What Are the Testing Requirements for LED Lumen Maintenance?

Testing Requirements for LED Lumen Maintenance

May 26, 2019

Partners may claim an LED lumen maintenance percentage at 25,000 hours, 15,000 hours, or 10,000 hours as an optional metric. An in-situ temperature measurement test (ISTMT) and LED light source lumen maintenance test, conducted in accordance with the IESNA LM-80-2008 Approved Method for Measuring Lumen Maintenance of LED Light Sources, must be uploaded.  

ISTMT

The ISTMT follows all requirements of the appropriate ANSI/UL standard, with the following addition: one or more additional thermocouples are attached to the highest LED drive current in the luminaire or lamp may be up to 5% greater than the LM-80 drive current for the corresponding LM-80 case temperature.

The most common standards and the product types they cover are

    • ANSI/UL 1598: luminaires
    • ANSI/UL 1993: self-ballasted lamps and lamp adapters
    • ANSI/UL 153: portable electric luminaires
    • ANSI/UL 1574: track lighting systems
    • ANSI/UL 2108: low-voltage lighting systems
    • ANSI/UL 8750: LED equipment for use in lighting products

For more information about proper ISTMT test environment and thermocouple attachments, please see pages 18-20 of the DOE Energy Star Manufacturer’s Guide for Qualifying Solid State Lighting Luminaires, Version 2.1.

In keeping with past DOE guidance for the Energy Star solid-state lighting program, LED Lighting Facts will accept ISTMT test reports from laboratories that meet one of the following requirements:

    1. an Occupational Safety and Health Administration (OSHA) Nationally Recognized Testing Laboratory (NRTL).  For a list of laboratories, visit www.osha.gov/dts/otpca/nrtl/
    2. a laboratory recognized through UL’s Data Acceptance Program (DAP)

For more information, visit www.ul.com/global/eng/pages/offerings/services/programs/dap/   

LM-80

IESNA LM-80 Approved Method for Measuring Lumen Maintenance of LED Light Sources defines the test procedure for obtaining lumen maintenance data for LED light sources.

An LM-80 report must come from a laboratory accredited for LM-80 testing through NIST’s NVLAP program or a laboratory accredited for LM-80 testing through an accreditation body that is an International Laboratory Accreditation Cooperation (ILAC) Mutual Recognition Arrangement (MRA) signatory. For more information about ILAC MRA signatories, visit www.ilac.org/ilacarrangement.html  

Regarding the content and application of LM-80 reports in support of submissions to LED Lighting Facts, the program defers to guidance published in September 2011 by Energy Star, with some exceptions.

See the LED Lighting Facts Partner Participation Manual for details.

Related Articles


Latest Articles


Changing Scene

  • Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    Rexel Canada Welcomes Rexel USA Agreement to acquire Genuine Cable Group

    October 19, 2026 “Rexel Canada welcomes Rexel USA agreement to acquire GCG (Genuine Cable Group)—a transformational step that will strengthen our capabilities, expand our reach and support continued growth across Canada, North America and global markets,” Rexel Canada CEO, Jeffrey Moyle announced on LinkedIn. GCG is a leading specialty infrastructure platform providing wire and cable,… Read More…

  • Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    Ontario Announces Additional Funding for Training Seats for In-Demand Careers

    October 19, 2026  The Ontario government has allocated 40,000 new funded seats at publicly assisted colleges and universities to connect more students to good-paying, in-demand careers. This allocation, which is part of a broader $1.7 billion investment to support a total of 70,000 new seats, supports the province’s plan to protect Ontario and build a… Read More…

  • QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    QEII Halifax Infirmary Tower Project Reaches Milestone, Wins Collaboration Award

    October 19, 2026 Construction of the new acute care tower at the QEII Halifax Infirmary has reached another milestone, with the Level 8 podium structure now in place. The podium is the lower, wider portion of the building that forms the base of the 14-storey acute care tower. It will house a range of hospital… Read More…

  • Ontario Starts Major Construction on Grimsby GO Station

    Ontario Starts Major Construction on Grimsby GO Station

    October 19, 2026 The Ontario government has awarded a contract for major construction on Grimsby GO Station, marking another milestone in its plan to protect Ontario by building the transportation infrastructure needed to reduce gridlock, shorten travel times and support economic growth across the province. Expected to be completed in the second half of 2027,… Read More…