Establishing When the CE Code Becomes Mandatory

Electricians With Tools

 

Pierre McDonald

Safety requirements are constantly changing. We often see this with the new car ads that come out every model year with manufacturers claiming their vehicle is the safest in its class. Does the same hold true for electricalcodes and standards?Committees work under increasing pressure as a publication deadline approaches, only to finalize safety requirements in a revised document to be “put out there for use by the industry.” Some codes and standards have a history and are expected, while others are new and have yet to be accepted. In both cases these documents are put forward with the anticipation they will contribute to a safer environment.

In June 2015, the Canadian Advisory Council on Electrical Safety(CACES) met at its annual meeting. This council is an influential body regarding electrical safety, and comprises regulatory members representing every province and territory, as well as representatives of certification bodies, Inspection bodies and standard development organizations. They meet to discuss codes, standards, safety issues, and how they can all work together for a safer electrical industry. One of the summary discussions on the agenda was when the regulatory authorities anticipate the newly published Canadian Electrical Code (CE Code) might become a mandatory requirement within each of their jurisdictions.

The CE Code adoption process varies in each jurisdiction as the provinces and territories have the right to mandate electrical safety as they see fit. Some jurisdictions will adopt the CE Code as published while others amend certain requirements to fit their needs. Not only what is adopted differs from jurisdiction to jurisdiction,but the adoption process itself varies throughout Canada. Some jurisdictions have the CE Code automatically come into force after a fixed time has passed from the code publication date, while other jurisdictions consult with stakeholders and users prior to CE Code adoption. This process could vary from a few months to well over a year and perhaps longer, depending on government priorities at the time. Pressure is front and centre for national harmonization of standards and automatic adoption of codes.

With regard to equipment standards, these requirements are basically set through the Canadian Electrical Code Part II standards and those standards published by ULC Standards (see Appendix A of the 2015 CE Code). These standards ensure that equipment installed in conjunction with the CECode will be compatible and safe to use under the installation rules. The following table illustrates the adoption dates as to when the 2015 CE Code has become or will become adopted in the provincial and territorial jurisdictions in Canada. Jurisdictions that have already adopted the 2015 edition CE Code include the Yukon Territory, the Northwest Territory, Manitoba, Nova Scotia, and Newfoundland and Labrador. Others will follow over the next several months
Codes Table

(Note that certain Municipalities also adopt the CE Code outside of provincial legislation, e.g., St John’s, Winnipeg)

While it is anticipated that the CE Code will be adopted within the above time periods, provincial and territorial legislators always have the final decision. Legislative priorities change very quickly, which could result in substantial delays. Legislation is not an exact science;check with the authority having jurisdiction.

Additional information on the CE Code and other codes or standard requirements within each jurisdiction can be obtained by contacting the appropriate provincial or territorial authority.
For contact information on code authorities (building, fire, gas, plumbing, electrical and environmental) responsible for codes in Canada, please use the following link from the ULC website: http://canada.ul.com/codeauthorities/codeauthoritiesincanada/.

So, does the revision and subsequent adoption of electrical codes and standards always make for a safer electrical installation? While this is one piece of the puzzle, a safe installation requires that all puzzle pieces fit together as intended. From the work done by codes and standards committees through the manufacturers, testing and certification bodies, and Installers right down to the end users, electrical safety needs every part to fit together for a safe electrical environment.


Pierre McDonald, CET, is Senior Regulatory Affairs Representative/Répresentant Principal, Affaires Réglementaires, Underwriters Laboratories of Canada Inc. Based in St. Albert, AB, Pierre has been a member of the Canadian Electrical Code Part 1 technical committee as well as several subcommittees including serving as Chair of Sections 6 and 76 and as a member representing regulators on several other CSA committees. Pierre is still active with code development and interpretation.

