As an indispensable basic concept for all reflections on protective technology in low‐voltage installations, the concept of security is widely recognized today as “freedom from unacceptable damage risks.”

This means that safety is freedom from every unacceptable damage risk, and enables the classification of situations as “safe” or “dangerous.” The purpose of planning and implementing low‐voltage installations is to achieve safety while excluding risks.

Since many discussions that have been held on the topic of clearly delimiting safety, and risks have been known for years in professional circles, only a few core statements will be elaborated here.

The relationship between risk and safety is represented in the figure below.

Safety 2

 

 

 

 

 

 

 

 

 

Principles of safety philosophy for low‐voltage installations and low‐voltage equipment from a technical risk perspective. Reduction of the residual risk through additional measures that lead to clearly falling below the highest acceptable risk (“limiting risk”) towards increased safety.

In practice, taking adequate measures when planning and making equipment (e.g., low‐voltage switchgear assemblies) ensures that any risk that remains after the application of protective measures is as low as possible, and under no circumstances higher than the highest acceptable risk.

This highest acceptable risk, often called “limiting risk,” must be achieved with every switchgear assembly; in this respect, all measures that contribute to achieving this limiting risk constitute minimal risk reduction measures. The requirements set forth in generally accepted technical standards define those minimal protection requirements.

This highest acceptable risk may not under any circumstances be confused with the concept of residual risk because any technician entrusted with safety‐relevant work must strive to keep the residual risk, which can never been completely excluded even when applying technical measures, well below the highest acceptable limit (i.e., as far as possible driving it in the direction of safety).

7 reasons for implementing safety precautions

There are many reasons for implementing measures in low‐voltage switchgear combinations that go beyond the highest acceptable risk in the direction of higher safety. Here are seven, based on practical experience:

• during the production, installation or maintenance in the switchgear assembly, conductive materials or assemblies may be left behind by mistake (“forgotten”)
• undetected material defects may exist or have been created during processing in the switchgear assembly.
• small animals such as mice or snakes getting into the switchgear assembly
• use of a switchgear assembly unsuitable for the application, which may lead to overheating and subsequently to internal arcing
• unsuitable operating conditions (e.g., ambient temperature, humidity)
• incorrect operation
• insufficient servicing and/or timeouts during preventative maintenance

Switchgear assemblies that only fulfil the minimum requirements are very likely to fall below the highest acceptable risk when one of the events above occurs. Additional action can reduce the extent of damage in the installations and/or business interruptions. This also applies to injuries that may be sustained by employees who work in or near the plants. As it were, the low‐voltage switchgear assemblies equipped with additional measures have some kind of “safety reserve.”

Risk and consequential damage

Reflections on the minimal residual risk that can be achieved through technical measures, especially in commercially and/or industrially used plants, must occur against the background of the possible consequential damage to be expected.

Consequential damage includes costs that arise during business interruptions. Business interruptions in manufacturing companies can arise from a number of causes (e.g., shortage of raw materials, unplanned downtime as a result of occurring malfunctions caused by mechanical, electrical or control issues).

However, consequential damage also includes costs that among other things arise as a result of an insufficiently reliable power supply (e.g., through nuisance tripping of protective equipment during storms).

Safety 3

 

 

 

 

 

 

 

 

 

 

Consequential damages (cost types) in the case of downtime of electrically powered production or processing plants

Without claiming to be exhaustive, major components of possible consequential damages are summarized in the chart above.

Of particular significance are business interruptions that occur as a result of a failure of power supply following damage or partial or complete destruction of the power distribution system (substation, main distribution boards and sub‐distribution boards, cables and wiring systems). The particular significance of this group of business operations is that downtime costs and additional costs strongly increase with increasing length of interruption. In many cases, short‐run servicing of the plant and the replacement of the operating equipment necessary for servicing (e.g., circuit breakers, bus systems) is not possible.

In Part 2: consequential damage and its costs.

