Safety Requirements for Temporary Emergency Health Care Facility (TEHCF)

EIN 24 ESA 400

April 22, 2020

Given the current situation with COVID-19 and its potential impact on the capacity of the health care system, this document highlights major electrical safety requirements when using existing buildings or temporary structures as TEHCF.

The intent of this document is to assist in the rapid conversion of these facilities by providing a deviation, as described herein, to the requirements of the Ontario Electrical Safety Code (OESC) regarding basic and intermediate patient care areas (as defined in OESC) as well as recovery centres, while requiring the TEHCF to maintain an acceptable level of electrical safety.

Unless requested by the health care administrator(s) responsible for planning, organizing, directing, and controlling the TEHCF, “Section 24 – Patient care areas” of the OESC need not apply. In general, requirements of Section 76 “Temporary Wiring” of the OESC shall be permitted for the temporary use of establishments used as TEHCFs. Examples of TEHCFs include but are not limited to:

 Hotels and student dorms

 Field hospitals

 Heated garage space (parking garages)

 Arenas and exhibition places.

 Large open manufacturing spaces.

Go HERE for the full document

Related Articles


Latest Articles


Changing Scene

  • Apply for ECAO 2026 Scholarships

    Apply for ECAO 2026 Scholarships

    July 31, 2026 It is that time of year again when ECAO are offering scholarships to post-secondary graduates for children or wards of salaried employees of ECAO Member Companies. The scholarship was launched in 2004 and awards 5 successful recipients with a scholarship of $5,000 each. The scholarship will be awarded to outstanding students enrolling… Read More…

  • Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    Toronto Pearson Extends Transformation with $1.5B in Terminal Modernization

    July 31, 2026 Toronto Pearson has announced contracts to NORR-DIALOG and PCL Construction, who will design and construct another major infrastructure program. The $1.5-billion investment to launch the Terminal 1 and Terminal 3 Revitalization Program has been awarded to NORR-DIALOG, a joint venture between two firms both Ontario-incorporated, and PCL Construction, a global firm created and headquartered… Read More…

  • D.A.D. Sales Welcomes new Team Member – Tom Graham

    D.A.D. Sales Welcomes new Team Member – Tom Graham

    July 31, 2026 D.A.D. Sales announced the addition of Tom Graham as Construction Sales Representative on the D.A.D. Sales team, supporting Northern Alberta. “Tom brings valuable industry experience, a strong understanding of the construction market, and firsthand insight as a skilled tradesman. He understands our customers’ businesses and the realities they face in the field.… Read More…

  • Franklin Empire Opens New Full-Line Branch in Peterborough

    Franklin Empire Opens New Full-Line Branch in Peterborough

    July 31, 2026 Franklin Empire is pleased to announce the opening of their new Peterborough branch, bringing together electrical, automation, and Process Instrumentation expertise under one roof. This new location expands their ability to better serve contractors, industrial facilities, OEMs, municipalities, and commercial customers throughout the Peterborough region with a complete range of products, technical… Read More…