To Label or Not to Label: Circuit Labeling of Modular, Manufactured Wiring Systems

EIN Cii logo 400

April 29, 2020

By Jon Dumbauld – President, Communications Integrators, Inc

From time to time a request is made, typically by an installing electrical contractor, to label some or all the components of a modular wiring system with the circuit ID before shipping to the job site. The request for circuit ID typically applies to home run cable conductors, power distribution modules, (PDM) and access floor boxes, (AFB). Although circuit ID labeling may be standard practice for conventional “pipe & wire” electrical installations, modular plug-n-play wiring systems can be more beneficial over the practice of pre-labeling system components with circuit IDs before they are shipped to and installed at a job site. There are primarily three reasons manufacturers advocate against pre-labeling system components with the to-be-installed circuit IDs. Pre-labeled components:

  1. Increase installation time and complexity by untold orders of magnitude
  2. Increase system management challenges
  3. Decrease system safety

Increased Installation Time and ComplexityCii Power Distribution Module

On a typical system installation with unlabeled system components, the installation crew simply places all system components as they are shown on the system layout drawings provided by the manufacturer. For instance, in a relatively small project of 100 workstations, the installation crew would place the 100 AFBs and perhaps 10 PDMs at their designated locations as shown on the layout drawings, interconnect the components with the appropriate length plug-n-play whips as designated on the layout drawings, and tie the home run cables’ conductors, by phase, into electrical panels and the installation is essentially done.

Nearly all of the simplicity and labor savings designed into the plug-n-play installation described above does not apply with a pre-labeled system. Now, instead of simply placing 100 AFBs at any of the 100 designated locations of the layout drawings, the installation crew must search through all 100 floor boxes to find the one specific floor box that has the correct circuit ID label that matches the circuit designation recorded on the layout drawings for a specific AFB location. This same tedious and error-prone process is then repeated another 99 times, just to place the pre-labeled floor boxes in their proper locations. Repeat this process again for the 10 PDMs. Finally, instead of simply tying the Cii Access Floor Boxconductors of the home run cables to the appropriate breaker panel by phase, the electrician must find and land every uniquely labeled phase conductor to its designated breaker location in the panel. Now, imagine the multiplied time wasted, installer frustration, and potential for error on a project of 300 or 500 or more workstations.

Increased System Management Challenges

A modular wiring system is designed and built to facilitate the easy relocation of the system components, minimizing the impact of work environment churn on the business. In the event the components of the modular wiring system have been labeled with the as-installed circuit IDs, any and every relocation of these components (the AFBs in particular) will necessitate their re-labeling with their new circuit IDs. The most typical relocation would involve moving an access floor box, and possibly its associated jumper cable, from its original PDM port to a vacant port of a different PDM, or even to a different port of the same PDM. This would then require re-labeling the relocated access floor box with a new circuit ID, given the different circuit(s) to which it would then be connected through its new PDM port location.

The task of correctly identifying circuit IDs is complicated when AFBs of different wiring configurations are employed on a project. It is not unusual for a project to have two or sometimes three different wiring configurations of access floor boxes, meaning that AFB “A” would be wired so that its outlet picked up circuits 1 & 3 from a PDM port, while AFB “B” is internally wired to pick up circuits 2 & 4, and so on. It’s not hard to imagine the difficulty in keeping all the varieties of possible circuit IDs straight after just a few rounds of office churn. An access floor box having an incorrect circuit ID presents a real maintenance safety hazard.

Decreased System Safety

If just one of these relabeling tasks is not 100% accurate, then over time and multiple relocations, this one mistake can very easily snowball, creating a system with many multiple components labeled with the wrong circuit ID.

A mislabeled component within a wiring system creates a substantial risk of bodily injury to anyone making changes to or working on the system. Although it is perfectly safe to relocate system components while the system is energized and under load, there is still a substantial risk to a technician who, at some point in the future may take it upon him or herself to open an access floor box while performing some sort of troubleshooting or maintenance task. Relying on incorrect circuit ID labeling for circuit identification, a technician may believe he or she has shut power off to a device when in fact they have not, placing that technician at risk of receiving substantial injury, or worse.

Jon Dumbauld is President of Communications Integrators, Inc, a North American manufacturer of modular electrical and voice data products.

Related Articles


Latest Articles

  • Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    March 16, 2026 By Electro-Federation Canada Following EFC’s recent update on our 2026 Ottawa Day, we are pleased to share photo highlights from two days of engagement on Parliament Hill, where members met with federal decision-makers to discuss the future of Canada’s electricity system. More than 40 EFC member leaders and Government Relations representatives travelled Read More…

  • Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    March 13, 2026 In January, the total value of building permits issued in Canada increased $607.0 million (+4.8%) to $13.3 billion. The increase was led by the non-residential sector (+$464.0 million) and supported by the residential sector (+$143.0 million). On a constant dollar basis (2023=100), the total value of building permits issued in January rose 4.3% from the previous month Read More…

  • Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    March 13, 2026 The total value of investment in building construction increased $442.9 million (+1.9%) to $23.7 billion in December. The residential sector grew 2.4%, while the non-residential sector edged up 0.6%. Year over year, investment in building construction grew 12.2% in December. On a constant dollar basis (2023=100), the total value of investment in building construction in December rose 1.7% Read More…

  • 5 Strategic Reasons to Attend the Lumen Exhibition

    5 Strategic Reasons to Attend the Lumen Exhibition

    March 13, 2026 In a market where deadlines are tight and projects are increasingly complex, staying competitive is no longer just about technical skills. It also depends on having the right tools, the right information, and the right partners by your side. The Lumen Exhibition is more than just an event—it’s a strategic lever designed to Read More…


Changing Scene

  • A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    March 16, 2026 Guillevin.com was built as a digital working tool, designed to support the way their customers plan, search for, and purchase products today. The goal is simple: to offer a fast, reliable, and intuitive online platform capable of supporting real-world operations; both on the job site and in the office. A platform built around Read More…

  • Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    March 13, 2026 Amendments to existing legislation will mean more housing, improved efficiency in the sector and better alignment of related agencies. The changes extend the Executive Panel on Housing in the Halifax Regional Municipality and give the Minister of Housing new authority to ensure housing projects aren’t delayed. “We are strengthening how we plan, Read More…

  • Sonepar Company Opens a New Automated Distribution Center in Las Vegas

    Sonepar Company Opens a New Automated Distribution Center in Las Vegas

    March 13, 2026 Codale Electric Supply, a Sonepar company, is transforming electrical distribution with the launch of its central distribution center located just off the Las Vegas Strip, in October 2025. The site features a highly automated setup designed to improve speed, accuracy, and customer convenience. At the heart of the facility is an advanced Read More…

  • BC Introduces Public Sector Construction Projects Procurement Act

    BC Introduces Public Sector Construction Projects Procurement Act

    March 13, 2026 Kiel Giddens, MLA for Prince George-Mackenzie and Critic for Labour, has introduced the Public Sector Construction Projects Procurement Act, legislation aimed at ensuring publicly funded construction contracts are awarded through labour-neutral, merit-based procurement. “Here’s the simple question: if labour shortages are driving cost overruns, why would government limit who can work on public projects?” Read More…