Trent University Launches $15.5 Million Energy Reduction Project

Trent Traill College

 

Jan 07 2016

A two-year project to increase energy efficiency and upgrade infrastructure at Trent University in Peterborough, ON is expected to save the university more than $1.5 million in avoided energy costs annually over a nine-year term. Affecting 26 buildings and 126,000 square metres of space on the Symons Campus and Traill College, the project supports the university’s mandate to enhance environmental sustainability on campus, as well as in the greater community.
The changes will “significantly reduce our carbon footprint by approximately 2,650 metric tonnes of CO2 annually — the equivalent of planting 20.5 acres of trees, or taking 563 cars off the road,” says Dr. Leo Groarke, the university’s President and Vice-Chancellor.
The campus renewal will take place over two years, during which many infrastructure upgrades and energy conservation measures, will be undertaken.

The changes include:
• lighting retrofits
• micro cogeneration
• energy recovery systems
• new and re-commissioned air handling units (AHU)/variable air volume (VAV) conversions
• pool AHU
• HVAC control systems/redesign and equipment
• VSD pumps; heating boilers
• domestic hot water (DHW) boiler replacement and electric heat conversion
Trent University has awarded the $15.5 million contract to Ameresco Canada. Parent company Ameresco, Inc. provides comprehensive services, energy efficiency, infrastructure upgrades, asset sustainability and renewable energy solutions for businesses and organizations throughout North America and Europe.

Trent University Renews Campuses, Reduces Energy Consumption with Partner Ameresco
Over 20 campus buildings to be upgraded to enhance comfort, deliver energy savings and reduce the University’s carbon footprint
FRAMINGHAM, Mass. & TORONTO–(BUSINESS WIRE)–Trent University in Peterborough, Ontario announced today that it has selected Ameresco Canada, a wholly-owned subsidiary of Ameresco, Inc. (NYSE:AMRC), a leading energy efficiency and renewable energy company, to renew and upgrade campus infrastructure through the Campus Renewal Partnership (CRP), a facility-renewal plan funded through energy savings.

The $15.5 million project, which was approved by the Trent University Board of Governors, is expected to save the University more than $1.5 million in avoided energy costs annually for a nine-year term, and includes energy efficiency and infrastructure upgrades to 26 buildings and 126,000 square metres of space on the Symons Campus and Traill College in Peterborough, Ontario. The retrofits are expected to enhance comfort levels in campus buildings, and are in keeping with the University’s mandate to enhance environmental sustainability on campus, as well as in the greater community.

“Trent University is a proud leader in sustainability among post-secondary education institutions,” said Dr. Leo Groarke, President and Vice-Chancellor of Trent University. “By supporting the economic vitality of our neighbouring community while supporting improved learning spaces for our students, this partnership with Ameresco is enabling us to enhance the University environment for our students, faculty and staff, while being more environmentally sustainable and adding value to the entire Peterborough and Trent communities.”

Steven Pillar, Trent’s Vice President, Finance and Administration added, “This project will yield immediate cost-savings for Trent University, but more importantly, it will result in an over-achievement of our energy reduction targets set in our five-year Energy Conservation Plan and a simple payback of nine years. The partnership with Ameresco will create more efficient buildings and reduce our energy use, allowing us to significantly reduce our carbon footprint by approximately 2,650 metric tonnes of CO2 annually — the equivalent of planting 20.5 acres of trees, or taking 563 cars off the road.”

“Ameresco is honoured to be partnering with Trent University to provide budget-neutral solutions that support the University’s sustainability platform and will help the University achieve its sustainability goals,” said Bob McCullough, President of Ameresco Canada. “Students, faculty and staff will not only benefit from the campus improvements, the community will also benefit from lower greenhouse gas emissions.”

The Campus Renewal Partnership will include an approximate two-year construction period, during which many infrastructure upgrades, as well as energy conservation measures, will be undertaken. The following upgrades will enhance the quality of the teaching and learning environments: new and re-commissioned air handling units (AHU)/variable air volume (VAV) conversions, which drastically improve ventilation and air quality; pool AHU; HVAC control systems/redesign and equipment; VSD pumps; heating boilers; domestic hot water (DHW) boiler replacement and electric heat conversion, all improving temperature comfort; lighting retrofits, which are not only more efficient but also improve colour rendition and visibility; micro cogeneration; and energy recovery systems, for more reliable back-up power.

About Trent University
Trent University has a long-standing history of supporting environmental awareness as well as instituting environmentally sustainable practices on campus. Over the last few years Trent has built two LEED-certified buildings, instituted car and bike share programs, and substantially increased locally grown food being served on campus, including from a new on-campus farm. Building on Trent’s recognized leadership in teaching and research in all areas related to the environment, in September 2015 Trent University launched its new School of the Environment, which positions Trent University as Canada’s leading postsecondary environmental institution, offering students the chance to make their mark on this planet in a thoughtful and sustainable way.

