Graybar Canada Opens Temporary Windsor Branch

Graybar Canada Opens Temporary Windsor Branch

September 14, 2016

Because of severe tornado damage at Graybar Canada’s Windsor, Ontario branch (2760 Deziel Drive), the company will be operating from a temporary location until the damage has been fully repaired.

Graybar Canada is now open for business at 3505 Rhodes Dr., Windsor ON, N8W 5B3 (the old Fedex building). Hours of operation are 7:00 am – 5:00 pm, Monday to Friday. Phone numbers and emails have not changed.

Graybar Canada offers a special thank you to its partner R.A. Farrow for logistics support throughout this unfortunate event.

If you have questions, contact Graybar Canada at (519) 944-4414.

How Graybar can help you create an intelligent building system

Through the Internet of Things (IoT), new automated building system architectures permit communication, monitoring and management anywhere in the building or world via the internet. Intelligent buildings use technology to link both hardwired and wireless network systems into a converged building system. Data are generated and shared over a single platform to enhance efficiency and monitoring capabilities.

Information technology infrastructure serves as the brain of an intelligent building. Integration of networks begin with sharing infrastructure for every system, such as cabling, sensors and switches.

Graybar Canada’s comprehensive offering of products and services reduce total building cost of ownership, boost building efficiency and enhance productivity. Our products and solutions cover security, mobility, energy, notification, networks and a variety of services to meet your intelligent building needs.

To learn more, contact your Graybar Canada representative (www.graybarcanada.com/company/contact-us/).

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…

  • Major Construction Underway at Woodbine GO Station

    Major Construction Underway at Woodbine GO Station

    October 2, 2026 Major construction is underway at Woodbine GO Station, marking another significant milestone in the Ontario government’s plan to provide two-way, all-day service across core segments of the GO Transit network. Crews are now building station platforms that will connect thousands of daily riders to the Kitchener GO Line, Union-Pearson (UP) Express and… Read More…