Case Study: Temporary Power for Large Scale Residential Construction

Temporary Power

Ever wonder how large construction projects with sales offices and show suites get power when there is only a generator or temporary power established on the construction site?TheBC Safety Authority (BCSA) pays close attention to these types of installations, since fire alarms, sprinklers, and other building code safety systems are not up and running during the construction phase of the project.

Recently, a BCSA safety officer conducted an assessment of a large multi-family residential site under construction. Working collaboratively with electrical contractors, other trades, safety officials, utilities, and building departments to reach safety solutions is an important part of a BCSA safety officer’s role.

During the inspection, several significant hazards were found.Most notably, townhouses had been energized using the temporary construction service, creating a risk of overload to the service. Had these dwellings become occupied, this could have resulted in a serious fire and shock hazard.

An additional hazard was created by the power cable used to provide power from the temporary distribution system to the townhouses, which was not installed with the necessary mechanical protection.Construction sites typically have heavy machinery operating and it is imperative that the power cables be installed in a manner that protects them from mechanical damage.A break in the armoured cable can result in either a fire (if combustible material is near by) or a shock hazard if the bonding provisions have been compromised.

Addressing the hazards
The safety officer first documented his findings in a certificate of inspection and contacted the electrical contractor to develop a plan to rectify the identified non-compliances.The contractor submitted an application for a variance, as required by the Safety Standards Act, to energize the show rooms and sales offices.The variance included a request to energize a specific portion of the site, and outlined the wiring method used to provide power to this area of the site, and the signage required at strategic locations on the site, including mark ups on the site’s safety plans.The safety officer granted the variance and the electrical contractor completed the installation and the obligations outlined in the variance.

To reduce the safety hazards on the site, branch circuits inside each dwelling had all unnecessary circuit conductors disconnected from circuit breakers. The heavy loads such as space heating, furnaces, dryers, ranges were also disconnected.The safety officer then informed BC Hydro and the electrical contractor that a “hold connection” be placed on the permanent installation permit.This ensures that when the permanent installation is ready for power, the necessary work is completed to transfer and disconnect the temporary power in the showrooms to remove the risk of a possible back feed.

When dealing with sites that have both permanent and temporary electrical systems, closely review your electrical code, specifically the stating that interconnection of temporary power installations and permanent installations shall not be interconnected unless by special permission.

This article was first published online by the BC Safety Authority, http://safetyauthority.ca.

 

Related Articles


Latest Articles


Changing Scene

  • PataBid Nominated for Canadian Choice Award in Software Services

    PataBid Nominated for Canadian Choice Award in Software Services

    October 11, 2024 PataBid is proud to announce its nomination for a Canadian Choice Award in the Software Services category. This recognition highlights PataBid’s commitment to supporting the electrical contracting community across Canada by providing innovative estimating software solutions that streamline estimating processes and ensure predictable and profitable projects. “As a homegrown leader in construction… Read More…

  • EHRC Awards of Excellence Nominations

    EHRC Awards of Excellence Nominations

    October 10, 2024 The Awards of Excellence recognizes and celebrates the outstanding accomplishments of employees, leaders and teams making a positive and tangible impact on their organization while contributing to the composition of a highly skilled workforce in the electricity industry. Nominations Are you an individual or organization looking to recognize an individual leader, team… Read More…

  • New Retrofit Program Set to Accelerate Sustainable Buildings in Alberta

    New Retrofit Program Set to Accelerate Sustainable Buildings in Alberta

    October 10, 2024 The Pembina Institute is pleased to announce its collaboration with the Alberta Ecotrust Retrofit Accelerator, a new retrofit program designed to bring affordable, energy-efficient solutions to support Alberta’s building owners and managers of multi-unit residential and commercial buildings, as well as municipalities, universities, schools and hospitals. In collaboration with industry experts, practitioners,… Read More…

  • Lumen Marks Expansion of Laval Distribution Centre

    Lumen Marks Expansion of Laval Distribution Centre

    October 10, 2024 Lumen highlighted the official inauguration of their Laval Distribution Centre on LinkedIn. “On September 13th, we officially inaugurated the expansion of our Laval distribution centre! This landmark event brought together more than 3000 customers, suppliers, ministers and journalists from all over Quebec to discover our new facilities,” said the company on LinkedIn…. Read More…