Energy storage systems (ESS) provide reliability and resiliency for businesses and the grid alike while helping to reduce GHG emissions as an alternative to diesel backup generation. Storing energy can help manage peak demand charges, reduce peak loads on the grid and provide electricity during outages. 

The offer

BC Hydro are offering incentives to their business customers to support the acquisition, installation, and operation of ESS. Once installed, BC Hydro will have the ability to dispatch the ESS automatically in response to changing conditions on the grid. These dispatch signals trigger the battery to discharge, powering the facility it’s attached to and reducing demand on the grid. The battery will then recharge later in the day or at night.

How it works

The incentive provided is based on the amount of battery capacity the customer nominates to be available for demand flexibility or demand response events.  The incentive is calculated as the lesser of:

  • $10,000 X kW nominated
  • $10,000 X kWh/4 nominated
  • 80% of eligible project costs.

Eligibility

To be eligible for BC Hydro’s energy storage incentive (ESI), customers must meet the following criteria:

  • Be on a general service or irrigation rate under the Electric Tariff.
  • Plan to install a new battery. Batteries that have already been purchased
    or installed are not eligible.
  • Have an operating smart meter
  • Must complete applicable net metering or generator interconnections process. Systems must be non-exporting to the grid.
  • Must install and energize an ESS that meets all the system requirements of the program within 24 months of completing a distribution generator interconnections facility study or the net metering application process.
  • Agree to a 10-year contract to provide demand flexibility services via the ESS to BC Hydro.
  • Provide reliable demand flexibility year-round within the following
    parameters:
    • Maximum duration (hours /event): 4
    • Maximum daily frequency: 2
    • Minimum hours between events: 5
  • Must reliably respond to flexibility dispatch events. Performance is considered reliable when the ESS is charged to provide at least 85% of its nominated capacity for 85% of all demand response events, as measured at the start of the event. Reliability is assessed annually.
  • Must connect to BC Hydro software platform via IEEE 2030.5, SCADA, established API or other method approved by BC Hydro to receive event signals.

How to apply

See BC Hydro’s energy storage system (ESS) application process [PDF, 96 KB] for details. You’ll also need our incentive application workbook [XLS, 167 KB] to begin the process. 

Resources

For more information, see our Customer manual – Energy storage systems [PDF, 635 KB].

Note

Tesla products are not eligible

The Government of B.C. and BC Hydro are taking action to preference Canadian goods in our rebate programs going forward and to exclude, where practicable, U.S. produced goods. As of March 12, 2025, Tesla products are not eligible for Energy Storage Incentive offer. If you’re already reviewing Tesla products as a solution for your energy storage system needs, please note that the requirements and technical specifications can readily be transferred to another manufacturer/ vendor.

Go HERE for more information

Related Articles


Latest Articles


Changing Scene

  • Delta Transformers Appoints New Representative in Ontario

    Delta Transformers Appoints New Representative in Ontario

    October 8, 2026 Delta Transformers, a Canadian manufacturer of dry-type transformers, is pleased to announce the appointment of Spectrum Power Systems as their new representative in Ontario, Canada, effective October 1st, 2026. For over 27 years Spectrum Power Systems has been representing leading electrical manufacturers throughout Ontario. The company has a strong presence in the… Read More…

  • Former Electrical Contractor Principal Arrested Following ESA Referral to Police

    Former Electrical Contractor Principal Arrested Following ESA Referral to Police

    October 8, 2026 Arrest follows ESA licence revocation, $70,000 in previous fines and new electrical safety charges   Peel Regional Police recently arrested Rahyl Hassan, principal of former Licensed Electrical Contractor, Strak Holdings Inc., following an investigation in which the Electrical Safety Authority (ESA) cooperated with police.  ESA referred concerns about potential criminal activity to Peel… Read More…

  • Federal Government Announces $2 billion Investment to Deliver One Million Home Retrofits Across Canada

    Federal Government Announces $2 billion Investment to Deliver One Million Home Retrofits Across Canada

    October 8, 2026 The federal government has announced a $2 billion investment to deliver one million home retrofits across Canada. These energy-efficient retrofits will lower heating costs for Canadians and reduce emissions. First, they are launching a new National Heat Pump Rebate to help up to 820,000 households make the switch to more efficient electric heat pumps: Heat pumps… Read More…

  • FCM and the Government of Canada Announce $66.3 M in 162 Energy Efficient Housing Projects

    FCM and the Government of Canada Announce $66.3 M in 162 Energy Efficient Housing Projects

    September 8, 2026 Funding supports homeowners and affordable housing providers in reducing energy costs and improving quality of life, while adding jobs to communities coast-to-coast  The Government of Canada and the Federation of Canadian Municipalities (FCM) today announced that $66.3 million in funding has been approved for 162 energy efficiency projects across the country. The… Read More…