Survey Says: Who Industrial Electricians Work For

January 13, 2023 This CSA report looks at the experiences of women using personal protective equipment in the workplace, finding gaps that need to be addressed in order to imporve safety for women. CSA explores how physical differences between men and women have been considered in the devolpment of PPE as well as PPE standards…
November 4, 2024 This bulletin provides clarification on permit and certification requirements for work performed on existing light fixtures (luminaires) when upgrading for energy efficiency or converting them to the light emitting diode (LED) type. Qualified persons must apply new labels to the luminaire or the lamp when retrofitting. Procedures for installations within Technical Safety…
A key component of any electronic or electrical system is the cable assembly/cable harness, yet it typically is one of the last components to be addressed. When designing a system the cable assembly should be addressed as early in the design stage as possible to allow for the best design to be specified for the application at hand. Many components will be involved in the assembly design, and each component will have an impact on the performance of the finished cable assembly or wire harness. If an assembly that is either over-designed or under-designed is used, there will be negative consequences of the performance of the finished system.
July 5, 2023 Transitioning to sustainable energy sources is the major challenge of our era. Emission reduction, optimization of consumption, clean energy that is accessible to all, and de-carbonization are some of the challenges to be met in order to preserve the environment and combat energy insecurity. Faced with these many challenges, a host of…
January 13, 2023 This CSA report looks at the experiences of women using personal protective equipment in the workplace, finding gaps that need to be addressed in order to imporve safety for women. CSA explores how physical differences between men and women have been considered in the devolpment of PPE as well as PPE standards…
November 4, 2024 This bulletin provides clarification on permit and certification requirements for work performed on existing light fixtures (luminaires) when upgrading for energy efficiency or converting them to the light emitting diode (LED) type. Qualified persons must apply new labels to the luminaire or the lamp when retrofitting. Procedures for installations within Technical Safety…
A key component of any electronic or electrical system is the cable assembly/cable harness, yet it typically is one of the last components to be addressed. When designing a system the cable assembly should be addressed as early in the design stage as possible to allow for the best design to be specified for the application at hand. Many components will be involved in the assembly design, and each component will have an impact on the performance of the finished cable assembly or wire harness. If an assembly that is either over-designed or under-designed is used, there will be negative consequences of the performance of the finished system.
July 5, 2023 Transitioning to sustainable energy sources is the major challenge of our era. Emission reduction, optimization of consumption, clean energy that is accessible to all, and de-carbonization are some of the challenges to be met in order to preserve the environment and combat energy insecurity. Faced with these many challenges, a host of…
January 13, 2023 This CSA report looks at the experiences of women using personal protective equipment in the workplace, finding gaps that need to be addressed in order to imporve safety for women. CSA explores how physical differences between men and women have been considered in the devolpment of PPE as well as PPE standards…
November 4, 2024 This bulletin provides clarification on permit and certification requirements for work performed on existing light fixtures (luminaires) when upgrading for energy efficiency or converting them to the light emitting diode (LED) type. Qualified persons must apply new labels to the luminaire or the lamp when retrofitting. Procedures for installations within Technical Safety…
A key component of any electronic or electrical system is the cable assembly/cable harness, yet it typically is one of the last components to be addressed. When designing a system the cable assembly should be addressed as early in the design stage as possible to allow for the best design to be specified for the application at hand. Many components will be involved in the assembly design, and each component will have an impact on the performance of the finished cable assembly or wire harness. If an assembly that is either over-designed or under-designed is used, there will be negative consequences of the performance of the finished system.
July 5, 2023 Transitioning to sustainable energy sources is the major challenge of our era. Emission reduction, optimization of consumption, clean energy that is accessible to all, and de-carbonization are some of the challenges to be met in order to preserve the environment and combat energy insecurity. Faced with these many challenges, a host of…
ABB’s Microlectric BP320-A Self-Contained Meter Socket is now available through distribution channels in BC. Launched in 2015, the BP320 is also certified by Hydro-Quebec for use in Quebec, as well as some areas in Atlantic Canada. Read More…
July 14, 2025 The rules for the installation of panelboards, circuits, and bonding in Patient Care Area depends on whether the area is designated as either, Basic Care, Intermediate Care or Critical Care. How are these areas defined? Read more on Section 24 — Health care areas Read More…
July 14, 2025 In May, the total value of building permits issued in Canada rose by $1.4 billion (+12.0%) to reach $13.1 billion. The increase in construction intentions was driven by Ontario’s institutional component (+$1.3 billion). On a constant dollar basis (2023=100), the total value of building permits issued in May increased 11.8% from the previous month and was… Read More…
July 14, 2025 Plan Group is proud to be a partner in the construction of the UHN Surgical Tower at Toronto Western Hospital. Plan Group will provide work on the project in: Mechanical: Plumbing, HVAC, Controls, Medical GasElectrical: Lighting & Controls, Power Distribution, Emergency Generators, UPSTechnology: Structured Cabling, AV Systems including Digital Signage and IPTV UHN’s 15-storey Surgical… Read More…
July 16, 2025 Luxxbox announces the launch of its new Quick Ship Program, designed to provide architects, designers, and project managers in the United States and Canada with expedited access to a curated selection of their most in-demand acoustic lighting products. With a two-week turnaround from order to dispatch, the program ensures that project timelines… Read More…
July 16, 2025 Electrical Cable Supply (ECS), Canada’s largest independently owned wire and cable distributors, is proud to announce its re-certification with the prestigious Platinum designation in Deloitte’s Canada’s Best Managed Companies program for the eighth consecutive year. This announcement recognizes ECS’s sustained excellence in strategy, innovation, culture, and strong financial performance. The Canada’s Best… Read More…
July 16, 2025 Nexans has announced its partnership with Skills Compétences Canada (SCC), a not-for-profit organization that actively promotes careers in skilled trades and technologies. As part of the partnership, Nexans will sponsor WorldSkills Team Canada 2026 as they prepare to compete at the 48th WorldSkills Competition, taking place in Shanghai, China, from September 22 to 27, 2026. “At Nexans,… Read More…
July 14, 2025 With renewed funding by Ontario’s Skills Development Fund, the OEL Apprentice Success Project is now available for another year until March 2026. The project is part of OEL’s Employer Engagement Program (EEP) consisting of wage, training, and equipment subsidies for apprentices. These funding opportunities are available to OEL Members and non-Members. For… Read More…
This project is funded [in part] by the Government of Canada.
Ce projet est financé [en partie] par le gouvernement du Canada.