ABB and Bornes Québec to Expand EV Charging Infrastructure

New Project 2

May 26, 2021

ABB has entered into an agreement with charging solution provider Bornes Québec to ensure wider availability of fast and convenient electric vehicles (EV) charging stations in the province of Quebec and to accelerate Canada’s move towards sustainable transportation.

The future is looking green for Quebec: the province has the most electric vehicles in Canada. (47% of Canada’s EVs and OHVs are in Quebec). With its  2030 Plan for a Green Economy, Quebec aims to eliminate the sale of gasoline-powered vehicles by 2035, increase the number of EV’s in public transit (55% of city buses and 65% of school buses electrified by 2030), reduce greenhouse gas emissions by 37.5% (below the 1990 level) and investments in the local economy will grow (budget of $6.7 B). 

As part of this agreement, ABB’s industry-leading charging stations will be available to all Bornes Québec customers across the province. ABB will supply three types of charging solutions: its high quality 7kW AC wallbox chargers, its 24kW DC wallbox chargers, which offer fast charging in an ultra-compact footprint, and the 50kW Terra 54 fast charger, which can provide a quick “refill” by adding 100 km in as little as 25 minutes.

ABB charging stations will be installed in EVera structures, an integrated charging system for which Bornes Québec is the exclusive distributor in the province. ABB technology ensures the charging stations provide the reliability that drivers need, and the durability demanded by Québec’s harsh winter conditions. Its robust design can operate in very low temperatures and the cable holster on the structure prevents snow from accumulating on the connector.

Bornes Québec supports its customers through all stages of acquiring charging infrastructure, providing innovative solutions and outstanding customer service with installation planning, support, and grant applications. The recent partnership reflects ABB’s commitment to enable a low-carbon society. Electric vehicles, along with widely available charging stations, are key for e-mobility to flourish, reduce greenhouse gas emissions and meet Canada’s 2030 climate goals.

“ABB’s values are like those of Bornes Québec, both in terms of innovation and environmental protection. We are confident that this agreement will result in world-class, sustainable solutions for our customers,” says Maurice Côté, President, Bornes Québec.

The International Energy Agency predicts at least 140 million new public and private EV chargers will be installed globally in this decade as governments around the world implement policies for transitioning to a zero-emission future.

“We are pleased to partner with Bornes Québec who shares our vision for the electrification of transportation. This collaboration will enable the implementation of safe, smart and sustainable charging infrastructure throughout the province of Quebec.  As the number of EVs continues to grow, this agreement provides an excellent opportunity to pave the way for a greener future,” said John Ieraci, Director, E-mobility, ABB Canada.

Source 

Related Articles


Latest Articles

  • Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    Lever Connectors and Twist-Ons: How to Decide Which is Right for the Job

    There are many different types of wire connectors, and sometimes it can be hard for electricians to determine which one is best to use. Read More…

  • Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    Winnipeg Information Bulletin: Low-Risk Voice, Data, Video & Security System Installations

    September 17, 2026 Certain types of installations may qualify for a low-risk voice, data, video (VDV) and security system electrical permit. For information related to regular VDV/security system installations, see winnipeg.ca/vdvsystems. Applications must be submitted through Permits Online. Electrical permits and inspections are needed for certain installations of security and similar alarm systems. This makes… Read More…

  • What Type of Outdoor Light Do I Need for My Application?

    What Type of Outdoor Light Do I Need for My Application?

    September 17, 2026 By Stanpro The right outdoor light starts with the space you need to illuminate and how that space is used. For commercial projects, parking lots and large exterior areas point toward area lights; entrances and building perimeters toward wall-mounted or security lighting; signs, facades and targeted areas toward flood lights; pathways toward… Read More…

  • Alberta Employers and Tradespeople Share their Perspectives

    Alberta Employers and Tradespeople Share their Perspectives

    September 16, 2026 In Alberta’s skilled trades labour market employers and tradespeople are facing growing pressure from tariffs, rising costs, hiring challenges and labour mobility barriers. CAF-FCA’s new report, Hiring, Mobility and Needed Supports: Alberta Employers and Tradespeople Share Their Perspectives, takes a closer look at what’s happening on the ground. Based on surveys of… Read More…


Changing Scene

  • MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    MacKinnon Magnetics Partners with Adanac Sales in BC and Yukon

    October 5, 2026 MacKinnon Magnetics is excited to welcome Adanac Sales LLP as their new sales agency partner representing British Columbia and Yukon! The Adanac team brings industry expertise, strong local relationships, and a commitment to supporting customers – qualities that make Mackinnon Magnetics excited about what they can build together. “This partnership marks another… Read More…

  • Government of Canada Introduces Legislation to Transform how Canada Builds

    Government of Canada Introduces Legislation to Transform how Canada Builds

    October 2, 2026 The world is changing rapidly. In response, Canada is focused on what we can control: building a stronger, more independent, and more sustainable economy. We are leveraging our strengths and moving with speed to open new markets, strengthen supply chains, accelerate projects, and unlock our natural resources. As we build, we are… Read More…

  • Ontario Awards Construction Contract for New Little Current Swing Bridge

    Ontario Awards Construction Contract for New Little Current Swing Bridge

    October 2, 2026 The Ontario government has named a construction manager for the Little Current Swing Bridge replacement project. The new bridge will replace the existing bridge on Highway 6 connecting Manitoulin Island to the mainland, providing reliable, year-round access to the provincial highway network and making it easier for workers and families to connect… Read More…

  • Construction Starting on new Pitt Meadows Secondary School in BC

    Construction Starting on new Pitt Meadows Secondary School in BC

    October 2, 2026 Construction is beginning on the new Pitt Meadows Secondary school, which will provide students with a safer and more modern environment to learn. “Pitt Meadows is a vibrant community with a bright future and I’m proud that the local high school will soon better reflect the community it serves,” said Lisa Beare,… Read More…