5 Dumb Things Smart People Do When Testing Electricity

Safety Fluke

 

Oct 23, 2017

People who make their living by working with electricity quickly develop a healthy respect for anything with even a remote chance of being “live.” Yet the pressures of the getting a job done on time or getting a mission-critical piece of equipment back on line can result in carelessness and uncharacteristic mistakes by even the most seasoned electrician. Here in Part 1 are the first five of 10 quick reminders of what not to do when taking electrical measurements.

 

 

 

 

DO NOT:

1. Replace the original fuse with a cheaper one. Digital multimeters (DMMs) that meet today’s safety standards include a special high-energy fuse designed to pop before an over- load hits your hand. Fluke meters use a special sand-filled fuse designed to extinguish an arc within the fuse enclosure. Be sure to replace it with the same kind of authorized fuse.

2. Use a bit of wire or metal to get around the fuse. That may seem like a quick fix if you’re caught without an extra fuse, but it won’t provide protection against a spike headed your way.

3. Use the wrong test tool for the job. Make sure your test tool holds the correct CAT rating for each job you do, even if it means switching DMMs throughout the day (see Table, below).

4). Grab the cheapest DMM on the rack. If that cheap test tool doesn’t actually have the safety features it advertised, you could end up a victim of a safety incident. Look for independent laboratory testing markings like CSA or UL that ensure the tool meets standards.

5. Skip out on PPE. They’re called “safety” glasses for a reason. Take them out and put them on. The same goes for insulated tools, insulated gloves, ear plugs, your face shield/hood, and arc-resistant clothing.

This article was first published by Fluke Corporation; http://content.fluke.com/platforms/wpcf/downloads/10_common_mistakes_EN.pdf. Watch for the five remaining safety don’ts in the March 21 issue of EIN.

Table: Measurement Categories IAW IEC/EN 61010-031

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…