Schneider Electric: New Micro Data CentreSolutions Respond to Processing Speed and Other Challenges

Micro Data Centre

Schneider Electrichas launcheda new micro data centre solution portfolio for customers who need to reduce latency and quickly add capacity while ensuring a secure and easy to manage environment. Delivered in a single enclosure, the benefits of the new micro data centre solutions include power, cooling and management software to support a self contained, secure computing environment.

“Through this new offer, Schneider Electric is addressing the latency, bandwidth and processing speed challenges customers are facing with the growth of connected devices and data applications,” says Dave Johnson, Senior Vice President, Data Centre Solutions, Schneider Electric. “We are already seeing the emergence of edge applications in retail and industrial applications, and we believe the need for edge computing will only grow as the Internet of Things expands into commercial applications.”

Schneider Electric’s micro data centre physical infrastructure solutions include the enclosure, uninterruptible power supply (UPS), power distribution, management software (DCIM), environmental monitoring, cooling and security – all tested, assembled, packaged and then shipped together in a factory environment.

Solutions include:
• SmartBunker SX: traditional for IT rooms
• SmartBunker CX: optimized for office environments
• SmartBunker FX: ruggedized for any environment
• SmartShelter: multi-rack, ruggedized for any environment

The company lists key solutions benefits as:
• simplified management
• high levels of security
• optimized installation and operating cost
• configured, delivered and installed in the shortest possible time
• reliability via standardization and factory testing

“Localized or micro data centers are a fact of life, but by applying a self-contained, scalable and remotely managed solution and process, CIOs can reduce costs, improve agility and introduce new levels of compliance and service continuity,” says David Cappuccio, vice president, distinguished analyst and chief of research for the Infrastructure teams at Gartner. “Creating micro data centres is something companies have done for years, but often in an ad-hoc manner. By partnering with vendors, and creating a consistent and standardized architecture, enterprises can regain control of these critical assets, and increase the ability to rapidly introduce site-specific services, while reducing risks and operational costs, and improving service levels.” (1)

The new micro data centre solutions are now available in North America and will release globally during 2015. Each solution has specific options available and can be customized upon request. Find out more:http://www.schneider-electric.us/en/solutions/system/s4/data-center-and-network-systems-micro-data-center/.

(1)Gartner, “Apply a Self-Contained Solution to Micro Data Centres”, David Cappuccio, 26 January 2015. Document #G00268769.

 

Related Articles


Latest Articles

  • Lighting Case Study: Metro Toronto Convention Centre

    Lighting Case Study: Metro Toronto Convention Centre

    September 27, 2024 Goal: Upgrade the outdated 350-450-Watt metal halide lighting technology at the Metro Toronto Convention Centre (MTCC) with high-performing, energy-efficient, long-lasting, and low-maintenance LED fixtures from LEDVANCE Products Installed: 1,431 200-Watt UFO High Bay Fixtures from LEDVANCE, which are ideal replacements for metal halide lighting Benefits: LEDVANCE LEDs slashed the MTCC’s previous lighting… Read More…

  • The Consulting Engineer’s Guide to Advanced Electric Boiler Technology

    The Consulting Engineer’s Guide to Advanced Electric Boiler Technology

    September 27, 2024 An international boiler expert helps industry professionals take advantage of high voltage electrode boilers’ virtually 100% efficient, zero-emission capabilities, providing guidance on selection and installation For consulting engineers tasked with planning, designing, and supervising construction projects for a wide range of industries, advanced electric boilers – particularly high voltage electrode boilers –… Read More…

  • Just Getting Started – Discussing Milwaukee’s 100 Year Anniversary with President of Milwaukee Tool Canada, John Myers

    Just Getting Started – Discussing Milwaukee’s 100 Year Anniversary with President of Milwaukee Tool Canada, John Myers

    September 23, 2024 By Blake Marchand It goes without saying that the Milwaukee brand is historic. Their longevity is a testament to company culture and innovation. As this year marks Milwaukee’s 100th anniversary, the company held a tree planting ceremony earlier in the year to mark the milestone, planting 100 trees in partnership with Tree… Read More…

  • ECABC Provides Platform Recommendations to BC Political Parties

    ECABC Provides Platform Recommendations to BC Political Parties

    September 23, 2024 The Electrical Contractors Association of British Columbia has provided three platform policy recommendations to each of BC’s major political parties in advance of the October 19, 2024 provincial election: implementing prompt payment legislation, increasing capital and operating funding to support electrical apprentices, and naming a Minister responsible for construction in their Cabinet…. Read More…


Changing Scene

  • NOARK Partners With Innovelec, to Power the Electrical Industry in Western Canada

    NOARK Partners With Innovelec, to Power the Electrical Industry in Western Canada

    September 26, 2024 INNOVELEC, a supplier of products and services for the electrical industry in Western Canada for over 25 years,  and NOARK Electric, global manufacturer of low-voltage electrical components for industrial applications, have partnered to electrify Western Canada. Specializing in motor controls and protection for Original Equipment Manufacturers, System Integrators and Panel Builders, Noark Electric… Read More…

  • Mitsubishi Electric Sales Canada Inc. and Efficiency Capital Partner to Cross Promote Low-Carbon Building Solutions in Canada

    Mitsubishi Electric Sales Canada Inc. and Efficiency Capital Partner to Cross Promote Low-Carbon Building Solutions in Canada

    September 23, 2024 Efficiency Capital (EC), Canada’s first Energy-as-a-Service (EaaS) company, and Mitsubishi Electric Sales Canada Inc. (MESCA) announced a strategic cross promotional partnership to make low-carbon building solutions more accessible to building owners and operators across Canada. Energy efficiency in buildings, despite being one of the critical pathways to meet Canada’s climate goals, faces… Read More…

  • Siemens to Carve out Electric Vehicle Charging Business to Enable next Level of Growth

    Siemens to Carve out Electric Vehicle Charging Business to Enable next Level of Growth

    September 23, 2024 Siemens has announced the intention to carve out its eMobility business. The company bundled its eMobility charging activities in 2018 and subsequently organized it into a separate business unit in 2022.  The carve out of Siemens eMobility, which has a strong technological core and portfolio, will give the business entrepreneurial freedom to… Read More…

  • FLO Confirms FLO Station Eligibility for ZEVIP Funding

    FLO Confirms FLO Station Eligibility for ZEVIP Funding

    September 24, 2024 Canada recently announced trade measures impacting vehicles from China and limiting eligibility under the Natural Resources Canada (NRCan) Zero Emission Vehicle Infrastructure Program (ZEVIP) to electric vehicle (EV) charging products manufactured in countries that have negotiated free trade agreements with Canada. Effective October 1, 2024, this directive is expected to have an impact on… Read More…