Case Study: Temporary Power for Large Scale Residential Construction

Temporary Power

Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles

  • EV Landscape in Canada: EV Sales, Charging Infrastructure, Incentives, Trends

    EV Landscape in Canada: EV Sales, Charging Infrastructure, Incentives, Trends

    September 22, 2025 By Blake Marchand In Canada, the pressure that US tariffs have put on automakers has led to a recent decision by the federal government to pause and review their EV Availability Standard (EVAS), which set targets for automakers on EV sales and range of models. With that recent announcement, I thought it… Read More…

  • Cooper Lighting Solutions Commits to Canadian Acquisition

    Cooper Lighting Solutions Commits to Canadian Acquisition

    September 22, 2025 Cooper Lighting Solutions, part of the global Signify family, just made a noteworthy move by acquiring Calgary-based Nemalux, a company that has quietly built a reputation over the past two decades for making “tough-as-nails” LED lighting. Nemalux specializes in fixtures designed for the truly harsh places like oil rigs, mines, ships, and… Read More…

  • Major Projects Under Consideration by the Federal Government

    Major Projects Under Consideration by the Federal Government

    Projects deemed to be of national importance and significance are being referred to the Major Projects Office who will continue to work with proponents, provinces, territories and Indigenous Peoples to find the right way forward for these projects. The initial projects under consideration are: LNG Canada Phase 2 – Kitimat, BC Proponent: LNG Canada This project would double… Read More…

  • EFC Urges Federal Government to Maintain the EV Availability Standard to Ensure Affordability, Consumer Choice, and Industry Certainty

    EFC Urges Federal Government to Maintain the EV Availability Standard to Ensure Affordability, Consumer Choice, and Industry Certainty

    Electro-Federation Canada (EFC), the national association representing over 230 member companies in the electrical industry, including manufacturers, distributors, and technology providers that power Canada’s electrification infrastructure, is calling on the federal government to maintain the Electric Vehicle (EV) Availability Standard and preserve policies that send strong and consistent signals to consumers, manufacturers, and investors. At… Read More…


Changing Scene

  • Cooper Lighting Solutions Commits to Canadian Acquisition

    Cooper Lighting Solutions Commits to Canadian Acquisition

    September 22, 2025 Cooper Lighting Solutions, part of the global Signify family, just made a noteworthy move by acquiring Calgary-based Nemalux, a company that has quietly built a reputation over the past two decades for making “tough-as-nails” LED lighting. Nemalux specializes in fixtures designed for the truly harsh places like oil rigs, mines, ships, and… Read More…

  • Greenlee Experience 2025 – Recap

    September 18, 2025  Greenlee brought together electrical and utility professionals for its fourth annual Greenlee Experience, a three-day VIP event   at one of its manufacturing facilities. This exclusive event was created to honor professionals in the electrical and utility trades, while offering a behind-the-scenes look at the brand’s legacy of innovation. “It was an absolute joy… Read More…

  • Ontario Investing $10 million to Build New South Bowmanville Recreation Centre

    Ontario Investing $10 million to Build New South Bowmanville Recreation Centre

    September 18, 2025 The Ontario government is investing $10 million to support the construction of the South Bowmanville Recreation Centre in the Municipality of Clarington. This project is part of the $200 million Community Sport and Recreation Infrastructure Fund (CSRIF) — a provincewide initiative to help communities revitalize local facilities, grow the economy and promote active,… Read More…

  • Ontario Investing $19.5 Million to Build New Recreation Complex in Cambridge

    September 18, 2025 The Ontario government is investing $19.5 million to protect jobs and support the construction of a new multi-purpose recreation complex in the City of Cambridge. This project is part of the $200 million Community Sport and Recreation Infrastructure Fund (CSRIF), a provincewide initiative to revitalize local facilities, grow the economy and promote active, healthy… Read More…