Don’t Underestimate Your Estimating System’s Potential

Shawn McCadden

Shawn McCadden

Knowing what to charge clients for the work you do is often the difference between long-term success and eventual failure for the business. Many contractors look at estimating simply as a way to determine the cost of a project. In the traditional design-bid model of project delivery, this simplistic approach may work, assuming your price generates enough gross profit to cover your overhead and profit requirements. However, if your current estimating system is limited to only producing the number you charge clients for a project, you may be missing out on many other possible benefits.

First, a few assumptions

By gathering the material, labour, equipment and possible subcontractor costs of a project, contractors determine the direct cost of a project and then use a mark-up amount to determine the sell price for a project.For the sake of this discussion, we must also assume that the contractor has created a business budget. By knowing or predicting the costs of being in business for a predicted sales volume and adding in a net profit requirement, the contractor can determine burdened labour costs and know the company’s mark-up requirement over and above direct costs. We must also assume the estimator knows how to estimate and has experience estimating the kind of work the business performs. Your estimating system must become a tool that facilitates how you do business, not just a way to get to the price.

An estimating system should
• be fast and easy to use. Typically, the yellow pad and calculator method does not apply here. A computerized system allows the estimator to concentrate on estimating, not adding up numbers over and over again to gain or confirm confidence in the end result
• allow for on the spot “what-if” adjustments. The estimator must be able to quickly estimate the effects of any changes or suggested alternatives to the project during design.

By having this ability, the client’s decisions during design are better qualified by simultaneously knowing the financial impacts of those decisions
Estimating must be accurate and adequately detailed

To increase accuracy, estimating should be done so it is comparable to the company’s job costing system. Information within the estimate, and job costing, should be broken down to a level of detail that allows the insight you need to make future estimating adjustments.

Estimating in one computer program then job costing in another may become cumbersome, or may not work at all. Accounting programs will often allow job costing, but not estimating. Typically, after a project is sold, a summary of estimating information is entered into the accounting package as a budget for purposes of job cost comparison. This limitation does not allow for fast estimating or what-if adjustments. Also, it may not be easy, secure or wise to allow an estimator access to the company’s accounting information.

The formatting of each individual estimate, as well as the overall estimating system format, may be the most important consideration. How information is entered into the estimate can limit or expand how it can be used or who uses it. Strive for a format that allows the information created by the estimator to be shared throughout the company. If you build your estimate the same way you build the project, step by step, you can create a critical path for how the project will be produced. This can be a huge benefit to supervisors and others. A predefined path, showing labour and material breakdowns, allows your team to predict and schedule resources including subs, material lists, material lead times, just on time material deliveries, and overall labour requirements.

If done correctly, you can also use individual project information to create one master schedule for all company projects and resources. You will know when you need which employee or sub, depending on skills or abilities, and identify schedule conflicts or shortfalls before they occur. This critical path can also help identify cash flow needs during the project while assisting in generating payment schedules.

Separate costs and quantities

Another formatting consideration is how you break apart the information for each line item inside your estimate.Rather than enter lump sum amounts for materials and or labour, separate the costs and the quantities. By formatting your information in this way you can quickly apply what-if options for material substitutions, other material changes, and/or additional labour considerations for any changes. This also facilitates quick pricing updates when a client calls back two years later and wants to go ahead with the project.There’s no need to redo the entire estimate because you’re not sure how the lump sums were determined, just check for pricing changes as the quantity will likely still be the same.


Read more in EIN from Shawn McCadden:

3 Ways To Get Fewer Leads But Close More Remodeling Sales
Don’t Underestimate Your Estimating System’s Potential
Tips on Ball Park Pricing and Charging for Estimates
Is A Contractor Really a Salesperson If He or She Hits Send?
3 Ways To Get Fewer Leads But Close More Remodeling Sales
3 Simple Steps to Covering an Employee’s Non-Productive Time
Setting the Example: Getting Employees to Think Like Owners
Comparing Contractor Mark-ups Can Be Pointless and Very Risky
Don’t Put Your Business At Risk By Guessing At What Mark-up
Simple Profit Sharing Plan for Contractors

Check out Shawn’s website http://www.shawnmccadden.com/ and blog www.shawnmccadden.com/Subscribe-to-The-Design-Builders-Blog.

