices used daily increases, so does the need for a charger that delivers safe speeds and maximum charging potential. A high-quality USB charger delivers efficient charging without risk of damage, but the sea of USB chargers and outlets available on online… Read More…


Changing Scene

  • Modernizing Canada’s Energy Efficiency Act to Improve Affordability and Competitiveness

    Modernizing Canada’s Energy Efficiency Act to Improve Affordability and Competitiveness

    December 8, 2025 Amendments to modernize the Energy Efficiency Act have been introduced in the Senate. First passed in 1992, the Act aims to reduce the overall energy consumption of energy-using products and allow consumers to make informed purchasing decisions. Since 1995, Canadian households, businesses and industries have saved over $110 billion as a result of regulations… Read More…

  • B.C.’s Economy Shows Resilience Despite Global Trade Volatility

    B.C.’s Economy Shows Resilience Despite Global Trade Volatility

    December 8, 2025 B.C.’s economy is expected to grow at a measured pace despite instability and uncertainty in the global economy. “Unjust and unpredictable trade policies have upended global relationships and shaken investor confidence across the world,” said Brenda Bailey, Minister of Finance. “We’re leaning into our strengths, like our natural resources and our skilled… Read More…

  • BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    BC’s Bill 20 – The Construction Prompt Payment Act Receives Royal Assent

    December 8, 2025 As the BC Legislature wraps up the final week of the Fall session, BCCA is very pleased to see Bill 20 receive Royal Assent and officially become the Construction Prompt Payment Act, SBC 2025, c 24. This marks a significant milestone for BC’s construction sector. This achievement reflects decades of consistent, principled… Read More…

  • Federal Government Announces New Measures to Support Steel and Lumber

    Federal Government Announces New Measures to Support Steel and Lumber

    December 8, 2025 The world is changing rapidly. The United States, the world’s largest economy, is fundamentally reshaping all its trade relationships, causing major disruption and upheaval for Canadians. It is time to transform our economy from one that is reliant on a single trade partner to one that is stronger, more self-sufficient, and resilient… Read More…