STANDATA Variance on Energy Storage Systems in Residential Buildings

October 30, 2023

Industry has identified concerns regarding Energy Storage System (ESS) requirements. This variance permits the installation of an ESS at a dwelling unit or residential occupancy not exceeding 20 kWh for any single ESS, as an alternative method to the C22.1:21 – Canadian Electrical Code, Part I.

The current electrical code, C22.1:21 – Canadian Electrical Code, Part I, Rule 64-918 2) prohibits the installation of ESS’s utilizing batteries below grade, including basements of dwelling units. Additionally, 64-918 4) prohibits ESS’s with a storage capacity above 1 kWh from being installed in a dwelling unit or living space of a residential occupancy including clothes closets, storage rooms, bathrooms, stairways, or in any similar undesirable locations.

The next electrical code is C22.1:24 – Canadian Electrical Code, Part I is expected to contain requirements for ESS installations up to 20 kWh for any single ESS installed at a dwelling unit or residential occupancy.

The upcoming code provisions in the 2024 edition were developed by the CSA Group. Additional standards related to ESS’s include:

  • Batteries for Use in Stationary and Motive Auxiliary Power Applications ANSI/CAN/UL1973, which covers battery safety,
  • Energy Storage Systems and Equipment ANSI/CAN/UL 9540, which covers overall ESS system safety,
  • ANSI/CAN/UL 9540A Standard for Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems, which covers fire propagation testing.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Federal Investment to Add 989 New Montreal Homes

    Federal Investment to Add 989 New Montreal Homes

    November 18, 2024 The federal government is providing nearly $364 million to help build 989 new homes in Montreal. The announcement took place at 5200 rue de la Savane, in Montreal, which received $100 million dollars through the Apartment Loan Construction Program (ACLP) to build 303 homes and will be operated by Olymbec. This rental building, named Lynk, is designed to… Read More…

  • ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    ABB and NIEDAX Group Announce Completion of Joint Venture with the Formation of Abnex Inc.

    November 18, 2024 ABB completed the previously announced 50/50 joint venture with Niedax Group. The Abnex Inc. joint venture (JV) will broaden solutions and advance opportunities in the rapidly growing North American cable management market. Integrating engineering and manufacturing capabilities of ABB’s Installation Products Division with Niedax Group will enable the newly formed company to deliver a… Read More…

  • Ontario Building More Electric Vehicle Charging Stations

    Ontario Building More Electric Vehicle Charging Stations

    November 18, 2024 The Ontario government is building over 1,300 new electric vehicle (EV) charging ports in small and medium-sized communities, marking a major milestone in the province’s plan to increase access to EV chargers outside of large urban centres and support the electrification of transportation across the province. As the province continues to see… Read More…

  • Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    Ontario Investing Over $74 Million Through Next Round of Skills Development Fund Capital Stream

    November 18, 2024 The Ontario government is launching the second round of its Skills Development Fund (SDF) Capital Stream starting November 29, with over $74 million in available funding to build, expand and retrofit training facilities for workers in the trades, including construction, manufacturing technology and health care. The government is also investing nearly $5 million from the first… Read More…