Appearing below are eight more examples of Canadian Electrical Code changes involving wiring devices and cable management, compiled by Legrand. This is the second of a three-article series on the 22 changes. Watch for Part 3 in the next issue of Electrical Industry News Week.

9. Rule 26-712, Item (A) and Requirement (Vi) Under Item (D) — Receptacles for Dwelling Units

Clarifications to ensure that there are the required number of receptacles installed in kitchens (shown in image).

Rule 26-712 provides details for all the locations in dwellings where receptacles are required, with the intent being to ensure an adequate quantity of receptacles are installed throughout to facilitate the use of electrical appliances while simultaneously minimizing the usage of extension cords. Item (a) and Requirement (vi) under Item (d) have been clarified and aligned to ensure that the method of “determining layout of receptacles in finished walls” as summarized within Rule 26-712, Item (a) is also utilized when referencing dining areas and remaining finished walls that form parts of kitchens as described in Requirement (vi) under Item (d). Prior language required a minimum of one duplex receptacle to be installed within these areas, when in fact the layout method that shall apply in these applications may actually require additional devices.

10. Rule 26-720 —Special Terminology

Definitions for arc-fault protection and related products are provided here.

Pertaining to branch circuits for residential occupancies, the terms arc-fault protection, combination-type arc-fault circuit interrupter and outlet branchcircuit-type arc-fault circuit interrupter are all defined here, as their usage within residential branch circuit applications is becoming more prevalent.

11. Rule 26-724, Item (E) — Branch Circuits for Dwelling Units

Receptacles on individual branch circuits are to be installed in accordance with amended Rule 26-712 (d) (vi).

Formerly addressed in Rule 26-722, Item (e), Rule 26-724, Item (e) provides for alignment with amended Rule 26-712 (d)(vi) by requiring that an individual branch circuit be provided for receptacles installed in dining areas forming parts of a kitchen to allow for the use of high-wattage appliances.

12. Rule 26-724, Item (F) — Branch Circuits for Dwelling Units

Significant expansion within the residential occupancy where AFCI protection is required.

Whereas the earlier Rule 26-722, Item (f) was limited to sleeping facilities within a dwelling unit, amended Rule 26-724, Item (f) now requires that all branch circuits supplying 125V receptacles rated 20A or less be protected by a combination-type AFCI as defined in Rule 26-720. The few exceptions to this rule include those areas where the circuits are required to have ground-fault protection (washrooms, kitchen counter work surfaces), and those areas where there is some likelihood that a nuisance trip would go unnoticed (receptacles for kitchen refrigeration and sump pump applications).

13. Rule 26-724, Item (G) — Branch Circuits for Dwelling Units

Allows for the use of outlet branch-circuit-type arc-fault circuit interrupter (OBC AFCI).

In lieu of the combination-type arc-fault circuit interrupter required in amended Rule 26-724, Item (f), Item (g) summarized here now allows an OBC AFCI to be used, provided that it is installed at the first outlet on the branch circuit, and the wiring method for the portion of the branch circuit between the branch-circuit overcurrent device and the first outlet consists of metal raceway, armoured cable or non-metallic conduit or tubing to provide for added mechanical protection for the circuit conductors.

14. Rule 66-404 — Receptacles

New rule for receptacles located in midways, carnivals, fairs and festivals.

Receptacles having CSA configuration 5-15R or 5-20R that are installed in travelling midways, carnivals, fairs and festivals that are intended to supply loads in outdoor or damp locations shall be protected by a Class A GFCI. Many of these applications utilize cord and plug-connected equipment, where cords are commonly placed or are run through damp and wet locations.

15. Rule 66-456, Subrule (2)(C) — Single-conductor cable connections

New requirement for seal or cap while connector is not in use.

Plug-in connectors for single-conductor cables are still to be of a locking type, and to either incorporate a mechanical interlock to prevent wrong connections or to be colour-coded; however, a new added requirement is that all connections that are not in use are to be covered with an acceptable seal or cap.

16. Rule 66-456, Subrules (5) and (6) — Single-conductor cable connections.

New requirement for seal or cap while connector is not in use.

Plug-in connectors for single-conductor cables are still to be of a locking type, and to either incorporate a mechanical interlock to prevent wrong connections or to be colour-coded; however, a new added requirement is that all connections that are not in use are to be covered with an acceptable seal or cap.

