The Centre Block at Parliament Hill is an iconic national symbol of Canada and the home of Canada’s Parliament. The Centre Block Rehabilitation will modernize the century-old building for future generations while preserving its heritage as the heart of Canadian democracy.

TWZ Group is the electrical contractor responsible for the temporary lighting on this complex restoration

project. TWZ Group Inc is a consortium of three electrical contractors, Ziebarth Electric, Wired Synergy and Toban Electric.

Committed to environmental sustainability and ensuring the best value for Canadians possible, the project team adopted LED Jobsite lighting throughout the project.

When compared to traditional bulb-based temporary lighting, LED Jobsite lighting reduces energy consumption by 65%. The project team is reducing the electrical consumption even further by implementing strict timing protocols to ensure non-essential lighting is turned off overnight.

Over the service-life of the lights, the energy usage is projected to be reduced by over 5.5 million kilowatt hours, which is equal to powering more than 2,700 homes per year.

The CO2 emissions will be reduced by more than 4,000 metric tons and is equivalent to removing 1,243 cars from the road.

EIN Lind CS 1

 

LED Jobsite lights require significantly less circuits, less maintenance, and are easier to install, relocate and uninstall. During the start of the restoration, the project team appreciated being able to increase efficiency while reducing the project’s carbon footprint.

 

EIN Jobsite CS 2

ON THE JOBSITE:

WASTE DIVERTED

An added environmental benefit is the significant amount of waste diverted from landfills because LED

Jobsite lights are a reusable asset and the modular cords are field serviceable. Also, CFL bulbs contain mercury and are considered hazardous waste. When moving to LED lights harmful toxins are no longer an issue.

FLEXIBILITY AND VERSATILITY

Centre Block is one of the most important buildings in Canada and the protection of its many heritage components is a critical concern for the construction team.

With a project of such complexity and scale, using a modular daisy-chain verses traditional cumbersome stringlights provides a greater level of flexibility to light the project.

LED Jobsite lights have enabled the project to hang less temporary lights, use less installation points, less circuits and less energy, all while also illuminating more space.

 

EIN Lind Case Study

www.ledjobsite.com

Related Articles


Latest Articles


Changing Scene

  • Federal Government Invests $1.2B to Build 84,500 EV Chargers by 2027

    Federal Government Invests $1.2B to Build 84,500 EV Chargers by 2027

    From mining, to manufacturing, to charging, Canadian businesses and workers are attracting historic investments in the electric vehicle (EV) supply chain. When electric vehicles are made from Canadian minerals, assembled by Canadian auto workers, and powered at Canadian-made chargers, we secure and create jobs, grow our economy, and keep our air clean now and into the future. Read More…

  • Applications Open for Nova Scotia Power’s 2023 Scholarship and Bursary Program 

    Applications Open for Nova Scotia Power’s 2023 Scholarship and Bursary Program 

    Applications are now open for Nova Scotia Power’s 2023 Scholarship and Bursary Program, and Nova Scotian students are encouraged to apply. The program is accepting applications until April 19, 2023. As part of its Diversity, Equity and Inclusion strategy, Nova Scotia Power is focused on supporting programs and initiatives that help remove barriers, advance DE&I education and awareness in Nova Scotian communities. Read More…

  • BCUC Approves Deferral Account for FortisBC’s Electric Vehicle Workplace and Fleet Charging Funding Program

    BCUC Approves Deferral Account for FortisBC’s Electric Vehicle Workplace and Fleet Charging Funding Program

    Recently, the British Columbia Utilities Commission (BCUC) approved FortisBC Inc.’s (FBC) application for a new deferral account to enable funding to organizations for the purchase and installation of Electric Vehicle (EV) charging infrastructure. Through FBC’s EV Workplace and Fleet Charging Funding Program, eligible organizations can request a one-time FBC funded contribution of $1,920 per Level 2 EV Charger, capped at seven chargers per site. Read More…

  • Parliamentary Secretary Julie Dabrusin Announces New EV Chargers in B.C. and New Single Window for ZEV Infrastructure Applications

    Parliamentary Secretary Julie Dabrusin Announces New EV Chargers in B.C. and New Single Window for ZEV Infrastructure Applications

    Reducing pollution from the transportation sector is critical to Canada achieving its climate targets. That’s why the Government of Canada is making it more affordable for Canadians to purchase, charge and drive electric vehicles (EV) across the country. Recently, Julie Dabrusin, Parliamentary Secretary to the Minister of Natural Resources and to the Minister of Environment and Climate Change, on behalf of the Honourable Jonathan Wilkinson, Minister of Natural Resources, launched a new, integrated, federal zero-emission vehicles (ZEV) infrastructure landing page. Read More…