Guide to the Canadian Electrical Code, Part I*

William (Bill) Burr

May 9, 2021

By William (Bill) Burr

Section 34 – Signs and Outline Lighting, as outlined in Rule 34-000 Scope, is a supplementary or amendatory section of the code and applies to incandescent lamps, fluorescent lamps, high-voltage luminous discharge (cold-cathode or neon) tubes, high-intensity discharge lamps and other light-emitting sources such as LEDs. The CEC Handbook has a good diagram of a typical sign installation.

Rule 34-002 denotes some special terminology that applies to this section: GTO sleeving, Neon supply and Sign.

General requirements

Rule 34-100 requires that each sign and outline lighting system must have a disconnecting means that must be

• integral with it

• capable of opening all ungrounded conductors

• suitable for the installation environment

• located within sight and within 9 metres of it or be capable of being locked in the open position

Rule 34-102 requires that the disconnecting means and other control devices for transformers and ballasts be approved for the purpose or have a current rating not less than twice the rating of the neon supply, transformer or ballast.

Rule 34-104 specifies that thermally protected ballasts are required for all signs, and outline lighting with fluorescent lamps, except for simple reactance type ballasts.

Rule 34-106 requires that signs, outline lighting and supports be located so that there is no contact, or interference or proximity that can cause a hazard with overhead conductors and electrical and communications utility lines. In addition, a sign or outline lighting system, except for the support, must be a minimum of 2.2 meters above grade. This does not apply to free-standing signs, indoor signs and outline lighting installed in show windows and similar locations, providing they are approved for the location or have mechanical protection.

Rule 34-108 requires that poles, masts standards or other devices used as electrical raceways must be approved for the purpose except when used for mechanical support only.

Rule 34-110 requires that all conductive non-current-carrying parts of a sign or outline lighting installation, including non-electrical equipment that the sign is mounted on, except for small metal parts, metal wire ties securing neon tubing, and systems supplied by a class 2 power supply, be bonded to ground in accordance with Section 10 – Bonding and Grounding.

Rule 34-112 requires that sign leads that pass through the surfaces or partitions must be protected by non-combustible bushings.

Rule 34-114 specifies that fuseholders and flashers be enclosed and accessible without removing obstructions or dismantling the sign.

Enclosures

Rule 34-200 requires that neon supplies, switches, timers, relays, sequencing units and similar devices must be in suitable electrical enclosures (information on the construction of enclosures is contained in Appendix B).

Rule 34-202 requires that uninsulated parts that are accessible to authorized persons be protected by doors or covers with interlocks or require non-ordinary tools to open.

Neon supplies

Rule 34-300 limits the rated secondary open-circuit voltage of a neon supply to 15000 v and 7500 volts-to-ground.

Rule 34-302 requires secondary-circuit ground fault protection on neon supplies, except for

a) transformers with isolated secondaries and maximum open-circuit voltage of 6000v between leads or terminals

b) integral glass or porcelain secondary tube housing with no secondary circuit field wiring

Rule 34-304 limits open-type and core-and-coil type transformers to dry locations only.

Rule 34-306 requires that neon supplies used or installed in damp or wet locations as defined in Section 0 – Definitions must be wet or damp type as per 2-024 and 2-400.

Rule 34-308 governs the installation of neon supplies and requires that they are installed in locations that are accessible, capable of being removed or replaced, and rigidly secured. Where installed in an attic, bulkhead or similar location, an access door measuring not less than 900mm high by 600mm wide, and a 300mm wide permanent walkway to each component, must be provided.

Rule 34-310 specifies that the rating of overcurrent devices protecting neon supplies be a maximum of 30 amps or as per Rule 8-104 for two or more supplies and must be of the weatherproof type if exposed to the weather. Any additional overcurrent devices may be placed inside or outside the sign structure.

Rule 34-312 notes that high-voltage outputs of neon supplies may not be connected in parallel or series with the output of any other neon supply.

