$1.4 Million to Make New Brunswick First Fully Connected Province

NB Power

January 19, 2018

New Brunswickers will benefit from the installation of nine additional e-charging sites in the province. The 1.4 million dollars investments will double the fast-charge eCharge Network and will make New Brunswick the first fully connected province in Canada with a DC Fast charging network for electric vehicles.

The investments include $774, 500 from the Province of New Brunswick, which includes $577,000 from NB Power and $197,500 from the Regional Development Corporation as well as $647, 500 from the Government of Canada, which includes $ 450,000 from Natural Resources Canada and $ 197,500 from the federal Gas Tax Fund.

“The climate change action plan calls for a collaborative approach to creating the strategic infrastructure to support electric vehicles, and we’re proud to be a partner in such a progressive plan to build greener infrastructure and support the low-carbon economy,” said Environment and Local Government Minister Serge Rousselle. “Today’s announcement is exciting news and shows that by working together we’ve positioned New Brunswick as a leader in supporting electric transportation.”

The new fast chargers will be accompanied by Level 2 charger at each location.

Since this past summer, ten fast charge sites have been installed in New Brunswick. The new sites announced today almost double the capacity and include many rural communities throughout the province.

“Expanding the network of electric vehicle charging stations, in New Brunswick and across the country, will give Canadians more transportation options and help put more clean vehicles on our roads and highways”, said Member of Parliament for Acadie-Bathurst and Parliamentary Secretary to the Minister of Immigration, Refugees and Citizenship, Serge Cormier. “Congratulations to NB Power and its partners for helping to advance our federal and provincial efforts to build a clean economy, create well-paying jobs, and realize our climate change goals.”

Electric vehicle owners can reduce their fuel-related costs by about 80% while reducing their carbon footprint by 80%.

“We are very proud to spearhead this first in Canada,” said NB Power president and CEO, Gaëtan Thomas. “By having a network of fast chargers throughout our province, it will give electric vehicles owners the peace of mind they need when they are travelling from one point to another. It will reduce range anxiety.”

The new chargers will be in the following locations:

  • Saint Quentin
  • Eel River Bar
  • Bathurst 
  • Tracadie
  • Miramichi
  • Doaktown
  • Richibucto
  • Rothesay
  • South Western New Brunswick

The new chargers will join existing chargers that were installed since last summer in the following locations:

  • Edmundston
  • St. André (Grand Falls)
  • Perth-Andover
  • Beardsley (Woodstock)
  • Prince William
  • Waasis (Lincoln)
  • Youngs Cove
  • Salisbury
  • Magnetic Hill
  • Aulac

About the eCharge Network:

The eCharge Network is NB Power’s public charging program for electric vehicles. The eCharge Network is made up of standard level-2 (240 volt) charging stations located throughout the province and will result in 19 fast-charging stations (400 volt) not only along the TransCanada Highway from Edmundston to Aulac, but throughout the entire province.

https://www.nbpower.com/en/about-us/news-media-centre/news/2018/investments-of-14-million-to-make-new-brunswick-first-fully-connected-province/

Related Articles


Latest Articles

  • Code Question on Section 24 – Patient Care Areas

    Code Question on Section 24 – Patient Care Areas

    July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…

  • Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    Ontario’s Institutional Component Drives Non-Residential Construction Intentions in May 2025

    July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…

  • Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    Plan Group Partners in Construction of UHN Surgical Tower at Toronto Western Hospital

    July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…

  • How Canada Can Equip Workers for a Low-Carbon Future

    How Canada Can Equip Workers for a Low-Carbon Future

    July 14, 2025 The Canadian economy is shifting towards low-carbon industries, and the workforce is shifting with it. New roles are emerging, traditional ones are evolving and the demand for skilled workers is growing fast — particularly in light of the ambitious nation-building agenda the federal government has set out. In the federal Speech from… Read More…


Changing Scene

  • OEL Apprentice Success Project Available Until March 2026

    OEL Apprentice Success Project Available Until March 2026

    July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…

  • EB Horsman Unveils New Mural at Campbell River Branch

    EB Horsman Unveils New Mural at Campbell River Branch

    July 14, 2025 EB Horsman & Son are thrilled to unveil a new mural at their Campbell River branch, painted by the talented Kwakwaka’wakw artist, Adam Lewis. “This stunning piece celebrates Indigenous heritage and our community spirit,” said EB Horsman on LinkedIn. “As we mark 125 years of serving Western Canada and 55 years in… Read More…

  • Glenco Electric Celebrate New Red Seal Team Members

    Glenco Electric Celebrate New Red Seal Team Members

    July 14, 2025 “The Red Seal Journeyman designation is the highest recognition in the trades, and we’re proud to have seen so many of our team members earn it under our watch,” said Glenco Electric on LinkedIn. “At Glenco, we’re big on mentorship and promoting from within. When you combine that with driven, hard-working professionals,… Read More…

  • Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    Canada and Ontario Investing to Improve Energy Efficiency in Province’s Agri-Food Industry

    July 14, 2025 The governments of Canada and Ontario are investing up to $3 million and launching the third intake of the Agricultural Stewardship Initiative (ASI) to help farmers implement projects to improve the energy efficiency of their farming operations. To support the province’s plan to protect Ontario, this funding will help local agriculture, agri-food… Read More…