Electrical Contractor Fined for Unfair Practices

conviction

November 24, 2017

In July 2014 Justin Smith, operating as D & S Electrical Contractors, provided a customer with an estimate of $10,982.71 to supply and install a generator at a customer’s house.

Smith accepted and provided a receipt for a $7,500 deposit in late July 2014.

Work began on or about August 10, 2014, and stopped on or about Sept. 10, 2014.

The generator wasn’t delivered or installed; work completed included installation of a small concrete slab, two exterior conduits, and two exploratory holes in the basement drywall.

 

The decision came down in Milton court on Sept. 21.

Justice of the Peace Paul Welsh ordered Smith to return the $7,500 deposit to the client.

In addition, he’s facing a two-year probation period with terms of restitution, a reporting requirement and reporting an address change.

Consumer Protection Ontario suggests deposits should be no more than 10 per cent of the estimated cost, according to Ministry of Government and Consumer Services spokesperson Sandra Bento.

Related Articles


Latest Articles

  • Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…

  • Lighting Control Basics for Home Automation

    Lighting Control Basics for Home Automation

    By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology?  Or are you a true believer?  As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…

  • Grounded in Ontario: The Future of Energy Storage Systems

    Grounded in Ontario: The Future of Energy Storage Systems

    December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…

  • 4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…


Changing Scene