CaGBC Contributes Submission for Federal Pre-Budget Consultation

EIN CaGBC logo 400

September 24, 2020

Following an unprecedented global health crisis, Canada is preparing for an economic recovery. Like the 2008 recession, the country is expected to turn to its economic pillars, including construction and infrastructure projects, to reignite the economy and create urgently needed jobs.

However, this remains the critical decade for climate action. Decisions governments make today must help Canada achieve its climate goals. The economic recovery could be the tipping point needed to transition toward a sustainable and low-carbon economy.

As Canada transitions to a low-carbon future, construction will be at the forefront. It represents over seven per cent of Canada’s GDP and almost 30 per cent of Canada’s greenhouse gas (GHG) emissions when building operations, construction, and materials are included.

The construction and infrastructure sector can play an important role in Canada’s economic recovery, by stimulating the economy and getting people back to work. At the same time, it can reduce emissions, improve Canadians’ health, and drive innovation in the building sector.

Should the Government of Canada invest in a recovery strategy targeting green building and adopting progressive policies, we can expect that by 2030:

  •    –   The building industry’s contribution to climate targets will have been met with an annual reduction in 2030 of 53 Mt CO2e;
  •    –   The green building sector will contribute $149.9 Billion in direct annual GDP; and
  •    –   There will be 1,470,032 direct jobs in green building in Canada.

CaGBC offers three recommendations for the Government of Canada to consider as it begins the budget process:

1. The government should support workforce development by:

  •    –   Allocating $500 million or $1,000/employee to access existing low-carbon training programs; and
  •    –   Investing $1 billion for workforce development and training to build green building skills in Canada’s low-carbon economy.

2. The government should stimulate building retrofit projects by:

  •    –   Allocating $50 million through zero per cent financing of energy audits;
  •    –   Allocating $10 billion through the CIB towards a first-loss loan reserve;
  •    –   Requiring a standardized approach to developing and evaluating energy efficiency projects;
  •    –   Supporting the amalgamation of retrofit project investments into non-investment grade green bonds; and
  •    –   Leveraging government procurement power to retrofit government-owned buildings.

3. The government should stimulate zero-carbon construction by:

  •    –   Requiring all federally-funded, owned or leased building projects to move towards zero-carbon performance;
  •    –   Leveraging the procurement process to require that eligible firms demonstrate low-carbon development, design, and construction experience; and,
  •    –   Granting up to 10 per cent of the development costs for public and private sector buildings to build to low-carbon performance.

Source

Related Articles


Latest Articles

  • Why Business ERP Software Integrations Matter for Modern Estimating Teams

    Why Business ERP Software Integrations Matter for Modern Estimating Teams

    March 2, 2026 By Melvin Newman, Patabid CEO Construction estimating is a high-stakes game. For large electrical contractors managing multiple projects, millions in material costs, and dozens of estimators, the margin for error is razor-thin. A misquoted job doesn’t just lose money—it can tie up crews, strain supplier relationships, and ripple through your entire operation. Read More…

  • Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    Ontario Building and Construction Tradeswomen Statement on International Women’s Day

    March 2, 2026 This International Women’s Day, the Ontario Building and Construction Tradeswomen (OBCT) proudly celebrates the leadership, resilience, and collective power of women in the trades across Ontario. This year’s theme is Give to Gain, which highlights the strength of reciprocity and collective support. When tradeswomen, organizations, and communities uplift each other through generosity, opportunities for women Read More…

  • Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    Recall: PureVolt Photoelectric Smoke Detector Recalled Due to Potential Failure to Operate

    March 2, 2026 This recall involves Purevolt Photoelectric Smoke Detector model SD119-4 for fire alarm systems, compatible with 4 wires, 12V DC. The product measures 100mm x 48mm and is intended for indoor use, with ceiling or wall mounting. The model number can be found on the label affixed to the back of the product. Issue Health Canada’s sampling Read More…

  • Sustainable Urban Development Starts with Streetlighting Transformation in Val-D’or

    Sustainable Urban Development Starts with Streetlighting Transformation in Val-D’or

    March 2, 2026 The City of Val-d’Or, in the heart of Quebec’s Abitibi-Témiscamingue region, undertook a major streetlight revitalization project on 7th Street, a principal north-south artery. By updating public lighting, it would improve energy efficiency, give this iconic area a contemporary look, and preserve its urban identity. Old streetlights on 7th Street had been Read More…


Changing Scene