Nexans Cables are Made by Canadians for Canadians

May 30, 2023

Nexans Cables are Made by Canadians for Canadians

For over 100 years Nexans has been manufacturing cables in Canada from cathode to cable, a story that started with the first copper rod spool that left our original Dundas Street plant in Toronto.

From the CN tower to the Confederation Bridge, across the electrical grid from the Atlantic to the Pacific, and with a presence in more than 25% of Canadian homes, we’ve had a hand in a century of Canadian electrification. All this time, we’ve been working behind the scenes to ensure access to safe, reliable, and now decarbonized electricity.

Fergus Plant

100 Years of History for Nexans Plants in Canada

Today, Nexans operates three manufacturing facilities. Our Montreal facility is the company’s oldest, having been established in 1931 as a copper rod mill to fill the plant requirements of the now retired Toronto plant. The Montreal facility today is home to our recycling business, combining raw copper with recycled copper to create new wire. The plant produces nearly 230,000 tons of copper rod each year with 10% being composed of recycled copper. Nexans’ Montreal facility is the only Canadian copper casting facility that supplies Nexans’ copper rod, making all of our cables 100% Canadian made.

The plant in Weyburn, Saskatchewan was the next to be commissioned in 1956 by Western Wire and Cable. Weyburn today is responsible for manufacturing the cables for utility companies throughout Canada and for solar and wind farms.

Our third plant located in Fergus, Ontario was built shortly after as a joint venture between Canada Wire and Cable and Essex Wire in 1965. Today, the Fergus plant manufactures the cables for solar, commercial, industrial, and residential projects.

CN Tower

Why are we Proud to Produce in Canada?

All of our manufacturing facilities have contributed to major projects throughout the years and continue to do so today. In 1976, our power cables were installed in the CN Tower and in 1991,  TECK90 5 kV cables were installed along the length of the Confederation Bridge connecting Prince Edward Island to the New Brunswick mainland.

These large scale projects continue to the present day starting in 2009 with Nexans’ facilities supplying the Enbridge Sarnia Solar Farm in Sarnia, Ontario with cables outputting over 80MW to 12,800 homes.

In 2018, Nexans also delivered one of the longest submarine cables in history providing Eastern Canada with cleaner energy and supplied commercial wires for the Champlain Bridge. And in 2019 and 2021, Nexans supplied the commercial building wires used in Hospital Enfant Jesus in Quebec and solar cables for the Enchant Solar project respectively. We are also present in 1 in every 4 residential homes in Canada, equipped with our Canadex NMD90 cable and that number is rapidly growing after the advent of our new Canadex 2.0 NMD90 cable.

From the electrification of the prairies and the advent of the refrigerators, computers and now electric vehicles, our facilities have played critical roles throughout Canadian electrification history and continue to build the future.

Our People

Team in Fergus, Ontario

At the heart of the organization are the people that make us who we are. Our future is shaped by their creativity, inspiration, and aspirations. At Nexans, we have over 500 employees that are dedicated to ensuring that the people of Canada have electricity. Our people are our most important assets and drive our growth and innovation each and every day and have since the company’s inception.

For over 100 years, our engineers have paved the way for CSA technical standards, and have helped to shape the safety and efficiency standards in the Canadian electrical market. We’ve been involved in the innovative process to create new products from our inception starting in 1939 with the first polyethylene insulated coaxial cable in North America and today have over  750 products across the copper rod and wire, renewable energy, residential, commercial, industrial, and utility markets. We will continue to innovate to propose to Canadian electricians the highest quality standards, fast installation time and the lowest environmental footprint.

We do not only manufacture our cables locally, but our talented team is 100% local and we are committed to hiring a diverse workforce, with employees from all walks of life. Our Weyburn facility is a perfect illustration of our commitment as Nexans’ employees, some of which come from all over the world, are fully immersed in the local Weyburn community.

A Long History that Relies on Strong Partnerships

Over the years, Nexans has contributed to community projects and always has forged high-quality relationships with our neighboring communities, deploying both financial and human resources to support non-profit organizations (Canadian Mental Health Association & United Way), volunteer work, and partnerships with schools. In addition, we have donated cables and support to Habitat for Humanity and have donated cables to electrical trade colleges to provide hands-on experience on how to install cables.

