EIN LA Flir casestudy 400Everyone knows that Thomas Alva Edison invented the lightbulb; but who invented the transformer - perhaps the most important electrical machine ever developed? The ZBD model alternating-current transformer was invented in 1885 at the Ganz Works in the Austro-Hungarian Empire by three Hungarian engineers: Karoly Zipernowsky, Otto Blathy and Miksa Deri (ZBD comes from the initials of their last names). Today, transformers are everywhere, feeding various voltages into our homes and businesses. When a transformer fails in a commercial or industrial environment, that failure can disrupt a significant portion of facility operations.

When commercial or industrial entities perform Criticality Assessment of their infrastructure assets, main transformers with power ratings of 500 KVA and above usually rank very high in the Risk Priority Number tables. With their high cost of replacement, long lead times of typically 12 weeks or more, high in/out swap costs and EIN LA Flir casestudy 2 400with many modes of failure impossible to repair onsite, transformers can become a weak link for reliability in an electrical distribution system. While an electrical distribution system that has been designed for redundancy, such as Main-Tie-Main configurations with each transformer loaded at less than 50% of nameplate capacity, can alleviate the impact of a failure, this is not the only consideration. Large amounts of fault energy are available, making some failure modes potentially hazardous to personnel. In addition, many transformers are oil filled, making flammability and environmental impacts additional considerations. It is much better to come up with ways to detect problems and prevent failures in the first place than to wait until failures occur to rectify them. A complete transformer failure can easily add up to tens of thousands of dollars in repair and downtime costs.

Fortunately, there are many types of Condition Based Maintenance (CBM) technologies that can be employed to catch the early warning signs of failure on transformers. Infrared inspection can detect loose connections, EIN LA Flir casestudy 3 400weak crimps and cable creepage due to thermal cycling. Contact ultrasound (also known as structure borne ultrasound) can detect loose windings and other mechanical issues. Airborne ultrasound can detect arcing, tracking, and corona, all of which emit high frequency signals in the ultrasound spectrum above 20 kHz. Ultraviolet (UV) cameras can be used to confirm the exact location of a corona event. Visual inspection can detect airborne contaminants, water ingress and pest ingress.

On oil filled transformers, periodic oil analysis can detect paper degradation, oil degradation, leaks and excessive acidity (insulation breakdown). Dissolved gas analysis of oil can further detect signs of thermal faults and partial discharge activity inside the transformer chamber. Finally, Transient Earth Voltage (TEV) detection, another form of partial discharge event, can find hidden defects inside the insulating components of a transformer.

Most of these CBM techniques require the equipment to be energized and operating under normal load conditions to provide useful quantitative data. Of course, this creates some safety considerations that must be accounted for, especially under the scrutiny of new guidelines embedded in the NFPA 70E 2018 edition. If any of these inspection tasks require opening the doors or covers of the transformer, then there is an elevated risk of an arc flash or electrocution to the personnel involved. Besides being qualified, workers must wear an appropriate level of Personal Protective Equipment (PPE) in accordance with the Arc Flash incident energy available. At the transformer, this arc flash risk can be significant and a barrier to performing the inspection and data collection tasks altogether. Furthermore, the Hierarchy of Control concept embedded in the NFPA 70E mandates that other alternatives to open panel work be deployed if possible and practical, including substitution of non-hazardous for hazardous tasks.

Fortunately, there are practical solutions that exist for virtually all these inspection types that substitute safer methods of data collection via a safety-by-design approach and the use of Electrical Maintenance Safety Devices (EMSD).

Maintenance Inspections Solutions, like those available from FLIR, can be installed on virtually any transformer and allow users to perform visual, infrared and ultraviolet inspections through a single device. Large format IRW-XPx rectangular windows mean that a single unit can be used for the LV connections and another for the HV connections on a transformer. While manipulating the cover of these types of windows, the equipment stays in a closed and guarded condition and the technician does not violate the restricted approach boundary so, per NFPA 70E Table 130.5 (C), they do not need to wear any special PPE as there is no increased likelihood of an Arc Flash occurrence.

Oil sampling ports can also be brought outside of the transformer cable compartment, with several vendors offering retrofit kits that permit safe sampling as well as providing an optional external pressure gauge and nitrogen insert to relieve vacuum. Of course, contact ultrasound and PD (TEV) detection are performed on the external skin of the equipment in a closed condition, and so no special Electrical Maintenance Safety Device (EMSD) is normally required for that type of inspection.

The optimum frequency of different inspection techniques is a function of the criticality of the assets in question. Following a cross functional team Failure Modes and Effects Analysis (FMEA) approach, each facility should attempt to classify their assets based on replacement cost, lead time, average repair cost, Mean Time to Repair (MTTR), potential safety impacts of failure, potential environmental impacts of failure, and cost of downtime for the asset. Assets are then classified as critical to the operation of the facility, important to the operation of the facility, or as support assets with limited impact to the facility, based on an agreed upon point system.

Table 1, below, provides a normal recommendation for inspection frequency for the different CBM technologies based on transformer asset criticality. 

