Eaton Power Delivery USB Receptacle

April 8, 2024

The USB Power Delivery (USB PD) is a fast-charging technology based on the USB-C standard. It utilizes its high power output and an adjustable voltage supply to optimize charging based on your device’s consumption needs. Whether you are charging your headphones or a laptop, the USB PD, can safely and quickly recharge your device’s battery.

Standard USB devices (non-power delivery) use constant voltage (5V) to charge your device. Current is the only variable in this situation (1-5 Amps typically) so it makes sense to rate these devices in Amps.

Eaton Power Delivery USB Receptacle

A USB PD enabled device however, can provide different voltages (5V-20V) based on the capacity and charging profile of your device. It can also vary its current similar to a standard USB device. As a result, it makes more sense to measure the charging capability of a USB PD device in Watts vs. Amps.

Rating the device in Watts also helps better correlate with power supplies of larger devices such as laptops.

Go HERE for more information

Source

Related Articles


Latest Articles

  • Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    Capital Constraints in Owner-Operated Trade Businesses – When Owning the Building Quietly Limits Growth 

    For many contractor-owned businesses, growth starts to feel harder than it should. The work is there. Customers are steady. Crews are busy. Yet when owners look to expand, invest, or create breathing room, capital often feels tighter than expected. In many cases, the issue is not operations or demand. It is a real estate decision made years… Read More…

  • What 2025 Revealed About Canada’s Electrical Industry

    What 2025 Revealed About Canada’s Electrical Industry

    December 16, 2025 By Carol McGlogan, President & CEO, Electro-Federation Canada The past year required Canada’s electrical industry to adapt to a rapidly changing environment. In 2025, businesses across the value chain navigated shifting trade conditions, evolving policy landscapes, and growing expectations tied to electrification and infrastructure expansion. Trade uncertainty introduced new complexity. Organizations reassessed Read More…

  • Considerations for EV Charging Installation and Site Preparation

    Considerations for EV Charging Installation and Site Preparation

    December 15, 2025 By Blake Marchand As part of our recent discussion with LEDVANCE EVSE Product Manager, Erich Bockley, he emphasized the importance of site preparation Site preparation can be the most complicated part of the project, Bockley emphasized, a lot needs to be considered before the installation work begins. Many public charging applications will Read More…

  • Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    Ontario’s Multi-Family Component Leads Residential Sector Increases in October Building Permits

    December 15, 2025 In October, the total value of building permits issued in Canada rose $1.8 billion (+14.9%) to $13.8 billion. The increase in construction intentions was led by the residential sector (+$1.1 billion). An increase was also observed in the non-residential sector (+$702.8 million). On a constant dollar basis (2023=100), the total value of building permits issued in Read More…


Changing Scene