Alfred Mörx is the owner of diam‐consult, a consulting engineering office for physics focusing on risk analysis and protective technology in complex technical systems, since 2001. He studied technical physics at the Vienna University of Technology. As an expert for basic electrotechnical safety matters, he has been working in national, European, and international teams in the area of safe electricity application for more than 25 years; www.diamcons.com; am@diamcons.com. This article was previously published as an Eaton white paper:
www.eaton.eu/ecm/groups/public/@pub/@europe/@electrical/documents/content/pct_1595882.pdf

 

Related Articles


Latest Articles

  • Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    Ottawa Day 2026: EFC Members Engage with Parliamentarians on Canada’s Electricity Future

    March 16, 2026 By Electro-Federation Canada Following EFC’s recent update on our 2026 Ottawa Day, we are pleased to share photo highlights from two days of engagement on Parliament Hill, where members met with federal decision-makers to discuss the future of Canada’s electricity system. More than 40 EFC member leaders and Government Relations representatives travelled Read More…

  • Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    Industrial Construction Intentions Drive Increase in Non-Residential Sector in January

    March 13, 2026 In January, the total value of building permits issued in Canada increased $607.0 million (+4.8%) to $13.3 billion. The increase was led by the non-residential sector (+$464.0 million) and supported by the residential sector (+$143.0 million). On a constant dollar basis (2023=100), the total value of building permits issued in January rose 4.3% from the previous month Read More…

  • Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    Multi-Unit Construction Drives Growth in December Residential Construction Investment, 2025 Review

    March 13, 2026 The total value of investment in building construction increased $442.9 million (+1.9%) to $23.7 billion in December. The residential sector grew 2.4%, while the non-residential sector edged up 0.6%. Year over year, investment in building construction grew 12.2% in December. On a constant dollar basis (2023=100), the total value of investment in building construction in December rose 1.7% Read More…

  • 5 Strategic Reasons to Attend the Lumen Exhibition

    5 Strategic Reasons to Attend the Lumen Exhibition

    March 13, 2026 In a market where deadlines are tight and projects are increasingly complex, staying competitive is no longer just about technical skills. It also depends on having the right tools, the right information, and the right partners by your side. The Lumen Exhibition is more than just an event—it’s a strategic lever designed to Read More…


Changing Scene

  • Blackstone Announces Agreement to Acquire Arlington Industries

    Blackstone Announces Agreement to Acquire Arlington Industries

    March 20, 2026 Blackstone and Arlington Industries announced that funds managed by Blackstone Energy Transition Partners have entered into a definitive agreement to acquire Arlington. Founded in 1949, Arlington designs and manufactures a range of electrical products such as fittings, enclosures and other components. The company’s innovative solutions are used across commercial, industrial and data Read More…

  • A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    A New Guillevin.com, Designed to Simplify Your Purchasing Experience

    March 16, 2026 Guillevin.com was built as a digital working tool, designed to support the way their customers plan, search for, and purchase products today. The goal is simple: to offer a fast, reliable, and intuitive online platform capable of supporting real-world operations; both on the job site and in the office. A platform built around Read More…

  • Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    Nova Scotia Strengthens Housing Legislation to Accelerate Supply

    March 13, 2026 Amendments to existing legislation will mean more housing, improved efficiency in the sector and better alignment of related agencies. The changes extend the Executive Panel on Housing in the Halifax Regional Municipality and give the Minister of Housing new authority to ensure housing projects aren’t delayed. “We are strengthening how we plan, Read More…

  • BC Introduces Public Sector Construction Projects Procurement Act

    BC Introduces Public Sector Construction Projects Procurement Act

    March 13, 2026 Kiel Giddens, MLA for Prince George-Mackenzie and Critic for Labour, has introduced the Public Sector Construction Projects Procurement Act, legislation aimed at ensuring publicly funded construction contracts are awarded through labour-neutral, merit-based procurement. “Here’s the simple question: if labour shortages are driving cost overruns, why would government limit who can work on public projects?” Read More…