Spotlight: Power Over Ethernet

October 21, 2016

Power over Ethernet, or PoE for short, is a technology that is decades old. Ethernet cable has been around for over 40 years now. PoE refers to when both data and low voltage DC power are provided over the same Class 2, Category 5, or better, ethernet cable. The techniques for delivering power over ethernet have been standardized via the IEEE 802.3 family of standards. The newest standard, still under development, is intended to provide for greater energy efficiency and delivery of up to 100 watts. So why are so many people talking about PoE lately?  

There are a number of factors:

1. PoE offers substantial cost and labour savings

2. More power than ever before can be delivered over ethernet cables

3. There are more low power devices than ever before on the market, including LED lighting

4. These devices are sensing and controllable

5. These devices can be networked together

6. The data these devices generate can be uploaded into the cloud for further analysis that can return both greater energy savings and operational business efficiencies

Taken together, all of these advancements represent a huge business opportunity for electrical contractors as the world moves towards an Industrial Internet of Things (IIoT).  

What sort of devices?

Here is a list of 10 types of devices that represent work opportunities for electrical contractors:

  1. sensors
  2. controls
  3. lights
  4. Wi-Fi systems
  5. Li-Fi systems (data communication through light)
  6. network routers
  7. communications
  8. audio
  9. video
  10. security

What sort of functions? Here is a list of 10 functions that PoE devices can provide:

  • lighting
  • temperature
  • humidity
  • data
  • safety
  • access control and threat detection
  • occupancy
  • energy efficiency
  • operational effciency
  • location services

It’s not too late if you haven’t begun looking into low voltage work opportunities. Low powered device offerings and related services will continue to rapidly grow over the coming years. 

 

For more information on PoE, see the following online resources listed below: 

The last two articles were published in 2008 and are a bit dated, but they are still a useful primer.

 

This article was first published online by National Electrical Contractors Association, Business Development: www.necanet.org/contractor-resources/hot-topics/topic/article-view/neca-bizdev/2016/08/16/spotlight-power-over-ethernet.

 

 

Related Articles


Latest Articles

  • NETCO 2024 Conference in Victoria: The Evolution of the Electrician

    NETCO 2024 Conference in Victoria: The Evolution of the Electrician

    September 20, 2024 The Evolution of the Electrical Industry was Showcased eariler this month in Victoria, BC with the 2024 installment of NETCO’s Annual Conference Leaders and experts from the electrical industry will gather in Victoria, BC, September 5-6th, at the picturesque Inn at Laurel Point for the annual National Electrical Trade Council (NETCO) educational… Read More…

  • Desdowd Icon Patrick Marion Retires

    Desdowd Icon Patrick Marion Retires

    September 20, 2024 On September 11, more than 200 industry guests and colleagues celebrated Patrick Marion’s 35-year career history to the day. Guests travelled from across the country – some from as far as Vancouver and Halifax – to join those from Montreal and Toronto to celebrate Patrick’s career. Held at a prestigious golf club… Read More…

  • EFC Letter on China Tariffs

    EFC Letter on China Tariffs

    September 15, 2024 The Canadian federal government intends to apply a 25 per cent surtax on imports of steel and aluminum products from China, effective October 15, 2024. See announcement here. The initial list of impacted goods was released for public comment and submissions are due September 20, 2024.  The list of products is available… Read More…

  • Changing How we Build Homes: A Year of the Housing Accelerator Fund

    Changing How we Build Homes: A Year of the Housing Accelerator Fund

    September 15, 2024 The Government of Canada is highlighting key results that have come from the first Housing Accelerator Fund since the start of the Program. This week marks the closure of the application portal for the second round of the HAF. HAF was created to incentivize local governments to implement structural and lasting reforms that will increase… Read More…


Changing Scene

  • Southwire Signs Contract for Solar System at North Campus Plant

    Southwire Signs Contract for Solar System at North Campus Plant

    September 20, 2024 Southwire is pleased to announce that it has signed an agreement with Statewide Renewable, a solar project developer, to install a solar array at its North Campus Plant.  The company has a long-standing commitment to environmental stewardship and corporate sustainability, and in support of that commitment, is investing in renewable energy as… Read More…

  • Schneider Electric Foundation Turns 25 and Launches the ‘25 Years Young’ Campaign in Canada

    Schneider Electric Foundation Turns 25 and Launches the ‘25 Years Young’ Campaign in Canada

    September 20, 2024  To mark the 25th anniversary of its foundation, Schneider Electric is launching a global campaign in celebration of both this key milestone and the next generation of young leaders committed to building a fairer, low-carbon society. Non-profits could win a 50K€ grand prize and one of five local prizes totaling 75K€ to… Read More…

  • New Funding Announced to Install Over 3,000 EV Chargers Across Canada

    New Funding Announced to Install Over 3,000 EV Chargers Across Canada

    September 20, 2024 The federal government has announced investments of $14.9 million for 20 projects that will install more than 3,000 EV chargers across Canada, while raising awareness of the benefits of EVs and advancing training and code upgrades to ensure more communities have access to current information and opportunities to seize the potential of… Read More…

  • ECABC Statement on the Response to BC Hydro’s Call for Clean Power Projects

    ECABC Statement on the Response to BC Hydro’s Call for Clean Power Projects

    September 20, 2024 Electrical Contractors Association of British Columbia President Matt MacInnis issued the following statement on the response to BC Hydro’s call for clean electricity project proposals: “It is very encouraging to see the private sector bring forward projects offering nearly three times the generation capacity BC Hydro is seeking in this first call… Read More…