Wiring methods

Rule 34-400 provides extensive detailed requirements for the installation of high-voltage cables in accordance with the rules of Section 12 and Table 15 and includes:

a) type and minimum sizes of raceways and cables

b) minimum separation from combustible material

Rule 34-402 requires that high-voltage cables in show windows and similar locations must be

a) enclosed in approved GTO sleeving

b) have a minimum separation of 38mm form combustible and conducting material

c) be located so as not subject to mechanical damage

d) not used to support the sign

Rule 34-404 specifies that the length of high voltage cable from neon supplies shall be as short as practicable except not more than 6 metres installed in metal raceway, and 16 metres installed in non-metallic raceway.

Rule 34-406 requires that connection of high-voltage cables to neon tubing must be inaccessible to unauthorized persons, and made by an electrode receptacle or a connection in an enclosure, approved for the location, with minimum conductor insulation extensions of 100 mm for damp or wet locations and 65mm for dry locations.

Rule 34-408 allows flexible metal and liquid-tight flexible metal conduit enclosing high-voltage cables between electrode receptacle assemblies and neon supplies to serve as the bonding means (conductor) for the metal electrode receptacle assembly, provided it terminates in a secure bonding connection (Rule 10-610). Where non-metallic conduit is used to enclose high-voltage cable, the bonding conductor must be installed exterior to the conduit and a minimum distance from conduits of 38 mm on installations operating at 100 Hz or less, 44 mm on installations operating at more than 100 Hz, and not smaller than no. 12 AWG.

The CEC Handbook has a good diagram of bonding for enclosures of high-voltage cable in non-metallic conduit for metal electrode assembly housing.

In the next installment, we will be discussing Section 36 – High-voltage Installations.

William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.

* Source: CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. © 2021 Canadian Standards Association. Please visit store.csagroup.org. With the permission of CSA Group, material is reproduced from CSA Group standard CSA C22.1:21, Canadian Electrical Code, Part 1 – Safety Standard for Electrical Installations. This material is not the complete and official position of CSA Group on the referenced subject, which is represented solely by the Standard in its entirety. While use of the material has been authorized, CSA Group is not responsible for the manner in which the data are presented, nor for any representations and interpretations. No further reproduction is permitted. For more information or to purchase standard(s) from CSA Group, please visit store.csagroup.org or call 1-800-463-6727.

Related Articles


Latest Articles

  • Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    Declines in Ontario and Manitoba Construction Intentions Push Down the Non-Residential Sector

    December 16, 2024 The total value of building permits issued in Canada decreased by $399.1 million (-3.1%) to $12.6 billion in October. This comes on the heels of a strong September, during which construction intentions rose by $1.3 billion to the second-highest level in the series. Despite the monthly decline in October, the total value of building permits… Read More…

  • Lighting Control Basics for Home Automation

    Lighting Control Basics for Home Automation

    By Matthew Biswas Do your eyes roll when you hear terms like Smart home technology?  Or are you a true believer?  As it turns out controlling electrical devices via low-voltage technology can be easier to implement and use than many of us thought. The Lutron Caseta system uses the internet and Radio Frequency to instantly… Read More…

  • Grounded in Ontario: The Future of Energy Storage Systems

    Grounded in Ontario: The Future of Energy Storage Systems

    December 16, 2024 Technical Advisor Trevor Tremblay explains why following best practices and relying on licensed professionals will ensure a smooth and secure transition when integrating this exciting new technology. Energy Storage Systems (ESS) are revolutionizing the way individuals and businesses manage energy, providing cost-saving opportunities, increased energy reliability, and a pathway toward sustainability. In… Read More…

  • 4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    4 in 5 Canadians See Electrifying Public Transit as Key to Advancing Climate Action, Schneider Electric Survey Finds

    December 13, 2024 Schneider Electric has released new survey findings showing Canadians are increasingly concerned about the environmental impact of traditional public transit emissions. According to the survey, 83 per cent of Canadians recognize the need for electrified transit to support a sustainable future and are seeking actionable and innovative solutions to ease the nation’s… Read More…


Changing Scene