Read Part 1, published in the previous issue of Electrical Industry News Week: https://electricalindustry.ca/latest-news/2389-22-ce-code-changes-related-to-wiring-devices-and-cable-management-part-1.

Read more about Canadian Electrical Code changes.

 

Related Articles


Latest Articles

  • Regulations Amending the Products Containing Mercury Regulations – A Call to Consultation

    Regulations Amending the Products Containing Mercury Regulations – A Call to Consultation

    January 29, 2023 By Line Goyette Under the Canadian Environmental Protection Act, 1999, the Canadian government is proposing the Regulations amending the products containing mercury. Consultation is open until March 9, 2023. The Products Containing Mercury Regulations (the Regulations), which were published on November 19, 2014, and came into force on November 8, 2015, prohibit the manufacture and import of products containing mercury… Read More…

  • A Career with Purpose – Apprentices Building Canada’s Reduced Carbon Future

    A Career with Purpose – Apprentices Building Canada’s Reduced Carbon Future

    January 27, 2023 By Yoana Turnin, Project Manager, EHRC In 2021, Canada joined 120+ other countries in committing to achieving net-zero emissions by year 2050 in an effort to “avert the worst impacts of climate change.” In a few words, that means either reducing or offsetting the economy’s greenhouse gas emissions through electrification, energy efficiency… Read More…

  • Challenges, Opportunity, and Labour Demand in the Construction Industry

    Challenges, Opportunity, and Labour Demand in the Construction Industry

    January 27, 2023 By Blake Marchand There is some uncertainty in the overall market right now, relating to inflation, interest rates, even global events like the war in Ukraine has an impact. These factors will have an impact on the construction industry, which may have an impact on broader opportunities for electrical contractors. Although, anecdotally… Read More…

  • First Retrofit Financed by the Canada Infrastructure Bank Receives IREE Certification

    First Retrofit Financed by the Canada Infrastructure Bank Receives IREE Certification

    January 27, 2023 The Canada Green Building Council (CAGBC) and the Canada Infrastructure Bank (CIB) have announced Dream’s 366 Bay St. redevelopment in Toronto is the first retrofit project financed by the CIB to achieve Investor Ready Energy Efficiency (IREE) certification. IREE certification is part of the CIB’s Building Retrofits Initiative and is administered through… Read More…


Changing Scene

  • Rexel Canada Aquires Lineman’s Testing Labratories of Canada

    Rexel Canada Aquires Lineman’s Testing Labratories of Canada

    Janaury 29, 2023 Rexel Canada aquires Lineman’s Testing Laboratories of Canada Ltd (LTL), a leading provider of high-voltage electrical services and products to the utility and industrial markets based in Toronto, ON and Edmonton, AB. The acquisition, which closed today, will provide Rexel Canada with enhanced opportunities in an attractive and value-added market. The acquisition… Read More…

  • Bartle & Gibson Announces Milwaukee Tool Zones at Three Locations

    Bartle & Gibson Announces Milwaukee Tool Zones at Three Locations

    Janaury 29, 2023 Bartle & Gibson Co. Ltd. announced the addition of three Milwaukee Tool Zones. The Zones include two Milwaukee Tool Red Zones, one at their Calgary North location and one at their Port Coquitlam location, and one Milwaukee Tool Lighting Zone at their Edmonton North location. These Milwaukee Tool Zones are a one-stop… Read More…

  • Electricity Canada and Smart Grid Innovation Network Canada Enter Collaborative Agreement

    Electricity Canada and Smart Grid Innovation Network Canada Enter Collaborative Agreement

    January 27, 2023 Electricity Canada and Smart Grid Innovation Network Canada have entered into a collaborative agreement to share knowledge and create a climate of cooperation that initiates a new direction for both organizations to better serve the professional needs of the members, industry, and community. This agreement will increase collaboration to benefit industry in… Read More…

  • Government of Canada Launches New Intake Model for Zero-Emission Vehicles Infrastructure Funding

    Government of Canada Launches New Intake Model for Zero-Emission Vehicles Infrastructure Funding

    January 27, 2023 The Government of Canada is now accepting applications from not-for-profit organizations, public institutions and governments to locally deliver federal funding from the Zero Emission Vehicle Infrastructure Program (ZEVIP). Applications will be accepted throughout 2023 and 2024. This is yet another step the government is taking to make electric vehicle (EV) charging more accessible for… Read More…