SPI Systems LCS 2-X-2 Relay Processing Panel

SPI Systems

December 7, 2017

The LCS 2-X-2 is a computerized lighting control systems utilizing microprocessor technology. The LCS 2-X-2 offers effective control of the energy consumption in large and small buildings. The LCS 2-X-2 system is designed for standalone operation, which is programmed through the LCD display on the CPU Board for smaller applications and in a network for larger more complex applications.

The LCS 2-X-2 control system central component is the Relay Processing Panel (RPP). The RPP is capable of supporting 32 inputs (e.g., switches) and 32 relay drivers each capable of driving 2 relays. The output relay design accommodates Panasonic HID lighting relays. Inputs are powered by the RPP therefore, no external power is required.  The inputs accommodate contact closure devices such as switches and motion detectors. The LCS 2-X-2 product line includes momentary contact lighting switches. Each switch has a Dual color LED for on/off status, which is powered by the RPP.

The RPP is designed for flexibility in configuring the inputs and outputs. Output relays can be programmed separately or programmed to “follow” a relay. Inputs are programmable to control multiple output relays. As a network, all inputs and outputs are addressable and programmable from any RPP. Creating a seamless network of panels. Programming is accessible through an RPP (LCD Display), or a laptop plug-in, or a networked PC, or modem. This system’s features include an optional modem connection for off site control, monitoring and troubleshooting.

The scheduling function features a 9-day format. Days 1 to 7 are defined as Monday to Sunday and days 8 and 9 as Holiday schedules. Each day schedule can perform 10 “on” and 10 “off” commands. Every output relay has 9 day scheduling capability.

Scheduled “off” commands can activate a “flicker warning” feature. The “flicker warning” will alert the occupants that the lights are scheduled to turn off. This allows the occupants time to override the “off” command using a wall mounted switch. The zones controlled by the switch are fully programmable. The extended occupancy time can range from 1 minute to 2 hours.

Features

  • Standalone or networked micorprocessor based lighting control panel
  • Up to 24 relays in 16 zones – Panasonic HID
  • Relay “follow” programming
  • 9 day per week schedules (2 holidays)
  • 10 “on” & 10 “off” commands per day
  • Occupants “after hours” override switch programmable up to 2 hours.
  • Input switch configuration – 2 wires (no indicators) or 4 wires (LED indicators)
  • Bi-Color LED switch indicator – red and green
  • Input quick connection – spade connector
  • Space saving size – 23″ wide x 34″ high
  • Network capability with no additional hardware
  • Non-volatile memory
  • Central control – upload/download system parameters
  • Sequential on/off control circuits to avoid load demands

Related Articles


Latest Articles

  • Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    Celebrating 30 Years of Innovation and Collaboration at EFC’s 2025 Conference in Niagara

    By Luc Rodier, Chair of the Board of Electro-Federation Canada (EFC) The 2025 EFC Conference in Niagara was a landmark occasion—marking 30 years of innovation, collaboration, and collective progress in the Canadian electrical industry. Set against the symbolic backdrop of the Canadian-U.S. border, this year’s theme, Electrifying Connections, couldn’t have been more fitting. As President and… Read More…

  • Industrial Wiring Devices: A Brief Intro and How to Choose Them

    Industrial Wiring Devices: A Brief Intro and How to Choose Them

    June 9, 2025 Introduction: With the multitude of options on the market, it can be difficult to decide whether you need a pin and sleeve wiring device or a plug and connector in your industrial plant or facility. You might find your head swirling with thoughts about which option is best. Or you may not… Read More…

  • Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    Industry Leaders Head to Quebec to Strengthen Energy and Supply Chain Resilience

    June 9, 2025 By Electro-Federation Canada On June 3 and 4, a high-level delegation from Canada’s electrical and automation sector travelled to Montreal and Quebec City for a series of strategic meetings with Quebec government officials and key stakeholders. Organized by Electro-Federation Canada (EFC), this mission underscores the critical role the industry plays in advancing… Read More…

  • Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    Electrifying Connections: A Celebration of Legacy, A Vision for the Future

    June 9, 2025 By Electro-Federation Canada This year’s Annual Industry Conference, held against the breathtaking backdrop of Niagara Falls, Ontario, was a landmark event with more than 710 Electro-Federation Canada community members. More than just a celebration of our shared history, it was a launchpad for new ideas, future-based dialogue, and deeper connections.   The energy and… Read More…


Changing Scene