It is imperative that data be collected and trended over time. For many of these measured parameters, a baseline can be set for "normal" operation shortly after the transformer goes into service. 

Flit table1 2

Assessments of asset health can only be made by collecting data at regular intervals and comparing long term trends. Again, the key parameters being collected for each inspection type are as follows:

Infrared

  • Temperature at booted connections
  • Temperature at crimped connections
  • Temperature at bolted connections
  • Oil tank temperature scan (for hot and cold spots indicating possible problems)
  • Load tap changer tank temperature differential to main tank

Visual

  • Dust ingress, water ingress, pest ingress
  • Water stains from previously standing water
  • Corrosion
  • Visual signs of partial discharge (if detected by other CBM techniques)
  • Fan operation
  • Oil leakage
  • Soiled bushings

Airborne Ultrasound

  • Decibel values at pre-determined test points
  • Analysis of waveform (time and frequency domain analysis) to determine nature of PD

Structure Borne Ultrasound

  • Decibel values at defined test points
  • Waveform analysis for fault type determination

TEV (Partial Discharge)

  • Decibel values at pre-determined test points
  • Phase-resolved partial discharge plots (comparative analysis for trends)

Oil Sampling

  • Oil pressure (gauge reading)
  • Oil temperature (gauge reading)
  • Oil quality (acidity, moisture content, dielectric properties) dissolved gas levels (ppm) including atmospheric gases, oxides of carbon, hydrocarbons and hydrogen

To summarize, the use of EMSD like Maintenance Inspection Windows and external Oil Sampling ports on transformers can take the danger out of the CBM data collection tasks and eliminate the need for energized open panel work. With the risks eliminated, the inspection becomes possible with a single technician with no cumbersome arc flash PPE required - meaning the data collection can be done much more efficiently as well. With increased inspection frequency, the potential problems that lead to unexpected failures of transformers can be detected earlier and preventative intervention can be initiated. Not only does this ensure compliance with NFPA 70E guidelines, but it also makes economic sense to monitor and protect your critical transformer assets. Experience has shown that transformer protection by fuses alone is not adequate to prevent fires in the event of a short circuit. The key is to prevent the possible causes of a short circuit by detecting the early warning signs with CBM techniques.

Changing Scene

  • Prev
The Ontario government is introducing new measures to help tradespeople get their certification ...
This ECAA Annual Training Day & AGM hybrid event will take place May 27th – May 29th. ...
Technical Safety BC has reviewed the 2021 Canadian Electrical Code (CE Code) to assess the impacts ...
The Government of Canada is providing close to $5 million, over five years, to the National ...
Applications are now open online for the Increased Employment Incentive (IEI), which ...
As a non-profit organization, Skills Ontario relies on the support of partners to continue ...
Ideal Supply is proud to announce that as of January 1, 2021 they have appointed a new Sales ...
The energy storage ecosystem and the regulatory environment in which it operates are evolving ...
It's April, which means it's time for you to ignite your competitive spark with the a new challenge ...
MP Scott Duvall has introduced an amendment to the Income Tax Act regarding travel expenses for ...


 

www.liteline.com

 

 

 

 


 

Canadian Electrical Contractor Discussion Group: Can You Count the Deficiencies?

EIN CECD 400Have you ever been called to fix the work of a 'handyman'?

"Was supposedly done by a"certified ' electrician....told the homeowner that he got a $266 permit....no record at TSBC. Can you count the deficiencies?"

"There is a second panel change in the triplex also.......even more deficiencies. Think the guy was a glorified handyman. Ones not obvious: 240 BB heat hooked up 120....drier on 2p20....range on 2p50....water heater fed with 2c14 Bx on 2p15."

Go HERE to join the discussion

 


 

Ideal's Stay Wired to WinIt's April, which means it's time for you to ignite your competitive spark with the a new challenge from IDEAL Nationals Canada. This month, IDEAL is asking you to show off your electrical knowledge with the most correct answers.

Five professionals and five apprentice winners will each take home a $100 VISA gift card and forged wire stripper from IDEAL.

 

 

 

 

Read More


 



William (Bill) BurrBy William (Bill) Burr

Section 32 – Fire Alarm Systems, Smoke and Carbon Monoxide Alarms, and Fire Pumps, as outlined in Rule 32-000 Scope, is a supplementary or amendatory section of the code and provides additional and specific requirements for the location, installation, wiring, and protection, of

• local fire alarm systems

• permanently connected smoke and carbon monoxide alarms...

Read More


 

LumenpulseBy Matthew Payette

A lighting programming and control narrative is a document that is essential to coordinate the design/construction process with a fully realized final architectural product. It defines how lighting will integrate into the space and ultimately how humans will interact with that same space.

Sometimes there is a gap between the initial visions of the designers and the final product. Other times, the final product and operation of the lighting systems is achieved but after much project management distress...

