To claim an LED lumen maintenance value for a product submission, partners must upload the following supporting documentation for verification:

1) ISTMT report in PDF form with LED drive current (if measured) and ambient temperature included in the report. Laboratory policies for ISTMT are detailed below.

2) LM-80 report in PDF form for each LED light source used in the lamp or luminaire. Laboratory policies for LM-80 measurements are detailed below.

3) Saved copy of completed Energy Star TM-21 Calculator in a Microsoft Excel file format. Save the file, using the model number being submitted to LED Lighting Facts in the filename, before uploading with other supporting documentation.

4) Specification sheet for the lamp or luminaire in PDF form with the following information disclosed:

a. The manufacturer (OEM or private labeller) organization name and brand. Organization name and brand in the specification sheet will not affect the verification process. Organization name and brand must match the LM-79 and ISTMT reports.

b. Product model number matching test report and LED Lighting Facts submission. Ordering code for a product family is acceptable if the model number in the test report and LED Lighting Facts submission is included.

c. Image or technical drawing of the product.

d. Nominal rated (or tested) initial wattage.

e. Nominal rated (or tested) initial light output.

f. Driver characteristics or compatible drivers.

g. Contact information for the organization listed in the specification sheet.

 h. Indication of warranty (if applicable).

i. Indication of variable drive current controls to maintain light output and/or colour over time (if applicable). Maximum possible increase above nominal initial wattage over the service life of the product (expressed in watts) should then be included.

This article was first published online by LED Lighting Facts

Image source: Rensselaer Polytechnic Institute’s Lighting Research Center

* LED Lighting Facts encourages partners to supply as much performance data as possible. Tested case temperatures 2 & 3 are optional; however, submitting at least two case temperatures is highly recommended. If data from only one LM-80 tested case temperature is entered and the product’s tested case temperature is higher, a partner may not claim LED lumen maintenance. If the product’s tested case temperature is lower than the LM-80 tested case temperature, Tested case temperature 1 data will be used.

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…