Other articles by Pierre McDonald:

2015 CE Code: Changes on “Approved Electrical Equipment” 

Code and Public Safety 

Section 62: Fixed Electric Heating Systems 

Now Available: CAN/ULC Standard on Electric Utility Workplace Electrical Safety

UL Code Link 

CAN/ULC-S576-14, Standard for Mass Notification System Equipment and Accessories 

Canadian CE Code Changes: Section 20 and More 

Meeting National Building Code of Canada Requirements 

Conductor Ampacities and Their Temperature Rating 

Codes and Standards – Provincial Legislation and the Administrative Requirements of the CE Code 

Changes to Section 12 Wiring Methods 

Section 4 Conductors — Changes from the Canadian Electrical Code’s 2009, 21st Edition to the 2012, 22nd Edition 

 

Related Articles


Latest Articles

  • The Role of Lighting in the AI-Powered Home

    The Role of Lighting in the AI-Powered Home

    January 14, 2026 Elizabeth Parks, President and CMO of Parks Associates, joins Derek Richardson, Founder and CEO of Deako, for a wide-ranging conversation on how lighting is becoming a core layer of the intelligent home. The discussion explores how Deako’s plug-and-play lighting approach is removing long-standing barriers to adoption by simplifying installation, reducing costs, and Read More…

  • What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    What Canada’s Lighting Pulse Means for Contractors and Plant Buyers in 2026

    January 14, 2025 By John Kerr From the ground, many contractors and plant teams are experiencing the same thing: jobs are there, but they are smaller, more price‑sensitive, and slower to release compared to past years. The Canadian Pulse of Lighting confirms that impression and offers some clear signals about how contractors and plant electrical Read More…

  • Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    Guide to the Canadian Electrical Code, Part 1 – 26th Edition[i] – A Road Map: Section 54

    January 12, 2026 By Bill Burr The Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the Read More…

  • Tom Penton & Magic Lite: Forty Years of Leadership in Canadian Lighting

    Tom Penton & Magic Lite: Forty Years of Leadership in Canadian Lighting

    January 12, 2026 By John Kerr Sales has always been at the core of Magic Lite’s story, because it was at the core of who its founder Tom Penton was. He genuinely loved sales, loved being independent, and consistently gravitated to roles where he could take personal responsibility for results and build his own customer Read More…


Changing Scene

  • Hammond Manufacturing Expands to Western Canada

    Hammond Manufacturing Expands to Western Canada

    January 13, 2026 Hammond Manufacturing have announced that they are opening a new distribution facility in the Southeast of Calgary, Alberta. The new facility includes over 50,000 sq ft of warehouse space. “This addition will better serve our customers in Western Canada and stock volume and larger products to ensure our distributors have an improve stock Read More…

  • ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    ABB Chosen to Supply Technology for BC Ferries’ New Major Vessels

    January 12, 2026 ABB will supply a complete package of power, propulsion and control technology for four new double-ended passenger and car ferries operated by British Columbia Ferry Services (BC Ferries). One of the largest ferry operators in the world, BC Ferries provides year-round vehicle and passenger service on 25 routes to 47 terminals, carrying Read More…

  • Federal Government Invests in Four Ontario Steel Companies

    Federal Government Invests in Four Ontario Steel Companies

    January 12, 2026 Through targeted investments, the Government of Canada is committed to providing support to help businesses in all sectors, including steel and automotive, to respond, adapt and compete amid shifting market conditions. Evan Solomon, Minister of Artificial Intelligence and Digital Innovation and Minister responsible for the Federal Economic Development Agency for Southern Ontario Read More…

  • Craftsman V20 150W Power Inverter Recalled Due to Fire Hazard

    Craftsman V20 150W Power Inverter Recalled Due to Fire Hazard

    January 12, 2026 This recall involves the Craftsman V20 150W Power Inverter (Model number: CMCB1150B). The product has a rectangular prism shape with dimensions of 8.13 x 7.62 x 11.68 cm. It is red and black and weighs 320 grams. It has three charging ports for Type-C, Type-A, and AC connections. It contains an LED Read More…