* “Understanding what impacts your construction company’s reputation,”

http://www.pn-projectmanagement.com/construction-management-tips/understanding-what-impacts-your-construction-companys-reputation

 

Related Articles


Latest Articles

  • ECAO Tariff Tracker

    ECAO Tariff Tracker

    March 7, 2025 ECAO is closely monitoring the evolving tariff battle between Canada and the US. ECAO are staying in touch with their industry partners and legal resources, and continually monitoring news feeds. In addition, they will be meeting with affiliate partners, suppliers and other industry players to plan implementation of possible solutions, to advise… Read More…

  • Canadian Chamber of Commerce Canada-US Trade Tracker

    Canadian Chamber of Commerce Canada-US Trade Tracker

    March 7, 2025 A 25% tariff would severely harm the unique Canada-U.S. trading relationship, hurting workers and businesses on both sides of the border. Tariffs would raise the costs for consumers, further compounding affordability problems. Canada is a critical and reliable partner, supplying energy, critical minerals, autos and other essential inputs for U.S. companies and… Read More…

  • Goal Zero 4x HPP to 1x HPP+ Solar Series Combiner recalled due to fire hazard

    Goal Zero 4x HPP to 1x HPP+ Solar Series Combiner recalled due to fire hazard

    March 7, 2025 Goal Zero 4x HPP to 1x HPP+ Solar Series Combiner Issue Consumer products – Fire hazard What to do Immediately stop using the recalled product and contact Goal Zero for a refund. Affected products This recall involves the Goal Zero 4x HPP to 1x HPP+ Solar Series Combiner model 98715 with UPC… Read More…

  • Free Pre-Apprenticeship Training Program at Mohawk Collage

    Free Pre-Apprenticeship Training Program at Mohawk Collage

    March 7, 2025 The Mohawk pre-apprenticeship program is funded by the Ministry of Labour, Immigration, Training and Skills Development, for eligible individuals. How it works Benefits Admission Requirements To be considered for a pre-apprenticeship training program at Mohawk College, you must: Go HERE for more information Read More…


Changing Scene

  • IDEAL Electrical™ Unveils Fresh, Modern Brand Identity

    IDEAL Electrical™ Unveils Fresh, Modern Brand Identity

    March 7, 2025 IDEAL Electrical was the first company to obtain a patent to make and sell wire connectors in the United States 96 years ago this month – and today IDEAL® announces a modern look for the brand, which captures the company’s spirit of relentless innovation and the optimistic future of the electrical trade. … Read More…

  • Noramco Announce Promotion at London Branch

    Noramco Announce Promotion at London Branch

    March 7, 2025 Noramco has announced the promotion of Erika Liddle to Commercial & Industrial Account Manager – London. “Since joining us in September as Sales Support, Erika has embraced every challenge with determination, quickly making a strong impression. Her ability to learn, adapt, and build meaningful relationships with our customers has set her apart…. Read More…

  • Leviton Canada Unveils New Conveyor System at the Canadian DistributionCenter in Pointe-Claire, Quebec

    Leviton Canada Unveils New Conveyor System at the Canadian DistributionCenter in Pointe-Claire, Quebec

    March 7, 2025 Leviton Canada is thrilled to announce the unveiling of their new conveyor system at the Pointe-Claire (Quebec) distribution center, designed to boost efficiency and enhance service for their valued customers across Canada. With cutting-edge automation and improved accuracy, we’re ready to handle your orders faster and more reliably than ever before. This… Read More…

  • ESA President and CEO Named One of Canada’s Top Women in Safety

    ESA President and CEO Named One of Canada’s Top Women in Safety

    March 7, 2025 The Electrical Safety Authority (ESA) is proud to announce that Josie Erzetic, President and CEO at ESA, has been named one of Canada’s Top Women in Safety by the Canadian Occupational Safety (COS) magazine for 2025. The awards recognize exceptional female leaders who shatter glass ceilings while influencing the health and safety… Read More…