Case Study: Temporary Power for Large Scale Residential Construction

Temporary Power

Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles

  • Electric Avenue Responds to Enel X’s Exit from North American Market with a Call for Open-Source EV Charging Standards

    Electric Avenue Responds to Enel X’s Exit from North American Market with a Call for Open-Source EV Charging Standards

    October 4, 2024 Electric Avenue has issued a response to the recent announcement that Enel X, a major player in the EV charging space, will be shutting down its North American operations effective October 11, 2024. This decision leaves over 170,000 EV chargers across the U.S. and Canada without software support, rendering them largely inoperable…. Read More…

  • Electrical Safety Authority Recognizes Safety Excellence in Ontario at its 2024 Annual Meeting

    Electrical Safety Authority Recognizes Safety Excellence in Ontario at its 2024 Annual Meeting

    September 30, 2024 PUC Services Inc., Bluewater Power, Hydro One & London Hydro, Elexicon Energy, Mellon Inc., and Ottawa Community Housing were honoured at the 2024 Ontario Electrical Safety Awards for exemplary electrical safety leadership. The Electrical Safety Authority (ESA) held its Annual Meeting and Ontario Electrical Safety Awards earlier this month to celebrate leadership… Read More…

  • Incentives for Tubular LEDs Now Available in BC

    Incentives for Tubular LEDs Now Available in BC

    September 30, 2024 Changes in technology and safety prompt update of BC Hydro incentive to include Tubular lamp replacements BC Hydro’s Alliance of Energy Professionals members have been asking for it as far back as 2015, and it’s now arrived. Tubular lamp replacements will now qualify for incentive funding through the business energy saving incentives (BESI) program. “We… Read More…

  • 2024 IDEAL National Championship Wraps up in West Palm Beach, Florida

    2024 IDEAL National Championship Wraps up in West Palm Beach, Florida

    September 30, 2024 IDEAL successfully concluded the 2024 IDEAL National Championship, with the finals taking place in West Palm Beach, Florida this past weekend. Between April and July, IDEAL organized 10 qualifying events across Canada, engaging over 500 enthusiastic student apprentices eager to demonstrate their troubleshooting abilities. Each event’s top finisher advanced to the at-home… Read More…


Changing Scene