Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles

  • STANDATA Bulletin Section 6 – Services and Service Equipment

    STANDATA Bulletin Section 6 – Services and Service Equipment

    July 27, 2026 The purpose of this STANDATA bulletin is to clarify Section 6 of the 2024 Canadian Electrical Code (CE Code), Part 1, which outlines the installation requirements for services, service equipment, and metering equipment. View the Bulletin: Read More…

  • Behind the Glow: How Neonview Helped Shape Vancouver’s Newest Landmark Roof

    Behind the Glow: How Neonview Helped Shape Vancouver’s Newest Landmark Roof

    July 27, 2026 Some projects are exciting because they’re new. Others are exciting because you can feel how many people had to be exceptionally good at their craft to make them look effortless. The PNE Amphitheatre (Freedom Mobile Arch) is the latter. The notable largest free-span wood roof in North American is the headline, but the lighting is the… Read More…

  • Canada Light Expo: Energy Efficient Lighting Solutions for Modern Businesses

    Canada Light Expo: Energy Efficient Lighting Solutions for Modern Businesses

    July 27, 2026 How Energy Efficient Lighting Can Help Modern Businesses Balance Profitability with Environmental Responsibility In today’s competitive business landscape, organizations are constantly seeking ways to reduce operational costs, improve sustainability, and foster productive work environments. Among the most impactful yet often overlooked areas of optimization is lighting. As businesses strive to balance profitability… Read More…

  • Stelpro Baseboard Heating: Reliable Comfort for Commercial & Residential Spaces

    Stelpro Baseboard Heating: Reliable Comfort for Commercial & Residential Spaces

    July 27, 2026 By EB Horsman & Son As temperatures rise and winter fades into the background, heating systems might not be top of mind. However, spring and summer are actually the ideal time to plan ahead. Installing or upgrading your heating system now can save time, reduce stress, and ensure you are fully prepared… Read More…


Changing Scene