In November and December 2016, Ontario Ministry of Labour inspectors conducted an enforcement blitz involving electrical and related hazards at construction sites. According to just released results, inspectors conducted 1,108 field visits to 998 workplaces, and issued 2,801 orders, including 173 stop work orders. The number of orders averaged 2.8 per visit. A breakdown of the results shows that electrical hazards are just some of the risks electrical workers face on construction sites.

What inspectors were looking for

The inspectors focused on electrical hazards as well as other hazards around electrical work, such as falls as a result of the unsafe use of ladders, and ergonomics-related hazards involving specific tasks that could lead to musculoskeletal disorders (MSDs)

Among their priorities, inspectors checked that

• only qualified workers (electricians certified by the Ontario College of Trades) were permitted to connect, maintain or modify electrical equipment or installations

• qualified workers were not working on live electrical equipment unless permitted. In addition, inspectors checked that a procedure was in place to de-energize electrical systems at the source and use lockout procedures to prevent re-energizing while workers worked on or near electrical equipment, installations or systems

• employers had developed and implemented safe work procedures that workers followed when working on or near electrical equipment, installations and distribution systems

• trained signal persons were provided to assist vehicle and equipment operators who were working near energized overhead electrical conductors to prevent part of the vehicle or equipment (cranes, dump trucks), or their load, from encroaching on the minimum distance permitted under the Section 188 of the Regulations for Construction Projects

• visible signage was posted to warn workers and operators of potential overhead electrical hazards

• prior to excavating, electrical and other services in and near the area to be excavated were located and marked and, if the service posed a hazard during excavating, the service was shut off by the utility owner

• workers were using ladders in a safe manner

Hazards related to stop work orders

Stop work orders are issued when a situation could post an immediate hazard/danger to a worker. During the blitz, 173 stop work orders were issued under the Occupational Health and Safety Act. They were accompanied by 287 other orders requiring a specific activity to take place to remedy the issue involving the stop work orders.

Of the violations related to the stop work orders,

• 23% were related to fall protection involving missing or inadequate guardrails
• 17% were related to scaffolds and scaffold platforms
• 13% were related to access of stairs or temporary stairs five% (15 of the 287 accompanying orders) were related to equipment in general
• 5% were related to general “housekeeping”
• 3% were related to electrical hazards
• 3% were related to excavations and wall stability

The goals of the blitz were to raise awareness of safety hazards when working near live electrical power lines and electrical equipment, ensure workplace parties were complying with the law, and prevent injuries that could arise from unsafe work practices.

Read the blitz report: www.labour.gov.on.ca/english/hs/sawo/blitzes/blitz_report84.php
Image courtesy of artur84 at FreeDigitalPhotos.net.

 

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…