Whitepaper: Achieving Electrical Safety By Design

EIN Littelfuse Safety 400

July 14, 2021

All workers, regardless of age, need to be reminded that while Personal Protective Equipment (PPE) is essential, it is the last line of defense in an electrical hazard. The ANSI Z10/CSA Z1000 Occupational Health and Safety risk control hierarchy lists PPE as the least effective safeguard for arc-flash risk. By far the best approach is to design safety into the plant’s electrical system from the start. Cost is often an obstacle to implementing engineering controls to mitigate risk, but electrical incidents have a huge impact on a plant’s bottom line both directly and indirectly. OSHA estimates the average electric shock injury costs an employer over $180,000. Furthermore, the American Society of Safety Engineers (ASSE) reports that Liberty Mutual polled executives and learned that for every $1.00 spent on workplace safety, they saw a return of $3.00. Safety is a good investment.

Know the Points in Your Electrical System Where Safety Can Be Designed-In

This white paper discusses implementing the higher levels of the hierarchy of controls, moving beyond PPE and reducing both the risk and incidence of electrical hazards and components that can be designed into an electrical system to make it safer. The Hierarchy of Controls (Figure 1) is an accepted evaluation of risk mitigation and we will reference it throughout this paper to understand the components that are effective at each level to design in electrical safety.

HierarchyControls

Consider a maintenance worker diagnosing a motor stoppage. They may need to enter an energized panel to determine the cause of the motor trip, exposing them to risk of shock or even arc flash. One way of mitigating that risk is PPE: the worker could wear gloves and arc-resistant clothing. However, as we move up the hierarchy, it is important to note that without Administrative Controls requiring the PPE, ensuring the PPE is in good condition, and detailing the PPE category for the arc hazard, the worker may not use PPE at all or would be at risk of inadequate PPE for the situation. Further Administrative Controls might prohibit working while energized and utilize lock-out, tag-out (LOTO) to prevent re-energizing during maintenance.

Go HERE for the full whitepaper

 

Related Articles


Latest Articles


Changing Scene

  • Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    Hammond Power Solutions Appoints Linda Nadeau Sanford as Western Regional Sales Manager

    May 12, 2025 Hammond Power Solutions (HPS), a leader in dry-type transformers and power quality solutions, is pleased to announce the appointment of Linda Nadeau Sanford as the new Western Regional Sales Manager. Linda will play a key part in driving sales and revenue across the Western Canada region. She will oversee territory management, advance… Read More…

  • Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    Susanna Zagar, Ontario Energy Board CEO, Named EHRC’s 2025 Agent of Change

    May 12, 2025 Electricity Human Resources Canada (EHRC) is proud to announce Susanna Zagar (she/her), Chief Executive Officer of the Ontario Energy Board (OEB), as the recipient of the 2025 Agent of Change Award. This recognition celebrates Ms. Zagar’s remarkable leadership and commitment to diversity, equity and inclusion (DEI) in the electricity sector. Since stepping… Read More…

  • AD Reports Huge Jump in Member Sales Through Three Months of 2025

    AD Reports Huge Jump in Member Sales Through Three Months of 2025

    May 12, 2025 AD reports that member sales in the first three months of 2025 increased 23% to a record $24 billion across the group’s 14 divisions and three countries. AD welcomed over 550 new members in the first quarter through both organic growth and the IMARK Electrical merger. AD members also acquired another 10… Read More…

  • Legrand Introduces Wattstopper i3 Building Management Platform

    Legrand Introduces Wattstopper i3 Building Management Platform

    May 12, 2025 Legrand® has announced the launch of the Wattstopper i3 Platform, a next-generation lighting and building intelligence solution powered by KODE Labs, a global leader of advanced smart building technology.  The partnership positions Legrand to lead the lighting controls industry into a new era of unified experiences, seamless integrations, and data-driven control, making it easier… Read More…