Read More


 

Product News

  • Prev
MaxLite introduces the next generation of WallMax Open Face LED Wall Packs with field-selectable ...
Gotham has released its Incito™ 4” Direct-Indirect Wall Mount Cylinder luminaire. The new cylinder ...
Arlington's low cot MC cable fittings in a variety of sizes, are super convenient and ...
The Boca Flasher’s NanoLume has a streamline profile. It is a line voltage fixture perfect for Cove ...
120V AC Model, 24V DC Model, Model LB4R, cULus Listed. Type IC Rated – Approved for Direct Contact ...
 Available in Visual Comfort or Discrete optics configurations. Lumen packages from 1,600 to ...
For direct wire applications only. Consult factory for junction box sold separately. Aluminum cast ...
INFINA® DL-AC-FLEX2 is the next generation of high lumen output, specification grade, a flexible ...
Traditional in appearance, not in innovation. From below the ceiling, the Juno Podz take ...
The SLM is an ultra-slim, modern LED panel featuring edge-lit design for impressive visual comfort ...

 

11 Piece Insulated TorqueVario-S and SlimLine Blade Set• Individually tested to 10,000 volts AC and rated to 1,000 volts AC for safety and peace of mind.

• Meets VDE testing standards for protection against arc flash explosion.

• Torque accuracy of +/- 6% for confidence in precise tolerances.

• 33% narrower blade shafts for reaching deep set terminal block fasteners.

• Direct-molded insulation for protection against electrical shock and arc flash explosion.

Read More


 

 

FLIR TZ20 Dual Thermal Camera Drone PayloadPlug-and-Play Gimbal System for the DJI Matrice 200 Series and Matrice 300 Offers High-Definition FLIR Thermal Imaging with Zoom Capabilities to Improve Situational Awareness.

The FLIR Vue® TZ20, the first high resolution, dual thermal sensor gimbal purpose-built for the DJI®Matrice 200 Series and Matrice 300 airframes is now available in Canada. Featuring both a narrow-field-of-view and a wide-field-of-view 640x512 resolution FLIR Boson®thermal camera module, the Vue TZ20 offers greater situational awareness with a 20-times digital thermal zoom capability to complete public safety and industrial inspection missions both near and far. 

Read More


 

 

Autodesk TakeoffAutodesk, Inc. has announced the worldwide availability of Autodesk Takeoff, a new product that empowers estimators to perform 2D and 3D quantification workflows from a common data environment to increase collaboration, speed and accuracy during the estimation process.

Originally announced at Autodesk University in November 2020, Autodesk Takeoff will join Autodesk Build and Autodesk BIM Collaborate as part of the Autodesk Construction Cloud unified platform. The announcement comes one month after Autodesk Build and Autodesk BIM Collaborate were made available globally for Autodesk Construction Cloud customers. 

Read More


 

Peers & Profiles

  • Prev
Kyle Manfredi is the owner of ARK Electrical alongside his wife, Shannon. Operating out of ...
Like most major events over the last year, the COVID-19 pandemic put serious restrictions on the ...
This past December Jennifer Green was honoured with Canada’s Most Powerful Women Top 100 Award for ...
“It was quite surprising,” said Stephanie Smith of being named EHRC’s Leader of the Year. ...
As an advanced networked lighting controls company serving the industrial and large commercial ...
Trilliant, an international provider of utility solutions for advanced metering and smart grid ...
For more than a century, ABB has been investing in Canadian technologies and products to support ...
Mackenzie Gillan, a bright young lady from Baysville, Ontario, tells us about how she learned ...
Energy Efficient Lighting is a LED lighting manufacturer with nearly 30 years of industry ...
Dee Durant is an industrial electrician apprentice attending Conestoga College and an Ambassador ...


EIN Green 100 400

By Blake Marchand

This past December Jennifer Green was honoured with Canada’s Most Powerful Women Top 100 Award for the Skilled Trades category by WXN (Women’s Executive Network).

“It is truly an honour to be recognized by WXN and to be among this group of amazing women,” said Green of earning the distinction. “Throughout my career, I’ve worked with many great mentors and team members – to them, I say thank you for always inspiring me. I am absolutely thrilled.” Green is an industrial mechanic millwright by trade and works with Skills Ontario as Director of Competitions and Young Women’s Initiatives. 

Read More


 

Jo Istanbul Four Seasons ABy Owen Hurst

Recently, Electrical Industry Canada has developed a relationship with Women in Renewable Energy (WiRE), a non-for-profit group developing resources and networking potential for women and all working or planning to work within the renewable energy sector. Aside from being the WiRE President & CEO, Joanna Osawe is the Global Business Development Manager of Major Projects for DMC Power Inc.

EIN sat down with Osawe to learn more about WiRE and the substantial benefits it provides. Joanna is very personable and open regarding her career and her ambition, as well as the opportunities she is developing for women nationally and globally. 

Read More


 

Copper $US Dollar price per pound

Kerrwil Publications Great Place to Work. Certified December 2019 - December 2020

538 Elizabeth Street, Midland,Ontario, Canada L4R2A3 +1 705 527 7666
©2021 All rights reserved

Use of this Site constitutes acceptance of our Privacy Policy (effective 1.1.2016)
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of Kerrwil