Lockout Failure Kills One Worker, Injures Another

Electrical Lockout

A general contracting firm and two supervisors have been fined a combined $133,000 after a lockout incident in which one worker died and the other sustained injuries.Lockout is a means of preventing power from being applied to equipment, ensuring it cannot be set in motion.

The two workers, employed by a sub-contractor, were insulating an overhead water pipe in a Toronto Transit Commission (TTC) garage in Concord, ON. It was their first day on the job. The general contracting firm had two site superintendents supervising the project.

The workers were working from a scissor lift — a self-propelled elevating work platform. When an electric eye triggered a partially lowered overhead garage door to open, the door knocked the scissor lift over, causing both workers to fall 20 feet to the concrete floor below.

Here’s what went wrong:

• the two workers disregarded instructions from the supervisors to stay away from the raised overhead door, which was preventing them from insulating the section of pipe passing above it. One of the supervisors had told them that only TTC personnel could operate mechanical equipment, and that he would make arrangements with the designated TTC inspector. Eventually the workers asked a TTC worker to lower it part way.
• the TTC worker did not follow TTC lockout procedures, neither locking out the controls to the door nor consultingthe designated TTC inspector about lowering or locking it out.
• A few minutes after the scissor lift was moved into a position behind the partially lowered door, anotherTTC employee pushed a cart through the open doorway, which triggered an electric eye that caused the door to raise. The door knocked the lift over as it rolled along an overhead track.

This incident highlights the importance of
• ongoing supervision, especially when dealing with new workers and in an unfamiliar workplace
• strict adherence to all safety policies and procedures

The general contracting firm was fined $125,000. The firm’s two supervisors were fined $4,000 each.

Follow these lockout principles
Ontario’s Ministry of Labour advises employers, supervisors and workers to follow accepted lockout principles, including:
• pre-planning for the lockout by identifying all energy sources, switches, etc.
• where lockout is complex, preparing in checklist form a written sequence for equipment access, lockout/tagout, clearance, release, and start-up
• notifying all workers affected by the lockout
• shutting down equipment by normal means, e.g.,turning switches, closing valves…
• isolating equipment from energy sources by disconnecting or blocking the sources of energy
• lockingout and tagging the energy isolating devices by padlock or some other locking device that the worker has control over as well as a tag indicating that the equipment has been shut down
• verifying that all energy sources have been isolated by attempting to cycle the equipment prior to working on it
• releasing equipment from lockout when work is completed
• testing equipment

 

Related Articles


Latest Articles

  • ESA Provides an Update on its New Self-Serve Licensing Platform

    ESA Provides an Update on its New Self-Serve Licensing Platform

    March 27, 2026 In October 2025 Electrical Safety Authority (ESA) officially launched its new self-serve licensing platform, a modern system designed to transform how Master Electricians (MEs) and Licensed Electrical Contractors (LECs) manage their licensing needs. The platform replaces paper-based processes and provides a centralized, web-based experience for renewing and applying for licences, paying fees Read More…

  • BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    BC Updates to Solar and Battery Rebate Program Come into Effect April/June 2026

    March 27, 2026 Starting April 1, 2026, our battery rebate offer is changing. The offer will include: Applications submitted before April 1, 2026, will be reviewed under the current rebate amounts. New requirement for working with contractors Beginning June 1, 2026, solar and battery installations must be completed by a Home Performance Contractor Network (HPCN) member to Read More…

  • CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    CSA Report: Online Sales of Unapproved Consumer Electrical Products in Canada

    March 27, 2026 Canadian electrical regulators have identified that the online sales of unapproved consumer electrical products are of a serious concern, and with the growing number of online marketplaces globally there is likely a higher volume of unapproved, or non-compliant, consumer electrical products available for purchase to Canadian consumers. In 2025, Canadian Standards Association Read More…

  • Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    Tackling Unsafe Electrical Products Sold Online: Key Outcomes from the National Workshop Agreement 

    March 27, 2026 By Electro-Federation Canada The rapid growth of e-commerce has transformed how Canadians purchase electrical products, but it has also introduced new safety risks. EFC members have been raising concerns for several years about the increasing availability of unsafe and unapproved electrical products sold online, often without clear evidence of certification or compliance with Canadian requirements. To Read More…


Changing Scene

  • Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    Skills Ontario Supports Critical Skilled Trades Investment in the 2026 Ontario Budget

    March 27, 2026 — Skills Ontario welcomes the 2026 Ontario Budget: A Plan to Protect Ontario, released today by the Ontario Government and Minister of Finance Peter Bethlenfalvy, and applauds the continued commitment to investing in skilled trades, technologies, and workforce development. Skills Ontario was pleased to see the government maintain and strengthen its support Read More…

  • Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    Toronto Hydro Launches New Pilot Program to Help Multiplex Builders Energize

    April 27, 2026 Toronto Hydro is launching a trailblazing customer pilot project designed to help local builders electrify multiplex housing without complex service upgrades. Through Toronto Hydro’s Multiplex PowerPlay, up to six multiplex projects can qualify to receive funding toward a smart energy load management system. Smart load management systems continuously monitor total building energy Read More…

  • Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    Gescan and George Gordon Developments Strengthen Community Impact in Saskatchewan

    March 25, 2026 Gescan, a Sonepar Company, is proud to highlight its continued commitment to supporting communities across Saskatchewan through their meaningful alliance with George Gordon Developments Ltd. (GGDL). With a strong focus on community development, workforce participation and inclusive growth, Gescan is working closely with GGDL to create training, employment and business opportunities for Saskatchewan residents. These efforts are particularly focused on supporting individuals Read More…

  • Electric Avenue Launches Incentive Program for EV Charging Installers

    Electric Avenue Launches Incentive Program for EV Charging Installers

    March 23, 2026 Halifax-based EV charging solutions provider Electric Avenue has announced the official launch of its new Contractor Incentive Program, a first-of-its-kind initiative in the EV charging industry, built exclusively for contractors who have completed the company’s Installer Certification course. The program rewards certified installers for every verified and networked installation they complete, offering cash Read More…