About Ameresco
Founded in 2000, Ameresco, Inc. (NYSE:AMRC) is a leading independent provider of comprehensive services, energy efficiency, infrastructure upgrades, asset sustainability and renewable energy solutions for businesses and organizations throughout North America and Europe. Ameresco’s sustainability services include upgrades to a facility’s energy infrastructure and the development, construction and operation of renewable energy plants. Ameresco has successfully completed energy saving, environmentally responsible projects with Federal, state and local governments, healthcare and educational institutions, housing authorities, and commercial and industrial customers. With its corporate headquarters in Framingham, MA, Ameresco has more than 1,000 employees providing local expertise in the United States, Canada, and the United Kingdom. For more information, visit www.ameresco.com.

The announcement of a customer’s entry into or commencement of a project contract is not necessarily indicative of the timing or amount of revenue from such contract, of the company’s overall revenue for any particular period or of trends in the company’s overall total construction backlog. This project was included in Ameresco’s previously reported awarded projects as of September 30, 2015 and is included in our fully contracted backlog as of December 31, 2015.

 

 

Related Articles


Latest Articles

  • Ontario Solar Incentives with Essex Energy

    Ontario Solar Incentives with Essex Energy

    August 20, 2025 Essex Energy is helping municipalities, universities and colleges across Ontario take advantage of incentives under Ontario’s Retrofit DER Program including solar photovoltaic (PV) systems. What’s Available Significant rebates available to eligible businesses and institutional organizations deploying rooftop or parking lot solar PV systems. These incentives are paid upon completion of the project, accelerating project… Read More…

  • Beyond the Bid: How Modern Estimating Solutions Drive Contractor Success

    Beyond the Bid: How Modern Estimating Solutions Drive Contractor Success

    August 18, 2025 By Brooke Stewart In today’s fast-paced construction landscape, electrical contractors are constantly pressured to keep their estimates competitive, often at the expense of healthy profit margins. Compounding this challenge are rising material costs, a shortage of skilled labor and siloed data, all of which make it increasingly difficult to stay competitive and… Read More…

  • Hammond Power Solutions Helps EFC Champion Sustainability as First Carbon Neutral Sponsor at Annual Industry Conference

    Hammond Power Solutions Helps EFC Champion Sustainability as First Carbon Neutral Sponsor at Annual Industry Conference

    August 18, 2025 By Electro-Federation Canada Did you know that carbon emissions from this year’s Annual Industry Conference were offset? With the help of Hammond Power Solutions (HPS), EFC took an important step toward reducing our environmental impact by offsetting the emissions associated with the event. This milestone reflects a growing commitment within the electrical… Read More…

  • FortisBC Detail Impact of their Energy-Efficiency Programs in 2024

    FortisBC Detail Impact of their Energy-Efficiency Programs in 2024

    August 18, 2025 In 2024, FortisBC Energy Inc. and FortisBC Inc.’s (collectively FortisBC) conservation and energy-efficiency programs helped lower gas and electricity use while helping create more comfortable living and working spaces for customers. Building on 2023 reductions, its gas programs cut close to one million tonnes of carbon dioxide equivalent (tCO₂e) 1 in 2024. “Our customers’… Read More…


Changing Scene

  • Blackline Safety Announces Quality Assurance Program Expansion

    August 18, 2025 Blackline Safety Corp. has announced a major expansion of its quality assurance (QA) program. As part of the expansion, the company has increased its QA team, upgraded its inspection equipment, and boosted in-lab testing of its entire product line. Headquartered in Canada with offices in the UK, France, U.S., and UAE, Blackline… Read More…

  • EB Horsman Introcuce New Burnaby Branch Manager

    EB Horsman Introcuce New Burnaby Branch Manager

    August 18, 2025 EB Horsman & Son is pleased to announce the promotion of Sean O’Brien to Branch Manager of their Burnaby location, effective August 6, 2025. Sean brings over 15 years of experience in the electrical and lighting industry, with a strong background in sales, technical leadership, project management, and clean energy initiatives. He… Read More…

  • BCCA Response to “Report on 2026 Budget Consultation”

    BCCA Response to “Report on 2026 Budget Consultation”

    August 18, 2025 BCCA is pleased to receive the Standing Committee on Finance and Government Services’ Report on the 2026 Budget Consultation, and celebrates the emphasis placed on supporting BC’s construction industry and workforce. Chris Atchison, President of the BCCA, spoke to the Committee on the recommendations and priorities of BC’s construction industry. These included:… Read More…

  • NSAA Introduces Mentorship for Women Apprentices Program

    NSAA Introduces Mentorship for Women Apprentices Program

    August 18, 2025 This program is designed to support the retention and progression to certification of women apprentices in the 39 Red Seal Construction or Manufacturing trades. The program pairs women apprentices with experienced tradespeople to provide guidance, career development, and support throughout their apprenticeship journey. The program is for 6 months, with the mentor and… Read More…