Test Your Knowledge of the Canadian Electrical Code – Part 1 — The Answers: Fire Alarm Systems

EIN Code Quiz2 400

June 11, 2021

In the last installment, you had the opportunity to answer our questions about the Code and best practices. Here are the answers to those questions.

Fire Alarm Systems, Smoke and Carbon Monoxide Alarms, and Fire Pumps

Q: What rule specifies the requirements for insulated conductors and cables in fire alarm systems and what are the requirements?

A: Rule 32-100 specifies the requirements for insulated conductors and cables in fire alarm systems which include:

  • copper material
  • ampacity
  • use of optical fiber cables
  • use of stranded conductors
  • insulation rated at 300 volts
  • determining wire size for raceways or integral assemblies
  • selection in accordance with rules 12-102(3)or 12-122(1)

Q: What rule requires that no disconnecting means, overcurrent protection or device capable of interrupting the fire pump circuit may be placed between the service box from the normal power supply and the fire pump transfer switch or controller, except?

A: Rule 32-306 requires that no disconnecting means, overcurrent protection or device capable of interrupting the fire pump circuit may be placed between the service box from the normal power supply and the fire pump transfer switch or controller:

  • Except a circuit breaker that is permanently labeled identifying it as a fire pump disconnect.
  • In addition, the circuit breaker must be lockable in the closed position and may be in the separate service box as in Rule 32-304

Q: In the case where this circuit breaker is installed in an emergency power supply circuit between the emergency power source and the fire pump transfer switch, the rating of the circuit breaker shall be?

A: As per rule 28-200:

  • Be set or rated to not less than the rating of the overcurrent protection provided integral with the fire pump transfer switch
  • Indefinitely carry the locked rotor current of the fire pump
  • Where it is installed in a normal supply circuit be rated not less than the overcurrent protection of the fire pump controller
  • Where the circuit breaker is installed in an emergency supply feeder between the emergency generator and the fire pump transfer switch, the feeder must bypass the generator main circuit breaker and be connected directly to the emergency generator.

Go HERE to discuss

Related Articles


Latest Articles


Changing Scene

  • Liteline Welcome New Regional Sales Manager for GTA

    Liteline Welcome New Regional Sales Manager for GTA

    March 9, 2026 Liteline are excited to welcome Peter McCumber as Liteline’s Regional Sales Manager-GTA! “Peter brings more than two decades of experience in the electrical manufacturing and wholesale industry, where he has established himself as a dynamic and results-oriented sales professional,” the company said on LinkedIn. “With Peter’s positive attitude, commitment to excellence, and Read More…

  • New Freshco (not the grocery store) Women in Trades Bursary Supports Leadership Development Across Canada

    New Freshco (not the grocery store) Women in Trades Bursary Supports Leadership Development Across Canada

    March 9, 2026 The Canadian Apprenticeship Foundation is proud to announce the launch of the Freshco (not the grocery store) Women in Trades Bursary, a new initiative designed to support women and non-binary trades professionals in accessing professional development opportunities that strengthen leadership, confidence, and long-term career success. The bursary was established with a named Read More…

  • Eaton Milton Facility Grand Opening

    Eaton Milton Facility Grand Opening

    March 5, 2026 Last month, Eaton celebrated the grand opening of their new Milton facility, joined by customers, industry partners, senior executives and team members. “This expansion doubles our capacity to grow with our customers, strengthens local manufacturing, and enables us to continue delivering innovative power management solutions across Canada,” said Shelly Vaz, Business Unit Read More…

  • Weidmuller Canada Welcomes Franklin Empire Inc. to PRO Partner Family

    Weidmuller Canada Welcomes Franklin Empire Inc. to PRO Partner Family

    March 5, 2026 Weidmuller Canada have announced Franklin Empire Inc. as a new member of their PRO Partner family in Ontario and Québec! “Joining at the Gold level, this marks a proud step forward in strengthening our presence and collaboration across the Ontario and Québec region,” the company said on LinkedIn. “A heartfelt thank you to Read More…