Through our valued distributor partnerships, our cables can be found in every corner of Canada – in residential homes, condominiums, commercial buildings such as hospitals, malls and schools, and industrial buildings such water waste treatment plants and pulp and paper mills just to name a few.

Thank you to our partners and to all Canadian electricians for your support over the course of Nexans’ history. We are proud to produce in Canada and serve the local Canadian businesses that make the country and its people thrive.

Source

Related Articles


Latest Articles

  • Take the Lesson

    Take the Lesson

    September 2, 2024 By Keith Sones, seasoned utility industry executive “I really don’t want to do this.” “You have to Keith. You have no choice. You can’t leave him hanging” replied my wife. I stared at the phone like a child looks at liver on their plate. They know you have to eat it but also… Read More…

  • Quebec Drives the Growth in Residential Building Construction in June, 2024

    Quebec Drives the Growth in Residential Building Construction in June, 2024

    Investment in building construction grew 2.8% to $21.4 billion in June, after a slight increase of 0.8% in May. These increases partly reflect April’s record high of $13.4 billion in total building permits value, since investment levels for a given period are driven by permits issued in prior months. The June increase in investment in building construction was primarily… Read More…

  • Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

    Western Memorial Regional Hospital Sets New Infrastructure Precedent and Receives LEED Silver Certification 

    August 16, 2024 The new Western Memorial Regional Hospital in Corner Brook is home to Canada’s largest geothermal system, which has set a precedent for modern infrastructure for both Newfoundland and Labrador and North America. The geothermal field is approximately 600 feet below the hospital’s parking lot, and provides 100 per cent of the ground… Read More…

  • Brightening Communities: LED Technology in Action

    Brightening Communities: LED Technology in Action

    August 15, 2024 By Alex Price, Brand & Planning Manager, Current LightingTechnical Contributor: Gary Steinberg, Senior System Manager (Outdoor LED Fixtures), Current Lighting As the landscape of Canadian cities continues to evolve, the importance of outdoor lighting cannot be overstated. From enhancing public safety to promoting economic activity and fostering a sense of community, well-planned… Read More…


Changing Scene

  • Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

    Schneider Electric Launches SMART Buildings Division to Drive Sustainable Building Innovation in Canada

    Schneider Electric is transforming its Digital Buildings business in Canada with the launch of the SMART Buildings Division. This evolution marks a strategic move to deliver comprehensive solutions and services that support building owners and operators in achieving their decarbonization and sustainability goals. The demand for smart buildings is surging, driven by a global shift… Read More…

  • Introducing Alan Bearden as Interim President of Southwire Canada

    Introducing Alan Bearden as Interim President of Southwire Canada

    September 4, 2024 Southwire Canada is pleased to announce that Alan Bearden has been appointed Interim President. In this role, Alan will provide leadership and guidance for Southwire’s Canada-based organization, ensuring continuity and driving growth during this transitional period. Alan Bearden brings a wealth of experience to the position, having joined Southwire in 2008. Over… Read More…

  • A Partnership Between Electromag Graybar Canada and Phoenix Contact

    A Partnership Between Electromag Graybar Canada and Phoenix Contact

    September 3, 2024 Electromag Graybar Canada, a pioneer in industrial automation solutions and pneumatic products, is excited to announce a partnership with Phoenix Contact, a global leader in electrification, networking, and industrial automation. This collaboration, which initially began in the Langley and Ontario branches, is now expanding to Quebec. The alliance aims to provide cutting-edge… Read More…

  • Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

    Sonepar Announces the Retirement of William (Bill) C. Smith, Electrozad Director of Transitional Business

    September 2, 2024 William (Bill) C. Smith, Director, Transitional Business of Electrozad Supply Company Limited announced his retirement as of August 30th, 2024 after 49 years of leadership. Bill began his electrical career working part-time at Electrozad Supply while completing a Sales & Marketing Program at St. Clair College.  After his first full-time position in… Read More…