CaGBC Contributes Submission for Federal Pre-Budget Consultation

EIN CaGBC logo 400

September 24, 2020

Following an unprecedented global health crisis, Canada is preparing for an economic recovery. Like the 2008 recession, the country is expected to turn to its economic pillars, including construction and infrastructure projects, to reignite the economy and create urgently needed jobs.

However, this remains the critical decade for climate action. Decisions governments make today must help Canada achieve its climate goals. The economic recovery could be the tipping point needed to transition toward a sustainable and low-carbon economy.

As Canada transitions to a low-carbon future, construction will be at the forefront. It represents over seven per cent of Canada’s GDP and almost 30 per cent of Canada’s greenhouse gas (GHG) emissions when building operations, construction, and materials are included.

The construction and infrastructure sector can play an important role in Canada’s economic recovery, by stimulating the economy and getting people back to work. At the same time, it can reduce emissions, improve Canadians’ health, and drive innovation in the building sector.

Should the Government of Canada invest in a recovery strategy targeting green building and adopting progressive policies, we can expect that by 2030:

  •    –   The building industry’s contribution to climate targets will have been met with an annual reduction in 2030 of 53 Mt CO2e;
  •    –   The green building sector will contribute $149.9 Billion in direct annual GDP; and
  •    –   There will be 1,470,032 direct jobs in green building in Canada.

CaGBC offers three recommendations for the Government of Canada to consider as it begins the budget process:

1. The government should support workforce development by:

  •    –   Allocating $500 million or $1,000/employee to access existing low-carbon training programs; and
  •    –   Investing $1 billion for workforce development and training to build green building skills in Canada’s low-carbon economy.

2. The government should stimulate building retrofit projects by:

  •    –   Allocating $50 million through zero per cent financing of energy audits;
  •    –   Allocating $10 billion through the CIB towards a first-loss loan reserve;
  •    –   Requiring a standardized approach to developing and evaluating energy efficiency projects;
  •    –   Supporting the amalgamation of retrofit project investments into non-investment grade green bonds; and
  •    –   Leveraging government procurement power to retrofit government-owned buildings.

3. The government should stimulate zero-carbon construction by:

  •    –   Requiring all federally-funded, owned or leased building projects to move towards zero-carbon performance;
  •    –   Leveraging the procurement process to require that eligible firms demonstrate low-carbon development, design, and construction experience; and,
  •    –   Granting up to 10 per cent of the development costs for public and private sector buildings to build to low-carbon performance.

Source

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…